FY21 Savannah Inner Harbor Maintenance Dredging

Closed
W912HN21S5006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the complete rehabilitation and improvement of the Pennsauken Community Pool under solicitation number 2026-BID-15. The scope of work includes significant structural improvements to the pool, the demolition and construction of the pool mechanical room, electrical upgrades, and the installation of plumbing and other general complex upgrades. Specific deliverables include reinforced concrete flooring and walls, sandblasting the pool interior, and the installation of two 25 by 25 foot shade structures. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction, the Americans with Disabilities Act of 1990, and New Jersey Prevailing Wage Act requirements. Bids must be submitted electronically via the OpenGov Procurement Portal by November 10, 2026, at 10:30 AM. The contract will be awarded to the lowest qualified responsible bidder. Submission requirements include a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, a Certificate of Non-Debarment, and signed acknowledgments for Addenda 01 and 02. The successful contractor must provide a performance bond within three days of the contract award. The initial contract period is one year, with a possible one-year extension upon mutual agreement. Payment will be processed through the Township Governing Body following certification by the Township Engineer and the submission of itemized invoices and certified payrolls.
Procurement

POSTED

about 16 hours ago

DEADLINE

in 11 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Savannah, GA, USA

Set-Aside

NONE

Documents

2

A.01+SOW+_nav+4-20-2021.pdf

PDF

Savannah+Inner+Harbor+Dredging+Requirements.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Savannah
Contacts2 people available
OfficeSAVANNAH, GA, 31401-3604, USA
Office AddressSAVANNAH, GA, 31401-3604, USA

Full Description

Show more
The Savannah District Corps of Engineers is requesting information regarding the market capabilities of potential contractors that can perform FY21 Savannah Inner Harbor Maintenance Dredging. This is a Sources Sought/Request for Information only. This is not a Solicitation Announcement, nor is it a Request for Proposal. This request does not obligate the Government in any contract award. The U.S. Army Corps of Engineers, Savannah District is issuing the sources sought as a means of conducting market research to identify parties having an interest in and the resources to support the requirement for civil works construction. The result of this market research will contribute to determining the method of procurement. Applicable NAICS code is 237990 with a size standard of $30 Million. The potential magnitude for this requirement is estimated between $10 Million to $25 Million dollars. Inquiries will only be accepted via email to Contract Specialist, Mrs. Arcia E Fusi at contact@example.gov, please CC the Contracting Officer, Ms. Whittni C. Hiscox at contact@example.gov. The attached request for Information sheet should be completed and submitted no later than May 6, 2021 at 12:00 pm. Eastern. This is not a solicitation. This posting is a Sources Sought Notice only. Work may include but not limited to the following: Statement of Work FY21 Savannah Inner Harbor Maintenance Dredging The Savannah Inner Harbor Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be one year from Notice to Proceed. Up to four million cubic yards of maintenance material is expected to be removed from the inner harbor. The work is located in the deep draft Savannah Harbor navigation project in Georgia. The Savannah Harbor project is located on the border of Georgia and South Carolina (SC) in Chatham County. The Savannah Inner Harbor channel's existing project depth is -42.0 ft. MLLW and 500 ft. wide to the upper end of Kings Island Turning Basin: -36.0 ft. MLLW and 400 ft. wide to the upper end of Argyle Island Turning Basin; and -30.0 ft. MLLW and 200 ft. wide to the upper limit of the project. Refer to Table 1 for the Savannah Inner Harbor stationing and depths which include current depths and post-SHEP depths. The Savannah Inner Harbor channel is undergoing a deepening project (SHEP) from stations 0+000 to 103+000 and Kings Island Turning Basin. The project also includes the construction of channel wideners which will also be required dredging for this project. The deepening is scheduled to be completed in December 2021. Savannah Harbor's Kings Island Turning Basin (KITB) is the primary turning basin for large civilian and military ships, lying adjacent to the Georgia Ports Authority docks. KITB requires dredging twice a year to allow the loaded ships to freely turn when using the port. Approximately 1.6 million cubic yards of maintenance material is removed from the KITB annually. Current project and advance maintenance depths authorized for Savannah Inner Harbor are below. The Inner Harbor is expected to undergo a deepening which will alter the project depth by -5 ft. MLLW. Deepening of portions of the Savannah Inner Harbor may be completed during this contract and required maintenance dredging depth may be adjusted accordingly. Other contractor(s) may be working for the Savannah District on the Savannah Harbor, to include confined upland dredged material containment areas and designated staging areas. If such work occurs, the contractors shall coordinate activities under the direction of the Contracting Officer. All material dredged from the Savannah Inner Harbor shall be placed in upland confined disposal areas adjacent to the Savannah River, with DMCA-12A receiving the majority of the maintenance material. Savannah confined upland disposal areas DMCAs 12A, 13A, 13B and Jones Oysterbed Island are owned by local sponsor Georgia Department of Transportation. Disposal areas DMCAs 14A and 14B are owned by the Joint Project Office of the Georgia and South Carolina Port Authorities and portions of DMCAs 2A and Jones/Oysterbed are owned by the Georgia Department of Transportation and the US Fish and Wildlife Service, and DMCA 1N is owned entirely by the US Fish and Wildlife Service. The Federal Government holds existing easements on all confined upland disposal areas in the Savannah Harbor except DMCA 1N which has a Memorandum of Understanding. Environmental windows limit the timing of dredging in the Savannah Inner Harbor. The environmental windows in Savannah include a Striped Bass spawning window (2 weeks within the 1 April through 15 May timeframe) which limits the amount and timing of dredging above station 63+250 (River Mile 12), and a dissolved oxygen window (approximately July 1 through September 30). An environmental window also exists for sturgeon between 1 May and 30 October annually, no dredging is allowed above station 105+500, cutterhead dredging below 105+500 during those months will monitored for sturgeon take. Certain reaches of O&M sediments may contain cadmium (Cd) in levels significant enough to harm foraging avian species in the DMCAs. Therefore, O&M sediments in those reaches will be tested by the Government prior to dredging. If Cd is found in those sediments equal to or greater than 4 mg/kg, then options will be exercised that include disposal of the sediments in specific DMCAs under special handling conditions. Obstructions are objects or materials in the channel/dredging prism template and side slopes which are unknown to exist when encountered by the dredge or identified by pre and post hydrographic surveys, and monthly condition surveys. Obstructions are objects which cannot be removed by a hydraulic pipeline dredge. The Contractor may encounter obstructions during dredging operations and must remove the objects or materials to provide the required section as shown on the cross-section plates. If the Contractor elects to perform maintenance dredging with a hydraulic cutterhead dredge, the dredge must act as a probe for obstructions. If an obstruction is found in the dredging prism options will be exercised that include diving and obstruction removal to remove the obstacle from the dredge prism. The object removed will become the property of the Contractor. The depths indicated below also have an optional -2.0 of allowable pay overdepth added to the required depth if the contractor decides to excavate this additional material. A limitation on disturbance of materials is in effect for the Savannah Inner Harbor Channel. The no disturbance depths are as follows: -54 ft mllw between Stations 0+000 and 24+000, which is -3.0 ft below the allowable overdepth of -51.0 ft mllw. The disturbance depth is limited to -56.0 ft mllw between stations 24+000 and 35+000, which is -3.0 ft below the allowable overdepth of -53.0 ft mllw. The disturbance depth is limited to -58.0 ft mllw between stations 35+000 and 37+000, which is -3.0 ft below the allowable overdepth of -55.0 ft mllw. The disturbance depth is limited to -56.0 ft mllw between stations 37+000 and 70+000, which is -3.0 ft below the allowable overdepth of -53.0 ft mllw.-52 feet MLLW from Station 102+000 to Station 103+000 which is 3 feet below the allowable overdepth elevation. Disturbance depth is limited to -54 feet (ft) MLLW throughout the rest of the channel and -60 ft MLLW in the KITB and transition (to Station 102+000). Disturbance depth is defined as the lowest elevation the cutterhead reaches to achieve grade and does not apply to spuds and anchors. If the Government determines that the indicated disturbance depth has been exceeded, cease dredging operations for a maximum of 48 hours and consult with the CO to prevent future disturbances and to determine remediation to the affected areas. The Government will not compensate the Contractor for delays and associated expenses and costs incurred by the disturbance of materials below the defined limits. Table 1. Savannah Inner Harbor Advanced Maintenance Locations and Depths (See SOW Attachment) See attachments for further details. If you are interested in this project and/or your organization has the potential capacity to perform these services, please submit the following to the Point of Contacts (POC) information listed below: 1. Name and Address of your Firm 2. Point of Contact (name/phone/email) 3. Company website 4. Data Universal Numbering System (DUNS) number (http://www.dnb.com) 5. Commercial and Government Entity (CAGE) code (http://www.dlis.dla.mil/cage_welcome.asp) 6. Business Size, to include designation as HUBZone, 8(a), Service Disabled Veteran Owned Small Business, Small Disadvantaged Business, Woman- Owned Business, and Large Business. The Government must be able to verify SBA certification of HUBZone, 8(a), and SDB via the System for Award Management (SAM) (http://www.beta.sam.gov/) 7. Bonding Capability for your firm in terms of single and aggregated bonding 8. Capability statement addressing the particulars of this effort, with appropriate documentation supporting claims of organizational and staff capability. Please state if you have experience in performing in performing dredge operations. Please note that the maximum approximate required dredging depth of -70.0 MLLW. If significant subcontracting (self-performance is less than 40%) or teaming is anticipated in order to deliver technical capability, organizations should address the administrative and management structure of such arrangements to include the percentage anticipated to be self-performed by each party.

More opportunities from Department Of Defense → W074 Endist Savannah

Same awarding agency

NAICS: 236220
New
Federal
Infantry Platoon Battle Course (IPBC) Fort Bragg, North Carolina
Solicitation # W912HN26BA005
The U.S. Army Corps of Engineers Savannah District is soliciting bids for the construction of a standard Automated Infantry Platoon Battle Course (IPBC) at Fort Bragg, North Carolina, under solicitation W912HN26BA005. This is a Full and Open Competition for a single Firm-Fixed-Price contract using NAICS code 236220, with an anticipated construction magnitude between $10 million and $25 million. The project scope includes the construction of the IPBC, a small arms range operations control area, a small control tower, an operations and storage building, covered bleachers, a covered mess, an ammunition breakdown building, latrine pads, and supporting infrastructure such as electric service and information systems. The period of performance is 720 calendar days following the notice to proceed. Technical requirements emphasize comprehensive civil, structural, and electrical work, including the installation of metal roof and wall panels, underground electrical distribution, and a complete outside plant telecommunications system. The project incorporates cybersecurity and sustainability measures, as well as Post Construction Award Services. Bids must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. Following several amendments to revise drawings and specifications, the final bid opening date is October 30, 2026, at 2:00 PM local time. Offerors must maintain active registration in the System for Award Management (SAM) to be eligible for award.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in about 1 hour
View Details
NAICS: 236220
New
Federal
Market Intelligence Notice – Child Development Centers (CDC) - Volumetric modular housing, Kit-of-Parts facilities, 3-D Printed
Solicitation # W912HN26MICDC
The U.S. Army Corps of Engineers, Savannah District, is conducting a market intelligence effort to identify industry capabilities for the construction of permanent Child Development Centers (CDC) across multiple military installations. The government is specifically seeking information on modern industrialized construction methods, including volumetric modular housing, Kit-of-Parts facilities, 3-D printing, and hybrid solutions, to improve project schedules, costs, and lifecycle outcomes. All facilities must comply with Department of Defense Unified Facilities Criteria 1-200-01. Forecasted projects include several facilities at Fort Bragg, North Carolina, ranging from a 26,900 square foot center for older children to large centers up to 54,000 square feet, as well as a 41,000 square foot facility at Robins Air Force Base, Georgia. These centers will require comprehensive supporting infrastructure, including outdoor play areas with safety surfacing, commercial kitchens, administrative spaces, and advanced security and energy monitoring systems. This request for information is for planning purposes and does not constitute a formal solicitation. Interested parties must submit a capability statement in PDF format and complete an online survey by November 20, 2026. The government is requesting detailed information on corporate experience, commercial best practices, supply chain logistics for long-lead items, and the ability to integrate complex structural and utility designs across different construction types.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS