Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on July 10, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FY23 Savannah Inner Harbor Dredging

Closed
W912HN23S5002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

GA, USA

Set-Aside

NONE

Documents

3

FY23 Savannah Inner Harbor Maintenance Dredging Specifications

PDF, High priority: read this firstspecifications
High

W912HN-CWK0631 Drawings Draft - Actuator Specifications

PDF, High priority: read this firstspecifications
High

POC Contact Information Form

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Sources Sought

Deadline changed

Response deadline changed from Dec 6, 2022 to Dec 14, 2022.

Deadline changed

Response deadline changed from Dec 14, 2022 to Dec 21, 2023.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Savannah
Contacts2 people available
OfficeSAVANNAH, GA, 31401-3604, USA
Office AddressSAVANNAH, GA, 31401-3604, USA

Full Description

Show more
INTRODUCTION The Savannah District Corps of Engineers is requestin information regarding the market capabilities of potential contractors that can perform FY23 Savannah Inner Harbor Maintenance Dredging. This request does not obligate the Government in any way to post a solicitation or award a contract. Information received will be considered for the purpose of market research and determining how to best move forward with the procurement. Applicable NAICS code is 237990 with a size standard of 27.5 Million. The potential magnitude for this requirement is estimated at more that $10,000,000 dollars. Inquires will only be accepted via email to Contract Specialist, Mr. Rohan Bryan at contact@example.gov, or Contracting Officer, Ms. Glenda Canty at contact@example.gov. The request for Information Sheet should be completed and submitted no later than December 06, 2022 at 11:00 am, Eastern Standard Time. THIS IS NOT A SOLICITATION. THIS POSTING IS A SOURCES SOUGHT NOTICE ONLY. SCOPE OF WORK: The Savannah Inner Harbor Dredging Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge, and the duration is expected to be one year from Notice to Proceed. Up to four million cubic yards of maintenance material is expected to be removed from the inner harbor. The work is located in the deep draft Savannah Harbor navigation project in Georgia. The Savannah Harbor project is located on the border of Georgia and South Carolina (SC) in Chatham County. The Savannah Inner Harbor channel is 47 ft. deep MLLW and 500 ft. wide to the upper end of Kings Island Turning Basin: 36 ft. deep MLLW and 400 ft. wide to the upper end of Argyle Island Turning Basin; and 30 ft. deep MLLW and 200 ft. wide to the upper limit of the project, Savannah Harbor's Kings Island Turning Basin (KITB) is the primary turning basin for large civilian and military ships, lying adjacent to the Georgia Ports Authority docks. KITB requires dredging twice a year to allow the loaded ships to freely turn when using the port. Up to 1.6 million cubic yards of maintenance material is removed from the KITB annually. Other contractor(s) may be working for the Savannah District on the Savannah Harbor, to include confined upland dredged material containment areas and designated staging areas. If such work occurs, the contractors shall coordinate activities under the direction of the Contracting Officer. A majority of the material dredged from the Savannah Inner Harbor must be placed in upland confined disposal areas adjacent to the Savannah River. Savannah confined upland disposal areas DMCAs 12A, 13A, 13B and Jones Oysterbed Island are owned by local sponsor Georgia Department of Transportation. Disposal areas DMCAs 14A and 14B are owned by the Joint Project Office of the Georgia and South Carolina Port Authorities. Portions of DMCAs 2A and Jones/Oysterbed are owned by the Georgia Department of Transportation and the US Fish and Wildlife Service. DMCA 1N is owned entirely by the US Fish and Wildlife Service. The Federal Government holds existing easements on all confined upland disposal areas in the Savannah Harbor except DMCA 1N which has a Memorandum of Understanding. Environmental windows limit the timing of dredging in the Savannah Inner Harbor. The environmental windows in Savannah include a Striped Bass spawning window (2 weeks between approximate dates 1 April through 15 May timeframe) which limits the amount and timing of dredging above station 63+360 (River Mile 12), and a dissolved oxygen window (approximately July 1 through September 30). To protect sturgeon aggregation areas in the upper river, no dredging is allowed above STA 105+500 1 May through 31 October. Certain reaches of O&M sediments may contain cadmium (Cd) in levels significant enough to harm foraging avian species in the DMCAs. Therefore, O&M sediments in those reaches will be tested by the Government prior to dredging. If Cd is found in those sediments equal to or greater than 14 mg/kg, then options will be exercised that include disposal of the sediments in specific DMCAs under special handling conditions. Obstructions are objects or materials in the required side slope cross sections or in the existing ground surface which are unknown at the time of encounter by the dredge or identified by pre and post hydrographic surveys, and monthly condition surveys. Obstructions are objects which cannot be removed by a hydraulic pipeline dredge. The Contractor may encounter obstructions during dredging operations and must remove the objects or materials to provide the required section as shown on the cross-section plates. If the Contractor is performing maintenance dredging with a pipeline dredge, the dredge must act as a probe for obstructions. The object removed will be the property of the Contractor unless it has been determined to be culturally significant. The base contract will include mobilization/demobilization, maintenance dredging, moves, dive team diving, and equipment rental for obstruction removal. Contract options include Cd dredging with placement to the backside of DA 14B and maintenance dredging as cap material placed on top of the Cd dredged material. If you are interested in this project and/or your organization has the potential capacity to perform these services, please submit the attached Point of Contacts (POC) information.

More opportunities from Department Of Defense → W074 Endist Savannah

Same awarding agency

NAICS: 236220
New
Federal
Market Intelligence Notice – Child Development Centers (CDC) - Volumetric modular housing, Kit-of-Parts facilities, 3-D Printed
Solicitation # W912HN26MICDC
The U.S. Army Corps of Engineers, Savannah District, is conducting a market intelligence effort to identify industry capabilities for the construction of permanent Child Development Centers (CDC) across multiple military installations. The government is specifically seeking information on modern industrialized construction methods, including volumetric modular housing, Kit-of-Parts facilities, 3-D printing, and hybrid solutions, to improve project schedules, costs, and lifecycle outcomes. All facilities must comply with Department of Defense Unified Facilities Criteria 1-200-01. Forecasted projects include several facilities at Fort Bragg, North Carolina, ranging from a 26,900 square foot center for older children to large centers up to 54,000 square feet, as well as a 41,000 square foot facility at Robins Air Force Base, Georgia. These centers will require comprehensive supporting infrastructure, including outdoor play areas with safety surfacing, commercial kitchens, administrative spaces, and advanced security and energy monitoring systems. This request for information is for planning purposes and does not constitute a formal solicitation. Interested parties must submit a capability statement in PDF format and complete an online survey by November 20, 2026. The government is requesting detailed information on corporate experience, commercial best practices, supply chain logistics for long-lead items, and the ability to integrate complex structural and utility designs across different construction types.
Commercial and Institutional Building Construction

POSTED

about 18 hours ago

DEADLINE

in 23 days
View Details
NAICS: 236220
New
Federal
Market Intelligence: JDWC Progressive Design-Build OTA
Solicitation # W912HN27SA001
The U.S. Army Corps of Engineers Savannah District is seeking market intelligence for the design and construction of the Joint Deployment Warfighting Complex (JDWC) at Fort Bragg, North Carolina. This project will be executed using a Progressive Design-Build delivery method under 10 U.S.C. 2808a Other Transaction authority, with an estimated construction budget of 350 million dollars. The scope involves creating a high-security facility for approximately 750 personnel, featuring secure administrative areas, an operations center, a network operations center, and Sensitive Compartmented Information Facility spaces meeting ICD 705 requirements with RF shielding. Critical infrastructure requirements include advanced wired and wireless networks and fully redundant electrical and mechanical systems capable of providing 14 days of backup power generation. Additionally, the project includes major civil site modifications, such as secure vehicle parking, an antenna pad, and a 0.65-mile extension of the All-American Parkway. The acquisition strategy will utilize a streamlined two-step Qualifications-Based Selection process, beginning with the submission of white papers to shortlist up to three firms, followed by pitch meetings to select the most qualified design-builder. This current notice is for informational and planning purposes only and is not a formal Request for Proposal. Interested parties must submit a capability statement of no more than five pages detailing their bonding capacity and experience with Progressive Design-Build and secure SCIF construction. Electronic submissions in PDF format are due by October 29, 2026, at 4:00 PM Eastern Standard Time to the designated points of contact.
Commercial and Institutional Building Construction

POSTED

3 days ago

DEADLINE

in about 14 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS