FY25-CP-17 Country Club Road Culvert Replacement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Bulloch County Board of Commissioners is soliciting sealed bids from GDOT prequalified contractors for the FY25-CP-E17 Country Club Road Culvert Replacement Project. The scope of work involves removing the existing 42-inch reinforced concrete pipe culvert and replacing it with a new reinforced concrete double barrel box culvert measuring 5 feet by 5 feet. The project also includes related roadway improvements such as fill slope repair, shoulder repair, subgrade and aggregate base construction, asphalt paving, signage, striping, and guardrail installation. The location is approximately 1.5 miles north of the intersection of Country Club Road and Cypress Lake Road in Georgia. Work is expected to begin immediately after the issuance of the notice to proceed, with a strict completion timeline. Substantial Completion and certification must be achieved within 120 consecutive calendar days, and Final Acceptance is required within 150 consecutive calendar days from the notice to proceed. Interested contractors must submit their bids by the deadline of March 27, 2026, with Peyton Fuller serving as the primary point of contact. This project is managed by the Bulloch County Board of Commissioners and aligns with state and local contract requirements.
General Info
Place of Performance
Set-Aside
Documents
4AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 3 days
- Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 7 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
The project shall commence immediately following issuance of the notice to proceed. The Contractor shall achieve Substantial Completion of the work and certification of same within 120 (One Hundred Twenty) consecutive calendar days after the date of the issuance of the Notice to Proceed and shall achieve Final Acceptance of the work within 150 (One Hundred Fifty) consecutive calendar days after the date of the issuance of the Notice to Proceed.
More opportunities from Georgia → Bulloch County Board of Commissioners
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS