Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

FY26-DDOT-TBSA-Work Zone Design and Work Zone Safety Transportation Management Program

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The District of Columbia Department of Transportation is forecasting a contract for the FY26 Work Zone Design and Work Zone Safety Transportation Management Program, aiming to enhance the safety and efficiency of work zones across the city’s transportation infrastructure. This initiative will focus on developing and implementing comprehensive design standards and management strategies that minimize disruptions, protect workers and the public, and ensure seamless traffic flow during construction and maintenance activities. The program is expected to involve advanced planning, engineering expertise, and coordination with multiple stakeholders to align with evolving safety regulations and industry best practices. Although specific details such as funding amounts, contract duration, and selection criteria are not yet finalized, the solicitation is positioned as a forecast with a posted date of July 23, 2026, indicating it is a precursor to a formal procurement process. The work will be performed within the jurisdiction of the District of Columbia, with performance location and other administrative specifics yet to be determined. Interested parties should monitor official channels for the upcoming formal solicitation, as this forecast signals the agency’s intent to secure qualified contractors with specialized experience in transportation management systems, work zone safety protocols, and intelligent infrastructure design.

General Info

DC DOT forecasts FY26 contract for work zone safety and transportation management design.

Agency

District of Columbia → Transportation (DDOT)

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDistrict of Columbia → Transportation (DDOT)
ContactsNo contacts available
OfficeN/A
Organization / Agency
District of Columbia → Transportation (DDOT)
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Training/Major Job Specific

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, potholing, geotechnical and geophysical investigations, LIDAR surveying, BIM/3D modeling, and commissioning planning. Additionally, requirements include environmental assessments, permitting support, hazardous materials surveys, and CPM scheduling. Interested firms, specifically those with DBE, MBE, WBE, and OBE certifications, must contact Kiewit to receive an Invitation to Bid via the Building Connected system by the September 11, 2026, deadline. Responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate the ability to maintain labor harmony, as Kiewit is signatory to several collective bargaining agreements. Plans and specifications are available for review at Kiewit's Costa Mesa, California office.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 5 days
View Details