Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Everett Clamshell Dredging

Active
W912DW26BA006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The solicitation for Everett Clamshell Dredging, under solicitation number W912DW26BA006, was posted on July 14, 2026, with a response deadline of August 7, 2026, at 7:30 p.m. Eastern Time. This is a total small business set-aside under NAICS code 237990 for other heavy and civil engineering construction, excluding dredging and surface cleanup activities. The estimated contract value ranges between $1 million and $5 million and will be awarded as a firm-fixed-price contract. Key amendments to the solicitation include correcting section 13(a) of the 1442, requiring bidders to submit a fillable bid schedule for Section 00 11 00, and updating CLINs to align with that schedule. All necessary attachments, including plans and updated documents, must be reviewed by interested parties. The contracting office is the U.S. Army Corps of Engineers, Seattle District, located in Seattle, Washington, with Brantley Dowell as the primary point of contact and Scott Britt as the secondary. The place of performance details are not specified in the provided data, and all submissions must be made via the official SAM.gov portal.

General Info

Small business set-aside for 250,000 yd³ clamshell dredging in Everett Harbor, Oct 2026–Feb 2027.

Agency

Department Of Defense → W071 Endist SeattleView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Everett, WA, WA

Set-Aside

SBA

Documents

(1)

Amendment+W912DW26BA006+0001.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Type Changed

Solicitation → Presolicitation

Type Changed

Presolicitation → Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Seattle
Contacts2 people available
OfficeSEATTLE, WA, 98134-2329, USA
Organization / Agency
Department Of Defense → W071 Endist Seattle
View Agency Profile
Office AddressSEATTLE, WA, 98134-2329, USA

Full Description

Show more

July 14th, 2026. Amendment R0001 1) Correct 13 (a) of the 1442. The response date is 7 August 2026 at 12:30pm. 2) Clarification: Return Fillable bid schedule Section 00 11 00 with your bid. 3) Correct CLINs to reflect the Fillable bid schedule. See attachment.


Everett Clamshell Dredging. NAICS 237990 - Other Heavy and Civil Engineering Construction (Exception - Dredging and Surface Cleanup Activities). See Attachments for Solicitation and Plans. The magnitude of construction is estimated to be between $1,000,000 and $5,000,000. The resulting contract will be firm-fixed-price.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2028 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a comprehensive modernization and maintenance initiative for aviation infrastructure at the Port of Seattle, focusing on critical airfield systems and safety enhancements. Key components include replacing aging airfield lighting circuits that exhibit low megger readings with new LED fixtures and signage to improve visibility, energy efficiency, and reliability. The project also involves the replacement of deteriorating pavement sections and vital underground utilities to ensure structural integrity and operational continuity. Wildlife hazard mitigation is addressed through the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on airfield signs to deter birds, and the implementation of regrading and storm drainage systems to eliminate ponding that attracts wildlife. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. This initiative is part of the AIRFIELD 2028 ALL PROJECTS bundled under NAICS code 237990 and is being managed by the Aviation Project Management Group. The procurement is forecasted with a posted date of July 18, 2026, and the primary point of contact is Yanet Maldonado of the Port of Seattle, reachable via phone and email. All work is expected to occur on-site at the airport, with no specified set-aside preferences or small business targeting outlined. The scope reflects a multi-faceted approach to enhancing safety, compliance, and long-term operational resilience across the airfield environment.
Aviation Project Management Group

POSTED

about 2 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract involves a comprehensive modernization and safety upgrade of the airfield infrastructure at the Port of Seattle, focusing on critical systems that enhance operational reliability and compliance with aviation safety standards. Key components include replacing airfield lighting circuits that exhibit low megger readings with new LED lighting fixtures and signs to improve visibility, energy efficiency, and maintenance performance. The scope further encompasses the replacement of deteriorating airfield pavement and essential utilities to prevent failures and ensure uninterrupted airfield operations. Wildlife hazard mitigation is addressed through the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on signage to deter bird activity, and the regrading of areas with ponding issues coupled with new storm drainage infrastructure to eliminate standing water that attracts wildlife. Additionally, the project includes replacing failing flush fire hydrant access hatches to ensure rapid and unobstructed access for emergency services during critical incidents. The work is part of the larger AIRFIELD 2029 ALL PROJECTS initiative under NAICS code 237990, managed by the Aviation Project Management Group of the Port of Seattle. Solicitations for this forecasted procurement are open with Yanet Maldonado listed as the primary point of contact for inquiries. All work will be conducted at the Port of Seattle airfield facilities, with an anticipated timeline aligned with the 2029 planning horizon to coordinate with broader infrastructure upgrades.
Aviation Project Management Group

POSTED

about 2 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
2027 Airfield Project - Contract 1The contract, titled 2027 Airfield Project - Contract 1, issued by the Port of Seattle through its Aviation Project Management Group, encompasses a broad range of airfield infrastructure upgrades aimed at enhancing safety, efficiency, and compliance. Key components include the replacement of airfield lighting circuits with poor megger readings with modern LED fixtures and signs, improving visibility and reliability while reducing long-term maintenance. Simultaneously, failing pavement sections and critical utilities across the airfield will be removed and replaced to ensure structural integrity and operational continuity. Wildlife hazard mitigation is a major focus, involving the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on signs to deter birds, and comprehensive regrading and storm drainage installation to eliminate ponding areas that attract wildlife. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid emergency access and compliance with safety standards. All work is scheduled under a forecasted timeline with a posting date of July 18, 2026, and falls under the NAICS code 237990 for other heavy and civil engineering construction. Primary point of contact for inquiries is Jay Kim of the Port of Seattle, reachable via email or phone, with Mengqi Wu serving as the project manager. The contract is not currently soliciting bids but is posted as a forecast to notify potential bidders of upcoming opportunities. The place of performance is at the Port of Seattle’s airfield facilities, though specific city or state details are not provided in the data. Interested parties are directed to the provided UI link for further information and future solicitation details. The contract is structured without a set-aside designation, meaning open competition is anticipated.
Aviation Project Management Group

POSTED

about 2 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
2027 Airfield Project - Contract 2The contract involves a comprehensive upgrade of airfield infrastructure at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance with aviation standards. Key components include replacing airfield lighting circuits that exhibit low megger readings with new LED lighting fixtures and signage to improve visibility and reduce energy consumption. Simultaneously, failing pavement sections and critical utility systems will be removed and replaced to ensure structural integrity and operational reliability across the airfield. Wildlife hazard mitigation efforts are underway to reduce bird and animal activity near runways and taxiways by removing turf edge dams, installing anti-perching devices on signs, and addressing ponding issues through regrading and the installation of new storm drainage infrastructure. Additionally, deteriorated flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response teams. The project is officially titled 2027 Airfield Project - Contract 2, forecasted for release on July 18, 2026, under NAICS code 237990 for other heavy and civil engineering construction. It is managed by the Aviation Project Management Group under the Port of Seattle, with primary point of contact Moraa Omwega and Project Manager David Neds available for inquiries. All work is expected to take place on-site at the Port of Seattle’s airfield facilities, with no set-aside type specified. The contract reflects a multi-faceted modernization initiative designed to improve safety, reduce maintenance costs, and support long-term airfield sustainability.
Aviation Project Management Group

POSTED

about 2 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
South Cobb Water Reclamation Facility Secondary Clarifier RehabilitationsThe South Cobb Water Reclamation Facility is undertaking the rehabilitation of four of its five secondary clarifiers, with Clarifier #3 having failed and requiring urgent repair. The work encompasses a full range of rehabilitation activities including thorough cleaning of all interior and exterior surfaces, reconstruction of the drive and mechanical systems for Clarifier #3, repairs to deteriorated concrete structures, and recoating of metal components with protective paint. Critical components such as the scum baffle, effluent weirs, scum beach supports, and both inner and outer feed wells will be replaced to restore operational integrity. All specified tasks are detailed in the accompanying construction documents to ensure compliance with technical and safety standards. The project is being managed by the Water System of Cobb County, Georgia, with performance taking place at the facility located in Marietta. Solicitation T3028 was posted on July 17, 2026, and responses are due by August 27, 2026, at 4:00 PM. The procurement is classified under a state and local government (SLED) agency type with no specific set-aside provisions. Interested parties should direct inquiries to Linda Weaver, Senior Administrative Assistant for the Water System, via email at linda.weaver@cobbcounty.gov or by phone at 770-419-6334. All work must be performed on-site at the facility in Marietta, Georgia, with no alternative performance locations permitted.
Water System

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Defense → W071 Endist Seattle

Same awarding agency

NAICS: 212319
New
Federal
Skagit DD1 MaterialsThe contract solicitation W912DW26QA056, titled Skagit DD1 Materials, is a Total Small Business Set-Aside under FAR 19.5 targeting qualified small businesses to supply and deliver aggregate materials for the emergency levee reconstruction near Fir Island, Washington, in response to the December 2025 Western Washington flood event. The required materials include 1,400 tons of Class V Riprap, 300 tons of Spall Rock sized 2"–4", and 200 tons of Topsoil, all to be delivered under a Firm Fixed Price arrangement with a 67-calendar-day performance period beginning upon award receipt, targeting completion by September 7, 2026. Deliveries must be conducted using Solo Dump Trucks or Truck and Transfer systems, with a minimum daily capacity of 350 tons, and materials must meet stringent quality standards including specific gravity no less than 2.60, absorption under 3%, abrasion loss under 20%, and compliance with ASTM and CRD testing protocols for soundness and durability. Drop tests are mandatory under the supervision of the Contracting Officer, and all rock must be sound, clean, angular, and durable. Transportation and delivery are FOB destination, funded by the contractor, to the specified location near Hamilton, WA, with inspection and acceptance handled by W071 Endist Seattle at KO Contracting Division in Seattle. All contractors must be registered in the System for Award Management (SAM) with an active record, including validated Taxpayer Identification Number, CAGE code, and EFT details, and must comply with numerous FAR and DFARS clauses including 52.219-6 for small business set-aside notice, 52.244-6 for commercial subcontracts, 252.204-7012 for safeguarding defense information, and 252.204-7018 prohibiting acquisition of covered telecommunications equipment. Packaging and marking must adhere to MIL-STD-130 and MIL-STD-129 with two-dimensional data matrix symbology per ISO/IEC 16022 for unique item identification, and all deliveries require reporting of unique item identifiers, issuing agency codes, and lot/batch data through the Material Inspection and Receiving Report. Electronic invoicing and receipt documentation must be processed via Wide Area Workflow (WAWF), and contractors must comply with
Other Crushed and Broken Stone Mining and Quarrying

POSTED

2 days ago

DEADLINE

in 3 days
View Details
NAICS: 238910
New
Federal
Skagit County Dike District No. 22 Levee Repair – Equipment w/ OperatorSkagit County Dike District No. 22 is seeking equipment with operator services for levee repair under a total small business set-aside solicitation numbered W912DW26QA060, issued by the U.S. Army Corps of Engineers in Seattle, Washington. The solicitation is open to small businesses as defined by the SBA and is posted under NAICS code 238910, indicating the work involves specialized construction activities related to earthwork and levee maintenance. Proposals must be submitted by July 21, 2026, at 7:30 p.m. Eastern Time, with primary point of contact Vincent Daniels and secondary contact Scott Britt available for inquiries. The performance location is in Washington State, though the exact city is unspecified, and the work requires full provision of all necessary equipment together with qualified operators as outlined in the Scope of Work. Despite the detailed metadata and solicitation structure, critical sections of the contract—including the Statement of Work, pricing, evaluation criteria, special requirements, inspection standards, and contract administration details—are not present in the available documentation, leaving key performance and compliance parameters undefined. The estimated contract value is not disclosed, and no attachments, clauses, certifications, or submission instructions are visible within the provided data.
Site Preparation Contractors

POSTED

4 days ago

DEADLINE

in 3 days
View Details
NAICS: 541330
New
Federal
Notice of Intent to Sole Source - Governor Control ProgrammingThe U.S. Army Corps of Engineers, Seattle District, intends to award a sole-source, firm-fixed-price contract to Emerson Process Management Power & Water Solutions, Inc. for the modernization of five Main Unit Governors at the Libby Dam Project in Montana. The work involves replacing existing pressure switches with pressure transducers and requires OEM-specific programming, PLC/HMI development, and commissioning support exclusively from Emerson due to its proprietary control software, firmware, and diagnostic tools. All work must be performed on a rolling outage schedule between September 1, 2026, and August 30, 2027, with on-site commissioning for the first unit and remote support for the remaining four. Emerson is identified as the sole qualified source because it is the original equipment manufacturer that acquired the previous designer, retains exclusive rights to the system, and any unauthorized modification would void critical technical support, expose the government to full liability, and compromise operational safety and reliability. Despite this intent, the government is soliciting capability statements from other firms to determine if competition is feasible. To qualify, respondents must demonstrate direct, authorized access to Emerson’s proprietary tools and provide written certification from Emerson that their work will not void existing support agreements. Additional proof of relevant experience modifying similar Emerson governor systems is required. All submissions must be sent electronically to the Contract Specialist by 1:00 PM Pacific Time on July 28, 2026. The government retains full discretion to proceed without competition regardless of responses received, and this notice serves only as a formal step to comply with federal acquisition regulations, not as a solicitation or commitment to award or reimburse any costs.
Engineering Services

POSTED

5 days ago

DEADLINE

in 10 days
View Details