Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Defense was posted on September 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FY26 SEARAY BARGE OVERHAUL

Closed
N6264926RA067Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
SLED
QQ - Transmission Overhaul, Marine Repair & Front-Engine Hydraulic Conversion 41 Foot Fiberglass Workboat
Solicitation # QQ-129566
The Virginia Marine Resources Commission is seeking bids from qualified marine repair facilities to perform a major drivetrain overhaul and auxiliary hydraulic system redesign on a 41-foot fiberglass workboat powered by a John Deere 6090SFM85 M3 diesel engine. The scope of work includes the removal and failure analysis of the Twin Disc marine transmission, followed by either a rebuild using OEM parts or a full replacement. Additionally, the contractor must convert the hydraulic system from a transmission-driven configuration to an engine-front-driven configuration using a power take-off drive or crankshaft pulley kit, including the fabrication of marine-grade mounting brackets. All work must be performed by certified Twin Disc representatives at a dry-dock facility located within a 60-mile radius of Queens Creek Marina in Mathews, Virginia, with final sea trials and completion required by December 6, 2026. The contract will be awarded on a total sum basis to the lowest responsive and responsible bidder, with a priority hierarchy favoring DSBSD-certified micro businesses for bids up to 10,000 dollars and DSBSD-certified small businesses for bids up to 100,000 dollars. Bidders must be registered in eVA and provide a detailed itemized cost breakdown for both rebuild and replacement scenarios, a project schedule, and at least three references for similar marine drivetrain or hydraulic projects. Technical inquiries should be directed to Vernon Rowe or Andrew Button at 757-247-2121. All shipping must be FOB destination, and contractors must maintain required insurance coverage and comply with Commonwealth of Virginia legal and anti-discrimination standards.
Marine Resources Commission

POSTED

about 18 hours ago

DEADLINE

in 13 days
NAICS: 336611
New
Federal
USNS WALLY SCHIRRA (T-AKE 8) FY27 MID-TERM AVAILABILITY (MTA)
Solicitation # N0040627R0004
Solicitation N0040627R0004 is a Request for Proposal issued by NAVSUP Fleet Logistics Center Puget Sound for the USNS WALLY SCHIRRA (T-AKE 8) FY27 Mid-Term Availability (MTA). This firm fixed price contract covers a comprehensive repair and maintenance package to be performed OCONUS within the U.S. 7th Fleet Area of Responsibility from January 25, 2027, to March 15, 2027. The scope of work includes general services, hull and structural repairs, propulsion machinery, electrical, communication, navigation, and auxiliary machinery maintenance, with specific requirements for ABS standards and various safety certifications. The government will award the contract based on a best value tradeoff process, where technical approach and past performance are combined and considered significantly more important than price. Proposals must be submitted by 0900 AM EDT on October 16, 2026, and must remain valid for at least 180 days. Required submission materials include a detailed unpriced capabilities statement, a contractor price breakdown, and past performance data. Because the work is performed entirely outside the United States, small business set-asides and subcontracting plans are not applicable. All invoicing must be processed through the Wide Area WorkFlow system, and the Principal Port Engineer is designated as the authority for final acceptance of the work.
Navsup Flt Logistics Ctr Puget Sound

POSTED

about 23 hours ago

DEADLINE

in 9 days
NAICS: 336611
New
Federal
Medium Landing Ship (LSM) Block 1 Post-Delivery
Solicitation # N61177-27-R-3002
The Department of Defense, through the Portfolio Acquisition Executive Maritime and the Amphibious Assault and Connectors Program Office, has issued a Sources Sought and Request for Information for the Medium Landing Ship (LSM) Block 1 Post-Delivery operations. This is a market research effort for informational and planning purposes and is not a formal request for proposals. The anticipated scope of work begins in FY29 and involves post-delivery activities for up to six ships per year over a minimum of four years. The work is structured into three phases: a two-to-three month Fitting Out Availability for Government Furnished Equipment installation, a Trials and Fleet Support Period including an eight-week Final Contract Trials period, and a two-to-three month Post Shakedown Availability to correct deficiencies before vessels sail to OCONUS homeports. Key requirements for interested contractors include the ability to provide pier space for vessels 328 feet in length with a 14.5 foot navigational draft, as well as secure warehousing and classified workspaces for C4I and COMSEC integration. Contractors must demonstrate compliance with DFARS 252.204-7012 for cybersecurity, ITAR and EAR for export control, and MIL-STD-130N for Item Unique Identification. Additionally, the facility must support a crew of approximately 57 personnel with administrative and training spaces and adhere to NAVSUP PUB 573, OSHA, and DOT standards for hazardous materials management. Responses are due by October 26, 2026, and should be limited to 25 pages.
Pae Maritime

POSTED

about 23 hours ago

DEADLINE

in 19 days
NAICS: 336611
New
Federal
COLUMBIA Class Tailcone Manufacture
Solicitation # N0016726R1005
The Naval Surface Warfare Center Carderock Division is soliciting proposals for the manufacture and acquisition of COLUMBIA Class submarine propulsor tailcones. The scope of work includes the procurement of all necessary hardware, materials, and equipment, as well as the performance of requisite engineering services to deliver a maximum of eight tailcone kits. The requirement mandates a minimum of one kit in the first year, with options for an additional seven kits over the period of performance. The contract will utilize a hybrid pricing structure consisting of Fixed Price Incentive Firm Target for hardware, Cost Plus Fixed Fee for engineering services and manufacturing strategy, and Cost No Fee for data and other direct costs. Award will be determined through a best-value tradeoff process, prioritizing technical capability, cost, past performance, and small business participation. Key deliverables include a final certification package, a detailed manufacturing plan, and monthly status and cost reports. The contractor must adhere to strict quality standards, including ISO 9001:2008 or AS9100, and comply with rigorous security requirements for handling Controlled Unclassified Information and classified drawings. Performance will be managed through a series of Contract Data Requirements Lists, including mandatory kickoff meetings and semi-annual program reviews, with final inspection and acceptance occurring at the NSWC Carderock facility in Bethesda, Maryland.
Nswc Carderock

POSTED

about 23 hours ago

DEADLINE

in about 1 month
NAICS: 336611
New
Federal
AIT Follow-on - Sources Sought Notice
Solicitation # N0025327XXXXX
The Naval Undersea Warfare Center, Division, Keyport is conducting market research via a sources sought notice to identify qualified parties for an Alteration Installation Team (AIT) follow-on contract. The requirement involves providing engineering, maintenance, alteration installations, and technical support for various systems on United States Navy and Coast Guard surface platforms, specifically including the Next Generation Fathometer and Carrier Tactical Support System. The scope of work encompasses the installation, removal, and modification of equipment, as well as troubleshooting and repair support for System Operational Validation Tests. Performance will occur at various CONUS and OCONUS locations, including Japan. The contemplated contract will be a Cost-Plus-Fixed-Fee (CPFF) award based on best value, featuring a twelve-month base period with up to four option years. The acquisition falls under NAICS 336611 for Ship Building and Repairing and PSC J998 for Non-Nuclear Ship Repair. Key requirements for the contractor include maintaining a Secret Facility clearance, adhering to NIST SP 800-171 cybersecurity assessments, and possessing an approved NAVSEA 06 Quality Management System. Additionally, the successful offeror must submit a comprehensive Operations Security (OPSEC) Plan and provide certifications for welding, electrical, and fiber optics work. Responses to the sources sought questionnaire are due by 17:00 PST on October 27, 2026.
Naval Undersea Warfare Center

POSTED

about 23 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

Solicitation N6264926RA067 is a firm-fixed-price request for proposal issued by NAVSUP FLC Logistics Center Yokosuka for the FY26 overhaul of the Searay Barge (Large). The project involves comprehensive ship repair work, including towing the barge to and from the contractor's facility, performing visual inspections of the exterior and six ballast tanks, and executing structural repairs and surface preservation. Preservation requirements specify a multi-layer coating system with a required retentive service life of over ten years. The performance period is scheduled from September 21, 2026, to April 15, 2027, with all work performed at the contractor's facility and final acceptance occurring at SRF-JRMC Yokosuka. Award will be granted to the responsible, technically acceptable offeror providing the lowest evaluated price, with technical acceptability based on the sufficiency of proposed labor hours and material costs. Eligible offerors must hold an active U.S. Navy MSRA/ABR Agreement and comply with various FAR and DFARS clauses, including those regarding hazardous material identification, the prohibition of hexavalent chromium, and the use of Wide Area WorkFlow (WAWF) for invoicing. Proposals must be submitted in English and include a detailed price breakdown in Japanese Yen. The final response deadline, as extended by Amendment 0003, is September 10, 2026.

General Info

Navsup Flt Logistics Ctr Yokosuka seeks ship repair services for FY26 SEARAY barge overhaul.

NAICS

336611 - Ship Building and Repairing

Place of Performance

Yokosuka, JP-14, 96349, JPN

Set-Aside

NONE

Documents

24

Attachment I Statement of Work (SOW) for Searay Barge Overhaul

PDF, High priority: read this first6 pages · sow
High

CDRL SOW c.(3) Final Material List

PDF, High priority: read this firstsow
High

N6264926RA0670001 Amendment 0001 - Q&A and SOW Enclosures

PDF, High priority: read this first2 pages · amendment
High

N6264926RA067 Amendment 0002

PDF, High priority: read this first5 pages · amendment
High

N6264926RA067 Amendment 0003 - SF 30

PDF, High priority: read this first5 pages · amendment
High

N6264926RA067 Price Proposal Form for FY26 SEARAY BARGE Overhaul

XLSX, High priority: read this first2 pages · price-proposal-form
High

N6264926RA067 SEARAY BARGE OVERHAUL GFP Attachment

PDF, High priority: read this first2 pages · gfp-attachment
High

Sea-Ray Barge (Large) - SOW Enclosures

PDF, High priority: read this first7 pages · sow
High

Solicitation Amendment 0004 - N6264926RA067

PDF, High priority: read this first2 pages · amendment
High

Solicitation N6264926RA067 - FY26 SEARAY BARGE OVERHAUL

PDF, High priority: read this first28 pages · rfp
High

Attachment III Request for Information Form

PDF, Low priority1 page · rfi
Low

Attachment VI Source of Repair Instruction

PDF, Low priority1 page · other
Low

Attachment V Warranty Tracking Information

PDF, Low priority1 page · other
Low

CDRL SOW a.(3) Paint Schedule

PDF, Low priorityother
Low

CDRL SOW c.(1) Work Summary

PDF, Low priorityother
Low

CDRL SOW c.(2) Details of Working

PDF, Low priorityother
Low

CDRL SOW c.5 Final Condition Report

PDF, Low priorityother
Low

CDRL/SOW Condition Report

PDF, Low priorityother
Low

CDRL SOW Material List

PDF, Low priorityother
Low

Contract Data Requirements List (CDRL) and Repair Plan

PDF, Low priorityother
Low

Contract Data Requirements List (CDRL) / SOW Final Inspection Report

PDF, Low priorityother
Low

Contract Data Requirements List (CDRL) SOW Working Plan

PDF, Low priorityother
Low

Unreadable Contract Data Requirements List (CDRL) and Work Schedule

PDF, Low priorityother
Low

Unreadable Document from Contract Data Requirements List

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 28, 2026 to Sep 4, 2026. The notice description changed.

Notice updated

Response deadline changed from Sep 4, 2026 to Sep 10, 2026. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Flt Logistics Ctr Yokosuka
Contacts2 people available
OfficeFPO, AP, 96349-1500, USA
Office AddressFPO, AP, 96349-1500, USA
Contacts
Kazuo Takamura
Peter Arrieta

Full Description

Show more

The contractor shall accomplish the work specification package as outlined in the provided drawings and specification, and as attached in Section J ATTACHMENT (I). The contractor will be responsible for ship repair work to include providing the necessary management, scheduling, testing, quality assurance, technical documentations to support the SEARAY BARGE FY26 OVERHAUL.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification, or a DoD recognized unique identification equivalent.


Amendments:


Amendment 0001 issued on 19-Aug-2026.


Amendment 0002 issued on 27-Aug-2026.


Amendment 0003 issued on 01-Sep-2026.


Amendment 0004 issued on 03-Sep-2026.

More opportunities from Department Of Defense → Navsup Flt Logistics Ctr Yokosuka

Same awarding agency

NAICS: 336611
New
Federal
YRBM-25 Dry-Docking Selected Restricted Availability (DSRA) and Vessel Transportation
Solicitation # N62649-27-SS-YRBM25-DSRA
Navsup Fleet Logistics Center Yokosuka is conducting market research via a sources sought notice to identify qualified contractors for a comprehensive Dry-Docking Selected Restricted Availability (DSRA) and transportation of the YRBM-25, a non-self-propelled repair, berthing, and messing barge. The project is planned for the first quarter of Fiscal Year 2028 and is divided into three primary phases: the inbound heavy-lift transportation of the vessel from Apra Harbor, Guam, to a contractor facility within a 1,500 nautical mile radius; a repair and maintenance period estimated to last six to eight months; and the return open-ocean tow to a government-designated Pacific port within 1,500 nautical miles of Guam. The scope of work includes dry-docking and undocking, extensive underwater hull inspection and preservation, significant structural steel repairs and renewals, and the inspection and repair of internal voids, tanks, and associated piping systems. Contractors must demonstrate the capability to manage emergent growth work and maintain a robust quality assurance program compliant with industry standards and NAVSEA Standard Items. A successful sea-worthiness inspection is required at the contractor's facility before the vessel can be transported to its final destination. Interested sources must submit their capabilities, facility details, and transportation plans by January 31, 2027.
Ship Building and Repairing

POSTED

5 days ago

DEADLINE

in 4 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS