Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

FY26 Sidewalk Replacement Program Project No. 26-PW-299

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The FY26 Sidewalk Replacement Program Project No. 26-PW-299 is a forecasted infrastructure project for the City of Gilroy, California, focused on the removal and replacement of damaged sidewalks, driveway approaches, park strips, curbs, gutters, and affected asphalt. The scope includes tree replacement, pavement resurfacing, grind and overlay, and concrete flatwork at various locations throughout the city to benefit local residents. The project is classified under NAICS code 237310 and has been determined exempt from the California Environmental Quality Act (CEQA) under Section 15301c, as it involves no expansion of existing facilities and is not expected to have a significant environmental impact. Contractors are required to adhere to strict operational and safety standards, including the implementation of a Storm Water Pollution Prevention Plan and compliance with Caltrans, CA MUTCD, and Cal-OSHA specifications. Key performance requirements include replacing reconstructed elements within five calendar days of removal and providing residents with one-week and 48-hour advance notices before construction begins. The contractor assumes sole responsibility for job site safety and must indemnify the City and Engineer. Additionally, the project mandates specific technical protocols for curb ramp installation, tree root management, and the immediate cessation of work within 100 feet of any archaeological finds until a certified professional evaluation is completed. All concrete forms and sidewalk closures must be approved by the City's Public Works Inspector prior to execution.

General Info

City of Gilroy sidewalk and infrastructure replacement project focusing on safety and compliance.

Agency

California → City of Gilroy

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Gilroy, CA

Set-Aside

NONE

Documents

(4)

Notice of Exemption for FY26 Sidewalk Replacement Program Project No. 26-PW-299

PDFnotice-of-exemption

CEQA Notice for FY26 Sidewalk Replacement Program Project No. 26-PW-299

PDFceqa-notice

26-PW-299 FY26 Sidewalk Replacement Program Plans

PDFspecifications

CEQA Document Declaration for FY26 Sidewalk Replacement Program

PDFceqa-document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Gilroy
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Gilroy
Office AddressN/A
Contacts
Ryan OsentonProject Manager

Full Description

Show more
The FY26 Sidewalk Replacement Program Project No. 26-PW-299 involves the removal and replacement of damaged sidewalk, driveway approaches, park strip, curb and gutter, tree replacement, and affected asphalt with grind and overlay, pavement resurfacing, and concrete flatwork at various locations throughout the City. The beneficiaries of the project are the residents of the City of Gilroy.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Live Oak Avenue And Las Tunas Drive Corridor Traffic Signal Improvements
Solicitation # 41851926
The City of Arcadia is soliciting bids for traffic signal improvements at eight intersections along Las Tunas Drive, from Holly Avenue to Live Oak Avenue, and along Live Oak Avenue, from Santa Anita Avenue to Sixth Avenue. The scope of work includes the installation of conduit, wiring, detector loop cables, poles, pedestrian push buttons, vehicle and pedestrian heads, video detection system cameras, and CCTV cameras. Additionally, the contractor is responsible for constructing ADA-compliant concrete curb ramps and implementing new signing and striping. The project is governed by a unit price contract structure, and the award will be granted to the lowest responsive and responsible bidder based on the total base bid. Eligible bidders must hold A or C-10 licenses and be registered with the Department of Industrial Relations. Required submissions include a bid security of at least 10 percent of the total bid price, with the successful contractor providing performance and payment bonds equal to 100 percent of the contract price. Work must commence within ten days of the Notice to Proceed, and a project schedule is due within 14 days of that notice. The contract includes a one-year warranty period from the date of completion and requires compliance with Cal-OSHA safety programs and Los Angeles County prevailing wage laws. Bids are due by 11:00 A.M. on October 1, 2026, and must be submitted to the Office of the City Clerk in Arcadia, California.
City of Arcadia

POSTED

about 10 hours ago

DEADLINE

in 16 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS