Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on January 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FY27 Unmanned Flight Test Instrumentation Systems and Services

Closed
FY27_PILSFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 17 hours ago

DEADLINE

in 14 days

General Info

NAICS

541330 - Engineering Services

Place of Performance

Washington Navy Yard, DC, 20374, USA

Set-Aside

NONE

Documents

1

Final Truncated SOW PILS FY27-29

DOCX, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Strategic Systems Programs
Contacts1 person available
OfficeWASHINGTON NAVY YARD, DC, 20374-5127, USA
Office AddressWASHINGTON NAVY YARD, DC, 20374-5127, USA

Full Description

Show more

4.0       Synopsis



This is a SOURCES SOUGHT NOTICE (SSN) announcement.  SSNs are issued to assist the Agency in performing market research to determine industry interest and capability.  No proposals are being requested or accepted with this synopsis.  THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. Therefore, no proposals are being requested or accepted in response to this SSN.



5.0       Purpose



In accordance with (IAW) Federal Acquisition Regulation (FAR) Part 10, SSP is conducting market research to determine if sources are capable of successfully performing the requirements identified in this SSN. Specifically, SSP is seeking capable firms to support the high-level requirements as detailed below, including:



SSP requires follow-on engineering services support for U.S. Navy SSP-owned Portable Impact Location System (PILS) operated in support of SSP Trident II flight tests and U.S. Air Force Sentinel flight tests. SSP requires maintenance, operation, sustainment, logistics support, and life cycle management for PILS to ensure the highest availability and maximum data collected during flight tests.



Additional requirements include program management, engineering, and operational support for services relating to design and development efforts, documentation, logistics, engineering, field engineering, hardware, and software deliveries.



The contract type will include Cost Plus Fixed Fee Contract Line Item Numbers (CLINS).  The final delivery will occur 54 months after contract award.



NOTE: Given the highly technical nature of SSP’s mission set as a major weapons systems command and corresponding technical requirements, respondents must provide recent and relevant past performance data (as detailed below) to demonstrate and substantiate the respondents ability to successfully execute requirements detailed in this SSN.



6.0       White Paper Capability Statement Credentials



a.  SSP is seeking detailed, complete, and thorough White Paper capability statements from interested firms who can demonstrate and document, with evidentiary support, that they 1) possess the minimum qualifications and experience identified in paragraph 7.0 which are critical to the successful execution of the requirements, and 2) demonstrate recent and relevant experience, as the Prime contractor (or subcontractor) performing the same/similar efforts of the same/similar scope, size, and complexity to the enclosure (1) SSN SOW requirements identified in paragraph 8.0.  Interested firms must demonstrate their existing capability, or potential to acquire the capability, to meet the enclosure (1) SSN SOW requirements by the time of contract award, estimated to be 1 October 2026.



6.1       Small Business Concerns



IAW FAR Subpart 19.2 Polices, SSP seeks to provide maximum practicable opportunities in its acquisitions to small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns.  Small Business Concerns who possess the minimum qualifications and experience identified in paragraph 7.0 and who can demonstrate its concerns’ capability (or ability to obtain the capability by the contract award date) to execute the complete requirements identified in the enclosure (1) SSN SOW in paragraph 8.0, as well provide the requisite past performance experience detailed in Section 9.0, are encouraged to respond to this SSN.  



If a small business concern intends to partner with another entity, the small business concern must identify which specific enclosure (1) SOW efforts/tasks it intends to perform, as well as the specific efforts/tasks the partner will perform, with the substantiating data required in this SSN supporting the identified partnering roles and responsibilities.  NOTE: 100% of the enclosure (1) SOW and SSN requirements must be addressed in any submitted partnering submittal, if obtainable.



NOTE:  In the event this contract is set aside for small business concerns, the small business concern agrees that it will be in strict compliance and conformance with the percentage payment limitations for services, supplies, or construction (as applicable) to subcontractors that are not similarly situated entities in accordance with FAR 52.219-14 Limitations on Subcontracting and state such in their response.  



7.0       Minimum Qualifications / Experience Requirements



Interested firms shall document and submit specific and evidenced / demonstrated possession of the minimum qualifications and experience requirements in the technical areas identified in bullets “a” through “g” below which are critical to the successful execution of the enclosure (1) SSN SOW requirements in paragraph 8.0.  This experience shall be documented as specified in paragraph 9.0. SSP requires follow-on engineering services support for U.S. Navy SSP-owned PILS operated in support of SSP Trident II Flight Ballistic Missile (FBM) flight tests and U.S. Air Force Sentinel flight tests. SSP requires maintenance, operation, sustainment, logistics support, and life cycle management for the PILS system to ensure the highest availability and maximum data collected during flight tests.



  1. Detailed knowledge of the engineering principles of PILS and acoustic scoring of FBM flight tests.
  2. In depth knowledge and experience in development, production, and deployment of PILS in Broad Ocean Areas.
  3. Detailed knowledge and experience with post-test processing of GPS and acoustic data into an FBM re-entry body score.
  4. In depth knowledge and experience working with the Strategic Systems Programs Operational Directives (ODs), SSP Instructions (SSPINST), and the SSP Technical Program management processes as outlined in the T9001-C CH1.
  5. Thorough understanding of and experience working with the instrumentation support platform, Navy Mobile Instrumentation System (NMIS), used in conjunction with PILS during FBM flight test operations.
  6. Expertise in the field of acoustic scoring and alternative unmanned surface vehicles (USVs) that could be leveraged to meet FBM requirements for the flight test program.


8.0       Description of Requirements 



See enclosure (1) SSN SOW Requirements. 



8.1       Quantity of Personnel Required / Place of Performance



It is anticipated that greater than 25 Full Time Equivalent (FTE) personnel will be necessary to complete the required efforts. Level of Effort and Completion CLINs are identified in enclosure (1). This requirement will entail performance in Cape Canaveral, Florida and various locations.



9.0       Evidentiary Qualifications/Experience Documentation Requirements



Interested firms must possess the requisite minimum qualifications and experience identified in paragraph 7.0 and demonstrated relevant and recent experience as it relates to the enclosure (1) SOW requirements in paragraph 8.0. White Paper Capability statements must include all of the content and details identified below:



9.1       Minimum Qualifications / Experience Requirements Validation



White Paper Capability statement submissions shall include a discrete section with the heading “Minimum Qualifications / Experience Requirements” and document, with specific information, each of the minimum qualifications identified in paragraph 7.0.  This section may cite contract reference efforts detailed in Table A of paragraph 9.2 below provided that respondents provide context and rationale as to how that contract reference effort(s) demonstrate possession of the applicable Minimum Qualifications / Experience requirements of bullets a through f identified in paragraph 7.0 – or have capability of obtaining by contract award.



9.2       Relevant & Recent Experience / Supporting Narratives



In addition to demonstrating possession of the requisite Minimum Qualifications / Experience requirements identified in paragraph 7.0 above (or have capability of obtaining by contract award), interested firms shall demonstrate relevant and recent experience performing the same or similar efforts and or completion tasks (as applicable) to the enclosure (1) SSN SOW requirements in paragraph 8.0.  Relevant experience is defined as performing efforts/tasks similar in scope, size, and complexity as the enclosure (1) SSN SOW requirements with an annual incurred cost/expense of at least $20M.  Recent experience is defined as work performed within 5 years of the SSN posting date.  To substantiate the performance of relevant and recent efforts/tasks to the enclosure (1) SSN SOW requirements, White Paper Capability statements shall provide a list of current or previous contract references and the efforts/tasks performed thereunder detailing and evidencing a direct correlation of the contract reference efforts/tasks to the enclosure (1) SSN SOW using the specific outline provided in Table A below.  Submitter’s responses to the Table A SSN CLIN SOW outline shall include the following information per individual contract reference:



  1. Summary of relevant work performed and how that specific work demonstrates capability to perform the specific requirements identified in the enclosure (1) SSN SOW requirements;
  2. Current / Prior Contract Number(s) and Customer/Agency Supported;
  3. Identification of your role as the Prime or Subcontractor;
  4. Contract Type;
  5. Period of performance of the specific contract reference effort performed;
  6. Quantity of FTE personnel utilized on the specific contract reference effort, per annum, with distinction and FTE quantities identified between the respondents FTE employees and any subcontractor FTE employees;
  7. Net Dollar value (base and options) for each contract reference and the Annual Incurred costs for each contract reference provided which demonstrates the magnitude of those contract references in comparison to the annual estimated value cited in paragraph 9.2 above.  NOTE: solely citing an IDIQ ceiling amount or base and all options aggregate value without the annual incurred costs for the submitted contract reference(s) is NOT acceptable – amounts must be specific to the actual incurred costs for a Contract CLIN(s) or Individual Task Order(s), for the contract reference(s) cited in Table A below; and
  8. Customer point of contact with valid phone number and email.



TABLE A – SUMMARY OF RELEVANT & RECENT WORK EXPERIENCE



CLIN


TITLE


PAST PERFORMANCE


1001


FY27 PILS In-Service Engineering and Maintenance



1002


FY27 PILS Spares Procurement and Repairs



1003


FY27 FTI Capability Study



1004


FY27A PILS U.S. Flight Test Mission Support



1005


FY27B PILS U.S. Flight Test Mission Support



1006


Contract Data Requirements List (CDRL)



1007


Residual Contractor Acquired Property (CAP)



2001


FY28 PILS In-Service Engineering and Maintenance



2002


FY28 PILS Spares Procurement and Repairs



2003


FY28 FTI Capability Study



2004


FY28 PILS U.S. Flight Test Mission Support



3001


FY29 PILS In-Service Engineering and Maintenance



3002


FY29 PILS Spares Procurement and Repairs



3003


FY29 FTI Capability Study



3004


FY29 PILS U.S. Flight Test Mission Support



3005


FY29 PILS U.S. Flight Test Mission Support



3006


FY29 PILS Mid-Cycle Refresh



3008


USAF Sentinel Flight Test Mission Support




10.0     Company Information and Deadline for Submittal



White Paper Capability statements shall be submitted in Microsoft Word for Office 2000 compatible format or PDF format and are due no later than 10 February 2026, 4:30pm EST.  The White Papers shall not exceed 5 pages in total, using 12-point Times New Roman and 1” margin and shall be submitted via e-mail to spn208@ssp.navy.mil.  NOTE: The page count, font size, and margin requirements apply to the entire SSN response, to include any Cover Page, Attachments, Headers, Footers, etc. “excluding” the Company Administrative Information below.  


The Government is seeking detailed content and responses to the SSN requirements over any promotional details, pictures, etc.



ALL White Paper Capability submittals shall include the following Company Administrative Data which is “NOT” included in the aforementioned maximum 5-page limit:



  1. Company Administrative Information


    1. Company Name:
    2. Company Point of Contact (email and phone) and Title:
    3. Company Address:
    4. Unique Entity Identifier (UEI) No:
    5. Cage Code:


  1. Size of business, including; total annual revenue, by year, for the past five years and number of employees;


  1. Ownership, including whether: small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns;


  1. Number of years in business;


  1. Identification of the current security clearance held at your facility that will provide support to the enclosure (1) SOW requirements.  NOTE: Work to be performed under this contract shall require the contractor to have a facility clearance of SECRET and a computing facility that is cleared to process SECRET data.


Respondents to this SSN shall indicate which portions of their response are proprietary/business sensitive and should mark them accordingly.  It is the responsibility of the SSN respondent to monitor the sam.gov website for additional information pertaining to any potential acquisition.



11.0     Government Assessment



The White Paper Capability statement responses to this SSN must meet the requirements stated in the SSN and will be reviewed to determine whether each respondent is capable of performing the requirements.  This review will be based solely on the specific data and supporting content provided by the respondents in their White Paper Capability statement submissions and responses to any follow-on clarification inquires submitted by the Government.  Incomplete or generalized White Paper Capability statements, without specificity as it relates to the SSN content requirements, omitted content, or content which fails to address all of the requirements of this SSN, will have a direct affect upon the Government’s assessment of the White Paper submittal.   The Government’s assessment will include, but is not limited to, the following:



(1) The respondent’s specific and evidenced / demonstrated possession of the Minimum Qualifications / Experience requirements identified in paragraph 7.0;



(2)  The respondent’s demonstrated ability to manage, as a Prime or Subcontractor, the types and magnitude of requirements identified in the enclosure (1) SSN SOW requirements based on their relevant and recent performance of same/similar efforts/tasks in terms of scope, size, and complexity;



(3)  The respondent’s demonstrated technical ability, as a Prime or Subcontractor, to execute the enclosure (1) SSN SOW requirements based on their relevant and recent performance of same/similar efforts/tasks in terms of scope, size, and complexity; and



(4)  The respondent’s demonstrated capacity to execute the enclosure (1) SSN SOW requirements based on their relevant and recent performance of same/similar efforts in terms of scope, size, and complexity, the quantity of personnel required, and the contract award date.



12.0     SSN Disclaimer



This SSN is issued solely for Market Research purposes.  It does not constitute a Request for Proposal (RFP) nor a promise to issue an RFP in the future.  This SSN does not commit the Government to solicit or award a contract.  The information provided in the SSN is subject to change and is not binding on the Government.  Respondents are advised that ALL costs associated with responding to this SSN, including any requests for follow-up information, will be solely at the interested parties’ expense and the Government will not pay for any information or costs incurred or associated with submitting a SSN White Paper Capability statement or follow-on responses. 



The Government reserves the right to consider a set-aside for small businesses or one of the small business preference groups. (e.g., small business, service-disabled veteran-owned small business, 8(a), HUBZone small business, and women-owned small business programs).

More opportunities from Department Of Defense → Strategic Systems Programs

Same awarding agency

NAICS: 541611
Federal
Executive Assistance (EA) Services
Solicitation # N0003026SEC01
The Strategic Systems Programs (SSP) is conducting market research via a Sources Sought Notice to identify capable firms for office management and Senior Executive Service (SES) executive assistance support services for fiscal years 2027 through 2031. The anticipated contract will be a firm fixed price award with a base year and four one-year options, set aside for 8a competed small businesses. The primary objective is to provide comprehensive administrative support to SES leadership at SSP Headquarters in Washington, D.C., and additional office manager support in Florida. Key responsibilities include managing complex executive schedules, coordinating high-level meetings and conferences, processing correspondence according to Navy standards, and managing travel arrangements via the Defense Travel System. The contractor must provide full-time support between 0600 and 1800 Eastern Time, Monday through Friday. Personnel must be proficient in Microsoft Office and capable of obtaining and maintaining a Secret security clearance, with a Final Secret Clearance specifically required for the SSP Security Office position. Evaluation factors for future award will focus on key personnel qualifications, the staffing and management approach, past performance in similar administrative scopes, and the quality control plan. Interested firms must submit a white paper capability statement not exceeding five pages, along with required company administrative data, by April 18, 2027.
Administrative Management and General Management Consulting Services

POSTED

6 months ago

DEADLINE

in 6 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS