FY28 KC-46A Aircraft Beddown Infrastructure Program | Altus AFB, Oklahoma
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The U.S. Army Corps of Engineers, Tulsa District, is soliciting qualifications for the FY28 KC-46A Aircraft Beddown Infrastructure Program at Altus Air Force Base, Oklahoma. This 235 million dollar consolidated capital program utilizes a Progressive Design-Build delivery method under 10 USC 2808a Other Transaction Authority, meaning it is not subject to the Federal Acquisition Regulation. The project aims to modernize infrastructure to support the KC-46A Pegasus tanker, replacing legacy KC-135 operations. The scope includes three primary permanent facilities: a 109 million dollar Aircraft Maintenance Hangar, a 104 million dollar Multipurpose Hangar for corrosion control and fuel cell maintenance, and a 22 million dollar Simulator Facility Phase 4 expansion for classified training operations, along with associated airfield civil site infrastructure. The selection process is a streamlined, qualifications-based competition. Interested parties must submit a 10-page Statement of Qualifications by October 13, 2026, via the PIEE portal. Evaluation is based on a weighted qualitative approach focusing on past performance in aviation facilities, design-build technical approach, and collaborative chemistry, with a pass/fail requirement for a single-project bonding capacity of at least 300 million dollars. Price is not a factor in the initial qualification stage. Up to three teams will be down-selected for pitch presentations, with one firm ultimately awarded a Firm-Fixed-Price agreement. The project is divided into two phases: Phase 1 covering design and pre-construction services, and Phase 2 covering final design and construction, contingent upon FY28 MILCON funding and NDAA authorization. Awardees must also provide a signed attestation of CMMC Level 1 cybersecurity compliance.
General Info
Place of Performance
0, OK, 73523, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
The U.S. Army Corps of Engineers (USACE), Tulsa District is issuing this Request for Qualifications (RFQ) for the design and construction of the FY28 KC-46A Aircraft Beddown Infrastructure Program at Altus Air Force Base, Oklahoma using Progressive Design-Build under 10 USC 2808a Other Transaction Authority.
The KC-46A Aircraft Beddown Infrastructure Program at Altus AFB, Oklahoma, will deliver comprehensive flight-line, industrial maintenance, and advanced aircrew flight simulator training facilities necessary to support the 97th Air Mobility Wing (97 AMW) - the Department of the Air Force’s sole formal training unit for heavy mobility aircraft. This $235M consolidated capital program will modernize the installation's infrastructure to replace Eisenhower-era KC-135 operations with the next-generation KC-46A Pegasus tanker while sustaining concurrent training and maintenance for its legacy fleets.
The program will deliver three primary facility complexes along with associated airfield civil site infrastructure:
- KC-46A Aircraft Maintenance Hangar (General Maintenance)
- KC-46A Multipurpose Hangar (Corrosion Control & Open-Tank Fuel Cell Maintenance)
- KC-46A Simulator Facility Phase 4 (Flight Training Center Expansion)
USACE will use a streamlined competitive selection process to select the most highly qualified design-build team:
- Step 1 – Statement of Qualifications: Interested parties will submit a Statement of Qualifications. The Government intends to down-select up to three Design-Build Teams to proceed to Step 2.
- Step 2 – Pitch Presentations: Selected Design-Build Teams will participate in pitch meetings. One firm will be selected as the Design-Build team for award of the initial design and preconstruction services with a modification for design completion and construction award.
The agreement will be awarded to the most qualified design-build team to provide design development, preconstruction services, and construction. Post-award Phase 1 of PDB includes design and pre-construction services and Post-award Phase 2 includes the final design and construction. The agreement will be Firm-Fixed-Price (FFP). The FFP for successive design and construction milestones will be agreed to as the design progresses and funds become available.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Defense → W076 Endist Tulsa
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS