FY29 PN108808 Nonorganizational Vehicle Parking Garage at Tripler Army Medical Center on Oahu, Hawaii
Open
W9128A27RWP01Federal
Response Deadline
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
Solicitation W9128A27RWP01 is a Progressive Design-Build project for the construction of a Nonorganizational Vehicle Parking Garage at the Tripler Army Medical Center in Oahu, Hawaii. The scope of work includes the demolition of the northern half of the existing parking lot and the construction of a four-level parking garage that is partially on grade and partially structured to balance cut and fill. The project also requires landscaping and vegetative screening to minimize visual disturbance and erosion. This acquisition is executed under Other Transaction Authority pursuant to 10 U.S.C. 2808a, meaning it is not subject to standard Federal Acquisition Regulation procurement procedures. The estimated contract value is approximately 8,582,539 USD.
The project is structured in two phases: Phase 1 covers preconstruction and design services, while Phase 2 covers construction, which is strictly contingent upon statutory authorization in the National Defense Authorization Act and military construction appropriations. The government will select the most highly qualified offeror based on a two-step process involving a Step 1 White Paper and a Step 2 Pitch Presentation. Evaluation factors of equal importance focus on identifying strengths, weaknesses, and risks. Key requirements include compliance with the Davis-Bacon Act, ADA accessibility for parking and pedestrian circulation, and adherence to EM 385-1-1 safety standards. Performance and payment bonds equal to 100% of the construction modification value are required for Phase 2, though not for Phase 1.
General Info
Design-build project for a four-level parking garage at Tripler Army Medical Center.
HighAI Summary for Advanced Modeling FY27 Statement of Work: This document is a draft Statement of Work (SOW) for Advanced Modeling for Fiscal Year 2027. It outlines the requirements for a contractor to provide specialized modeling and simulation services, including the development of high-fidelity models and the integration of simulation tools. The document specifies technical requirements, deliverables, and the need for a qualified workforce with expertise in simulation and modeling.
PDF
PDF, High priority: read this first46 pages · specifications
HighAI Summary for Aqua Engineers Inc. Collection System Design and Construction Protocol: Dated January 2009, this document establishes the design and construction protocols for collection systems connecting to or impacting Aqua Engineers Inc. infrastructure. It details general requirements, design standards based on City and County of Honolulu guidelines, submittal procedures, construction schedules, and specific testing requirements including CCTV inspection, mandrel tests, and manhole vacuum/hydrostatic testing.
DOCX
DOCX, High priority: read this first12 pages · specifications
HighAI Summary for Cost Management Approach Template - TAMC Parking Garage: A project-specific editable template for the TAMC Parking Garage (Honolulu District) establishing the Cost Management Approach (CMA) for a Progressive Design-Build project. It defines the framework for open-book estimating, cost reconciliation, change control, and GMP negotiations, while outlining the roles and responsibilities of Government and Contractor personnel.
DOCX
DOCX, High priority: read this first20 pages · specifications
HighAI Summary for CSRA Report Template Instructions: A template and set of instructions for preparing a Cost & Schedule Risk Analysis (CSRA) report for the U.S. Army Corps of Engineers, Walla Walla District. It provides guidance on updating project information, scope, assumptions, and risk analysis processes for both Civil Works and MILCON projects.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for CSRA Roles and Responsibilities Matrix: A roles and responsibilities matrix detailing the CSRA (Cost and Schedule Risk Analysis) process. It outlines the specific tasks, participants, and deliverables involved in risk identification, the development of the Risk Register, and the creation of cost and schedule models, referencing USACE Non-Army MILCON and ENG 6196 standards.
XLSX
XLSX, High priority: read this first39 pages · specifications
HighAI Summary for CSRA Template - Cost and Schedule Risk Analysis: A technical template and tool for Cost and Schedule Risk Analysis (CSRA) used by USACE, NAVFAC, USAF, and VA. The document includes a detailed change control log tracking updates from 2022 through 2025, focusing on risk register modeling, Crystal Ball forecasts, and confidence level reporting for Civil Works and MILCON projects.
PDF
PDF, High priority: read this first59 pages · specifications
HighAI Summary for DHA-FE Technical Requirements - Divisions 02-48 FY25 Template: Technical requirements document for the Defense Health Agency-Facilities Enterprise (DHA-FE), utilizing the FY25 Template (v.03, 13 Nov 25). It outlines comprehensive technical specifications across various divisions, including architecture, roofing, conveying equipment, mechanical/plumbing, fire protection, and electrical systems.
PDF
PDF, High priority: read this first51 pages · specifications
HighAI Summary for DHA Signage and Wayfinding Guidelines: This document provides the Wayfinding Guidelines and Signage Standards for Military Health System (MHS) facilities. It establishes the requirements for wayfinding master plans, interior and exterior signage, and branding standards to ensure consistency and accessibility (ABAAS/UFAS) across DHA facilities. It serves as a procurement resource and takes precedence over UFC criteria in the event of a conflict.
PDF
PDF, High priority: read this first138 pages · specifications
HighAI Summary for Division 01 General Requirements - W9128A27RWP01: Draft technical specifications for Division 01 General Requirements under contract W9128A27RWP01. The document outlines general requirements for a Design-Build project, specifically covering Antiterrorism/Operations Security (AT/OPSEC) training, installation access, background checks, and work restrictions including scheduling and safety certifications.
PDF
PDF, High priority: read this first50 pages · contract-document
HighAI Summary for Draft Model OT Agreement - FY29 PN108808 Nonorganizational Vehicle Parking Garage: A draft Other Transaction (OT) Agreement for a Progressive Design-Build project concerning a Nonorganizational Vehicle Parking Garage at Tripler Army Medical Center (TAMC), HI. Solicitation No. W9128A27RWP01. The document outlines standard articles including definitions, scope, payment milestones, and technical responsibilities for the Design-Builder.
PDF
PDF, High priority: read this first24 pages · sow
HighAI Summary for Draft Statement of Services - Nonorganizational Vehicle Parking Garage, TAMC: Draft Statement of Services (SOS) for the design and construction of a multi-level, 1,350-space parking garage at Tripler Army Medical Center (TAMC), Oahu, Hawaii. The project addresses parking deficits and accessibility issues with a maximum budget of $184,335,000 for FY29. The document includes a CLIN schedule for schematic and design development submittals and outlines the Design-Builder's duties for preconstruction services.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for Fire Alarm System Guidance for Sustainment, Restoration, Modernization and Military Construction Projects: A memorandum from US Army Garrison, Hawaii (USAG-HI) dated June 2010 establishing a standardization policy for fire alarm systems in new and renovated facilities. The document specifies that only products from Monaco Enterprises, Inc. will be considered to ensure the Directorate of Public Works (DPW) can maintain a consistent stock of spare parts for efficient repair and maintenance.
PDF
PDF, High priority: read this first976 pages · specifications
HighAI Summary for Fort Shafter and Tripler Army Medical Center Transportation Management Study: Final Transportation Management Study (TMS) dated October 2024, prepared by HDR Engineering, Inc. for the U.S. Army Corps of Engineers Fort Worth District and USAG-Hawaii. The document provides a comprehensive analysis of existing conditions, multimodal needs, and transportation improvement packages, including cost estimates and traffic studies for Fort Shafter and Tripler Army Medical Center.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for FY29 Army MILCON 35% Design Timeline: This document outlines the FY29 Army Military Construction (MILCON) 35% design timeline and Code 2 process. It specifies critical milestones from 2025 through 2027, including A/E contract award, PDR due dates (April 15, 2026), and the 35% Certification Package submission to HQUSACE (December 1, 2026) and final approval (February 15, 2027).
PDF
PDF, High priority: read this first12 pages · rfp
HighAI Summary for FY29 PN108808 Nonorganizational Vehicle Parking Garage - TAMC: Program solicitation issued by USACE Honolulu District for the construction of a multi-level parking garage at Tripler Army Medical Center (TAMC), HI. The project utilizes a Progressive Delivery-Build (PDB) model via an Other Transaction (OT) Agreement with total program funding of $184,335,000. The requirement is for a 400,231-SF facility providing approximately 1,350 parking spaces. The procurement is structured in two phases: Phase 1 for preconstruction and design, and Phase 2 for construction. The solicitation includes a detailed milestone schedule for white paper submissions, pitch presentations, and final award.
PDF
PDF, High priority: read this first4 pages · solicitation-instruction
HighAI Summary for Invitation for Pitch Presentation - TAMC Parking Garage (W9128A27RWP01): Draft document for Step 2 of the procurement process for the FY29 PN108808 Nonorganizational Vehicle Parking Garage at Tripler Army Medical Center. It outlines the requirements for a mandatory Pitch Presentation for down-selected offerors, including oral presentation guidelines, government-led Q&A, and live scenario-based problem solving. Evaluation is based on technical understanding, problem-solving, budget discipline, schedule optimization, and innovation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for NPDES SOP for Contractors: Dated February 2025, this document provides a step-by-step Standard Operating Procedure (SOP) for contractors to submit the National Pollutant Discharge Elimination System (NPDES) Notice of Intent (NOI) form via the DOH e-Permitting Portal. It includes instructions for coordinating with the POH Project Manager, managing drainage system information, and preparing the Storm Water Pollution Prevention Plan (SWPPP) in accordance with HAR 11-55.
PDF
PDF, High priority: read this first5 pages · rfp
HighAI Summary for Request for White Papers - TAMC Parking Garage (W9128A27RWP01): A Request for White Papers (RFWP) issued by the USACE Honolulu District for the Tripler Army Medical Center (TAMC) Nonorganizational Vehicle Parking Garage. This is Step 1 of a two-step competitive selection process using Other Transaction Authority (OTA) for a Progressive Design-Build (PDB) project. The document outlines submission requirements for a 15-page White Paper focusing on two factors: Experience and Past Performance, and Key Personnel and Collaboration.
PDF
PDF, High priority: read this first19 pages · specifications
HighAI Summary for Server Room, Computer Room, and Telecommunication Room Design Criteria: Technical Requirements Document (Version 3.0, March 26, 2020) for the Defense Health Agency (DHA). It establishes design criteria and baseline requirements for Server Rooms, Computer Rooms, and Telecommunication Rooms, including business, functional, and non-functional requirements for electrical, HVAC, cabling, and fire suppression.
DOCX
DOCX, High priority: read this first84 pages · specifications
HighAI Summary for Storm Water Pollution Prevention Plan (SWPPP) Template: A template for a Storm Water Pollution Prevention Plan (SWPPP) designed for construction projects. It includes a comprehensive table of contents covering BMP maps, stabilization practices, spill prevention, and waste management. The document references Hawaii Administrative Rules and City and County of Honolulu guidelines, providing a framework for contractors to document compliance with NPDES permits and storm water control measures.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for TAMC FY85 IRB 26 Construct Walkways - Site Plan and Specifications: Technical drawings and specifications for the construction of walkways, including site plans, handicap stall details, and pedestrian crossing layouts. Dated 11/01/2017, the document includes architectural details for pavement, concrete, and accessible elevator zones for the U.S. Army contractor in Hawaii.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for TAMC Nonorganizational Vehicle Parking Garage DD1391: FY 2029 Military Construction project data (DD Form 1391) for the construction of a multi-level parking garage at Tripler Army Medical Center, Hawaii. The project aims to add 850 vehicle spaces to address a significant parking shortfall, with an estimated total request of $207.6 million. The document details primary facilities, supporting infrastructure, and the operational necessity to improve patient access and safety.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for TAMC YR73 Vehicular Parking Addition - Specifications and Boring Logs: Technical specifications and site data for a vehicular parking addition project. The document includes vicinity plans, detailed soil boring logs from 1944 and 1973, soil classification standards (MIL-STD-619B), and construction notes regarding irrigation and drainage for a parking facility.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Tripler Army Medical Center Exterior Lighting Replacement - Area 1: Technical drawings and specifications for the exterior lighting replacement and upgrade at Tripler Army Medical Center (TAMC) in Honolulu, Hawaii. The document includes an index of drawings, demolition plans, new parking lot lighting plans, electrical symbols, panel schedules, and detailed installation requirements for conduits, handholes, and protective stanchions.
PDF
PDF, High priority: read this first121 pages · specifications
HighAI Summary for UFGS-28 10 05 Electronic Security Systems: Unified Facilities Guide Specifications (UFGS) section 28 10 05 for Electronic Security Systems (ESS), dated May 2024. The document outlines technical requirements for Intrusion Detection Systems (IDS), Access Control Systems (ACS), and various security components including biometric scanners and portal control devices.
PDF
PDF, High priority: read this firstspecial-notice
HighAI Summary for USACE INFOSEC Requirements Form - MILCON TAMC Parking Garage: A USACE Information Security (INFOSEC) Requirements Form used to document information sensitivity and cybersecurity controls for a contract action. This specific form relates to the MILCON TAMC Parking Garage project, identifying the requirement for FCI (Federal Contract Information) and specifying a CMMC Level 1 (Self) requirement. Dated 9/21/2026.
PDF
PDF, High priority: read this first40 pages · specifications
HighAI Summary for USACE Recommended Best Practices for Cost & Schedule Risk Analysis (CSRA): Published in March 2024 by the USACE Cost Engineering Center of Expertise, this document outlines recommended best practices and processes for performing Cost and Schedule Risk Analysis (CSRA). It provides guidance on risk analysis methods, responsibilities, model development, and contingency analysis for Civil Works and MILCON projects to ensure compliance with WRDA 2007 and USACE regulations.
PDF
PDF, High priority: read this first4 pages · specifications
HighAI Summary for USAG-HI Construction Site Runoff Control Program Policy: Dated 12 May 2022, this memorandum establishes the Construction Site Runoff Control Program Policy for USAG-Hawaii. It defines requirements for 'large projects' (disturbing one acre or more), including the necessity of Storm Water Pollution Prevention Plans (SWPPP), Letter of Authorization (LOA), and a rigorous inspection schedule (initial, monthly, and final). It outlines compliance with NPDES permits and Hawaii State Department of Health standards, specifying timelines for correcting deficiencies and the enforcement process for non-compliance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for USAG-HI DPW Lighting Standards: Revised 2019 lighting standards for US Army Garrison Hawaii (USAG-HI) projects. The document establishes technical requirements for interior and exterior LED lighting, including CRI, CCT, and efficacy, ensuring compliance with UFC 3-530-01 and IESNA standards for sustainment, restoration, and construction projects.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for USAG-HI Keyless Standard Guidance for Sustainment and Construction: Issued by the US Army Garrison, Hawaii (USAG-HI) Directorate of Public Works, this document establishes standardization policies for locksets in new and renovated facilities. It specifies required lock types for utility rooms, communication rooms, and various housing/administrative buildings, primarily utilizing Kaba Ilco E-Plex and Simplex series. The document includes detailed technical specifications, finish requirements (Satin Chrome 626), and hardware certifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for USAG-HI Policy Memorandum 63: Landscaping with Native Plants: Policy Memorandum USAG-HI-63 establishes guidelines for landscaping on US Army Garrison Hawaii installations. It mandates the use of native Hawaiian plant species for all new construction and land management projects to minimize environmental impact. The document includes recommended lists of native plants (trees, shrubs, ground cover) and authorized non-native, non-invasive species.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for USAG-HI Standard Pavement Thickness for POV Parking Lots and Roadways: A policy memorandum from the USAG-HI Directorate of Public Works establishing standard asphalt concrete (AC) thickness requirements for new vehicular areas. It mandates a minimum of 3 inches of AC for POV parking lots and 4 inches for roadways to ensure adequate pavement life and prevent premature cracking, supported by technical recommendations from an AE Paver Contractor.
PDF
PDF, High priority: read this first16 pages · specifications
HighAI Summary for USAG-HI Water System Standards: Standard Water Distribution Guidance for sustainment, restoration, modernization, and military construction projects at USAG-Hawaii. Revised 15 June 2021, this document establishes technical standards for water distribution and storage systems, referencing UFC 3-230-01 and Honolulu Board of Water Supply (BWS) standards. It covers requirements for cathodic protection, valve installations, vault specifications, and contractor certification (DSO Grade III).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for US Army Garrison Hawaii Policy Memo: CLSM or Nuclear Density Gauge Testing: A policy memorandum from the US Army Garrison Hawaii Directorate of Public Works establishing requirements for backfilling utility trenches in roadways and parking lots. It defines two options for compliance: the use of Controlled Low Strength Material (CLSM) per HDOT Specifications, or compaction testing using a certified Nuclear Density Gauge per ASTM D6938/AASHTO T-310, including specific certification and calibration requirements for contractors.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for Policy Memorandum on Porous Pavement Requirements: A policy memorandum from the Department of the Army, US Army Garrison Hawaii, stating that porous pavements are not authorized for use in the Low Impact Development (LID) Program due to high clay content and concerns regarding structural damage and maintenance.
PDF
PDF, Low prioritydetermination-and-findings
LowAI Summary for REC #5374 - TAMC Parking Garage Construction: Record of Environmental Consideration (REC #5374) dated May 21, 2025, for the proposed construction of a parking garage at the TAMC installation. The document details the proposed design, including a four-level structure with integrated stormwater management and vegetative screening, and includes an environmental impact analysis checklist covering air quality, water quality, and land disturbance.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for USAG-HI Policy Memorandum: Standard Road Closures: Dated August 29, 2012, this policy memorandum from the USAG-HI Directorate of Public Works establishes the requirements and coordination procedures for road closures during construction. It outlines parameters for traffic flow, notification timelines (45-60 days), and the necessity of a Traffic Control Plan (TCP) and Excavation Permit for approval by various Garrison agencies.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseSolicitation
Posted
Solicitation
Response Deadline
Submission deadline
Response Deadline
Ready to pursue this opportunity?
Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.
Organization & Contact Information
Show more
AgencyDepartment Of Defense → W2SN Endist Honolulu
PROGRAM SOLICITATION: Progressive Design-Build under Other Transaction Authority, pursuant to 10 U.S.C. 2808a for the delivery of the FY29 PN108808 Nonorganizational Vehicle Parking Garage, Tripler Amry Medical Center (TAMC), HI.