Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Gabion Basket Supply/Installation

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Township of Perth SouthView Agency

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

This scope was carved out of MD 2026 03.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Murray Drain - Van Straaten cut-off Drain and Kiry Drain

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTownship of Perth South
ContactsNo contacts available
OfficeN/A
Organization / Agency
Township of Perth South
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs gabion baskets for prime contractors on Township of Perth South municipal drainage projects. Performs assembly and placement of galvanized wire gabion baskets and fills them with stone for erosion control or structural support. Delivers completed, installed gabion structures.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
Ruby Creek Park & Ride Construction
Solicitation # ruby-creek-park-ride-construction
The Ruby Creek Park and Ride Construction project involves the development of a fully operational 273-stall facility located near the intersection of SW Sedgwick Road and Sidney Road SW in Port Orchard, Washington. Managed by James W. Fowler Co. for Kitsap Transit, the scope of work encompasses comprehensive infrastructure and passenger amenities. Key deliverables include asphalt paving, curbs, gutters, sidewalks, and stormwater piping, alongside specialized technology such as passenger vehicle chargers, inductive bus chargers, CCTV, lighting, and general utilities. To enhance the passenger experience, the facility will also feature bus shelters, a ticketing kiosk, and restrooms, complemented by professional landscaping. This solicitation is a small business set-aside, and James W. Fowler Co. is actively seeking subcontractor and supplier pricing across various trades and materials. The project emphasizes inclusivity, specifically encouraging participation from minority, women, and disadvantaged business enterprises (M/W/DBE), as well as the utilization of apprentices. To support these efforts, the prime contractor is prepared to divide contract requirements into smaller portions where feasible and assist M/W/DBE firms in securing necessary equipment, supplies, bonding, lines of credit, or insurance. Interested parties can access detailed plans and specifications via the James W. Fowler website, with a response deadline established for September 30, 2026.
James W. Fowler Co.

POSTED

about 2 hours ago

DEADLINE

in 11 days
View Details
NAICS: 238990
New
International
Water Tower Deconstruction, Removal and Disposal
Solicitation # 26-PW-024
The Town of Smiths Falls is soliciting proposals under RFP 26-PW-024 for the deconstruction, removal, and disposal of a multi-legged steel water tower located in Centennial Park. The scope of work includes the complete removal of the tower and its six steel legs from their foundations, the disposal of approximately 260 feet of perimeter fencing, and the removal of the top six inches of sod and topsoil within the fenced area. The contractor is responsible for all supplementary engineering and must ensure the protection of the existing communications building and the eastern stone wall. All activities must adhere to the Occupational Health and Safety Act and industry best practices for handling lead-painted steel structures, requiring a comprehensive lead abatement and exposure control plan, air monitoring, and the use of a qualified occupational hygienist. The selection process uses a consensus approach based on a weighted evaluation, with the technical proposal accounting for 80 points and the financial proposal for 20 points. Technical criteria emphasize demolition methodology, safety plans, experience with similar projects, and the ability to mobilize to the site between October 26 and November 15, 2026. The financial bid must be submitted as a fixed fee lump sum in Canadian dollars. Awarding is subject to the Corporation Purchasing By-Law and Town Council approval. The successful contractor must provide a WSIB Certificate of Clearance and indemnify the Town against all claims resulting from the performance of the work. Final acceptance of the project, including site restoration with topsoil and grass seed, is managed by the Director of Public Works and Utilities.
Town of Smiths Falls

POSTED

about 21 hours ago

DEADLINE

in 17 days
View Details

More opportunities from Township of Perth South

Same awarding agency

NAICS: 237110
New
International
Murray Drain - Van Straaten cut-off Drain and Kiry Drain
Solicitation # MD 2026 03
The Township of Perth South is soliciting lump sum bids for the construction and improvement of several municipal drainage systems, specifically the Murray Drain (Van Straaten Cut-Off), Kiry Drain, Ballantyne Drain, and Van Nes Drain. The scope of work includes the installation of 503 meters of concrete tile and HDPE pipe for the Murray Drain, 1,797 meters of concrete field tile and HDPE sewer pipe for the Kiry Drain, and 330 linear meters of open ditch cleanout for the Ballantyne Drain. Additional requirements involve the installation of catch basins, rodent gates, quarry stone rip-rap bank protection, rock chutes, and the construction of road culverts under Line 29 and sediment basins. Tenderers must be skilled in similar drainage works and provide evidence of licensing in Ontario, along with a tabulation of current contracts and their completion percentages. Submissions must include a bid bond or certified cheque for 10 percent of the tender price and a declaration that at least 75 percent of goods and services originate from Ontario or Canada. The successful contractor is required to maintain 2 million dollars in property damage liability insurance and provide a labour and materials bond for 50 percent of the contract price. Payment is subject to a 10 percent statutory holdback, which increases to 13 percent if the contract is not bonded. Final acceptance of the work is contingent upon inspections by the Engineer or Superintendent to ensure strict adherence to the January 2020 specifications and profile drawings.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 21 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS