Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Township of Perth South is soliciting lump sum bids for the construction and improvement of several municipal drainage systems, specifically the Murray Drain (Van Straaten Cut-Off), Kiry Drain, Ballantyne Drain, and Van Nes Drain. The scope of work includes the installation of 503 meters of concrete tile and HDPE pipe for the Murray Drain, 1,797 meters of concrete field tile and HDPE sewer pipe for the Kiry Drain, and 330 linear meters of open ditch cleanout for the Ballantyne Drain. Additional requirements involve the installation of catch basins, rodent gates, quarry stone rip-rap bank protection, rock chutes, and the construction of road culverts under Line 29 and sediment basins. Tenderers must be skilled in similar drainage works and provide evidence of licensing in Ontario, along with a tabulation of current contracts and their completion percentages. Submissions must include a bid bond or certified cheque for 10 percent of the tender price and a declaration that at least 75 percent of goods and services originate from Ontario or Canada. The successful contractor is required to maintain 2 million dollars in property damage liability insurance and provide a labour and materials bond for 50 percent of the contract price. Payment is subject to a 10 percent statutory holdback, which increases to 13 percent if the contract is not bonded. Final acceptance of the work is contingent upon inspections by the Engineer or Superintendent to ensure strict adherence to the January 2020 specifications and profile drawings.

General Info

Perth South seeks bids for municipal drainage construction and improvements across four specific drains.

Agency

Township of Perth SouthView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(4)

Township of Perth South - Murray Drain and Kiry Drain Tender

PDFitb

Murray Drain - Vanstraint Cut-Off Technical Drawing

PDFspecifications

226179-SET Plan Scale and General Notice

PDFspecifications

Spriet Associates Municipal Drainage Works Specifications - General Work

PDFspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTownship of Perth South
ContactsNo contacts available
OfficeCAN
Organization / Agency
Township of Perth South
View Agency Profile
Office AddressCAN
ContactsNo contact information available

Full Description

Show more
Construction of a new municipal drain to be called the Murray Drain - Vanstratten Cut-Off Drain. The proposed work consists of installation of 503m of 450 to 525mm tile.Construction of a new municipal drain to be called the Kiry Drain including a Van Nes branch. The proposed work consists of installation of 1797m of 450 to 750mm diameter concrete field tile and HDPE sewer pipe, including related appurtenances.Improvements to the Ballantyne Drain. The proposed work consists of 330 lineal meters of open ditch cleanout including quarry stone rip-rap bank protection, rock chutes, construction of road culverts under Line 29 and sediment basins.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves the installation of extensive water infrastructure for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of both contractor-furnished and Metropolitan-furnished valves, including 54-inch and 132-inch diameter valves and tie-ins ranging from 54 to 145.5 inches. Additional structural requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope further encompasses electrical upgrades, instrumentation and controls, piping systems, and specialized civil works such as the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. Bids and subcontractor pricing must be submitted by September 29, 2026, with all negotiations finalized 24 hours prior to the bid opening. The project encourages the use of apprentices and provides specific support for M/W/DBE subcontractors regarding bonding, insurance, and material procurement.
James W. Fowler Co.

POSTED

about 2 hours ago

DEADLINE

in 10 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS