Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on June 3, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Galloway Creek Landscaping Services

Closed
PANGLR-21-P-0000-000780Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
MJCC LAND MAINTENANCE RFQ
Solicitation # mjcc-land-maintenance-rfq
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes for comprehensive ground maintenance services at its campus in Greenville, Kentucky. The scope of work covers approximately 50 acres and 35 or more buildings, requiring mowing to a height of 3 to 4 inches, string trimming, edging, and general cleanup. The contract is for an initial one-year term with four optional one-year renewals. The award will be granted to a responsible offeror whose quote is technically acceptable and represents the lowest price. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. To be considered technically acceptable, offerors must be registered in the State of Kentucky and verified through the SAM portal. Required submission documents include a technical and price proposal, a staffing plan, a safety program, proof of insurance, a description of available equipment, and three references for similar contracts. The contract mandates strict adherence to the Davis-Bacon Act and Contractor Wage Rate Requirements, specifically Wage Determination Number KY20210041. Consequently, contractors must submit weekly certified payroll and a signed Statement of Compliance with every invoice to receive payment. All work is subject to inspection by the Center, and any identified deficiencies must be corrected within 48 hours at no additional cost. Quotes are due by October 30, 2026.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 3 hours ago

DEADLINE

in about 23 hours

General Info

NAICS

561730 - Landscaping Services

Place of Performance

Rochester Hills, MI, 48309, USA

Set-Aside

NONE

Documents

3

01a.+Attachment+1+-+Planting+Area.pdf

PDF

01b.+Attachment+2+-+Prairie+Seed+Mixture.pdf

PDF

Sources+Sought+Information+Request+Form.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Detroit
Contacts2 people available
OfficeDETROIT, MI, 48226-5000, USA
Office AddressDETROIT, MI, 48226-5000, USA

Full Description

Show more
The U.S. Army Corps of Engineers Detroit District is seeking firms that can provide Landscaping Services at Galloway Creek in Rochester Hills, Michigan. This Sources Sought announcement is for planning and market research purposes only and is NOT a Request for Quote or Proposal. No basis for claim against the Government shall arise as a result of a response to this Sources Sought Notice. The Government will not pay for information or comments provided and will not recognize any cost associated with the submission of responses or comments. Interested and qualified companies are encouraged to respond. Description of Required work: The Detroit District completed an ecosystem restoration for a portion of Galloway Creek at the Katke-Cousins Golf Course located on the campus of Oakland University, Rochester Hills, MI. During the restoration, areas of invasive plant species were removed. These areas received multiple invasive treatment during the original project, from September 2017 to December 2020, but were never restored to deter future invasive species encroachment. This work includes seeding, watering and maintaining the designated areas through establishment for a period of one (1) year after contract award. The Contractor will be responsible for the Tasks outlined below. The work area consists of 12 acres, and is shown in Attachment 1, - Planting Area. The work shall consist of the following Tasks; Task 1: Seeding - The Contractor shall prepare seed beds, furnish and sow the required seed on the identified planting areas (Attachment 1). The planting areas have an existing crop or mulch cover. The seed mix is an upland prairie seed mix and is detailed in Attachment 2 - Prairie Seed Mixture. Other acceptable upland prairie mixes must contain 80% of the plant species listed in Attachment 2 with additional suitable prairie species. Any alternative seed mix must be approved by the Contracting Officer, or their designated representative. The mix shall be bagged separately for mechanical drill installation. Use seed within one year of the test date appearing on the label. Seed mixtures shall contain wild type forbs and grasses. Wild type is defined as seed that is derived directly from native, wild stock, including seed that was wild collected and placed into production, or has been harvested directly from native stands. Store delivered seed before use in a way that protects it from damage by heat, moisture, rodent or other causes. Discard and replace any previously tested and accepted seed that becomes damaged. Seed mixtures for the planting areas, unless specified otherwise, shall be composed of seeds of the purity, germination, and proportions, by weight, as given. Seeds will be packaged individually from the nursery. Use seed of the species and varieties listed in Attachment 2. Seeds shall be from Northern Illinois, Northern Indiana, Northern Ohio, or from the states of Wisconsin or Michigan. Seeds with awns or excessive hairs shall be clean and debeard before mixing. For spring seeding of upland prairie seed mixture into ground with existing cover, the Contractor shall mow existing cover to 4 inches or less in height 2 to 4 weeks before seeding. The seasonal seeding window for the Southern Lower Peninsula of Michigan is from April 15th through October 10th. Do not plant when the ground is frozen, snow covered, muddy, or when air temperature exceeds 90 degrees Fahrenheit. Seed with a rangeland type drill with one or more seed boxes that can be calibrated independently to deliver different sized seeds uniformly at the required rate and equipped with a rear-mounted press wheel for each seed drop tube. The pressure on the press wheel needs to be sufficient to ensure seed to soil contact depending on the soil moisture. If seeding into existing vegetation or thatch, use a rangeland type drill equipped with a no-till attachment that can cut through the vegetation or thatch in front of the V disc and seed drop tube. If the configuration of the area to be seeded allows, apply seed at 1/2 the specified seed rate and apply the second 1/2 in a perpendicular direction. Plant seed mixture 1/8 to 1/4 depth. Seed rate for the mix in Attachment 2 is 158.5 oz/acre. Depending on the drill being used, extenders or drill calibration may be required. If a Traux Native Seed Drill is used, the operator has several options to adjust the seed box output of the drill. Seed flow from the small seed box and cool season/grain box is set by moving the shift levers located on the seed boxes. Moving these levers opens and closes the exposed metering flutes in the seed cup. When closing the exposed flute to reduce seed flow, do not close the flutes so tight that they damage the seed as they turn. Output from the fluffy box is set using the derailleur (roller chain on double set of 5 sprockets). When the seeding rate needs further reduction, several approaches can be used. Newer drills can be equipped with an Output Reduction Kit to slow output by 50% from all seed boxes. Seed gaskets and retainer plates provided with the drill can be placed over the picker wheels in the fluffy box. Various sprockets can be changed to adjust output up or down. After mechanical changes have been made to the drill, additives or fillers can be mixed with the seed. This allows you to meter smaller amounts of seed for distribution over a large area. One method to do this is to put the amount of seed to be used on one acre in a five-gallon bucket and add enough extenders to fill the pail. Determine the weight of the seed and extender mix, and calibrate the drill to apply this amount of material over one acre of area. Some materials which have been used successfully as extenders include horticulture grade vermiculite; clean, dry pine sawdust; cotton seed hulls; rice hulls; or on smaller jobs a food grade puffed rice, puffed wheat, or oatmeal or other suitable materials. In all cases after adjustments are made to the drill set up, use the calibration process to determine the drill output for the seed lot or material being seeded. This procedure is described on the decal found on the seed box lid, online Traux videos, and in the Operator Manual. Task 2: Watering - The Contractor shall start watering areas seeded as required by temperature and wind conditions. Water may be drawn from the creek. The Contractor must supply the method of water retrieval and distribution to the seeded areas. Apply water at a rate sufficient to ensure thorough wetting of soil to a depth of 2 inches without run off. During the germination process, seed is to be kept actively growing and not allowed to dry out. If rainfall is not sufficient, keep seeded areas thoroughly moist. Once the seed has germinated, do not let the top inch of soil dry out until the grass has met the establishment requirements outlined below. Apply water in a manner that precludes washing or erosion. The source of water shall be approved by the Contracting Officer, and of suitable quality for irrigation, containing no elements toxic to plant life. Contractor shall continue watering activities and soil moisture to meet the establishment requirements outlined below. Task 3: Maintenance (One Year) - The Contractor shall provide the necessary maintenance, over-seeding, and activities necessary to establish acceptable vegetative coverage. The Contractor shall maintain for one year, until establishment has achieved 80 percent aerial coverage care and replacement on all seeding per 1,000 square foot area. All bare areas greater than two square feet shall be re-seeded. The Contractor shall be responsible for reseeding all areas experiencing less than an 80 percent survival rate, prior to the end of the next (spring or fall) growing season following the completion of seeding, at no additional cost to the Government. It is the Contractor's responsibility to use the appropriate timing and methods to aid in the survival of planted material. Maintenance may require weeding, mowing, supplemental mulching, or waterfowl/grazing control. During the growing season and after planting seed mixture, the Contractor shall mow all seeded areas. Mow vegetation back to 6 inches in height when it has reached a height of at least 12 inches. Equipment must not enter areas of wet soil, and must not result in compaction of the soil through rutting or pitting. Mowing activities after establishment should not cause rutting in the planted areas. The contractor will be responsible for repairing any damaged areas caused by their equipment or work. The vegetation must meet performance criteria set forth above. If the values do not meet the established performance criteria, or if they exhibit a chronic decline, the Contractor must take remedial action to reseed, replant, and steward the deficient areas until the performance criteria are achieved and approved by the Contracting Officer or their Representative. The Government anticipates two (2) visits for maintenance activities. *NOTE: This is a preliminary description of the work to be performed and is subject to change. A final and complete Performance Work Statement will be included upon the advertisement of the solicitation. General Information: The solicitation is anticipated to be advertised by July 2021. The North American Industrial Classification System (NAICS) code is 561730, which has a small business size standard of $8 million. The responses received to this notice shall be in summary format. Please PDF all information as one PDF file for submission. In order for the Government to determine the extent of industry interest and experience in the project, interested contractors shall complete the information attached to this advertisement as a Word Document, Sources Sought Information Form. Please reference in the subject line "SOURCES SOUGHT Galloway Creek Landscaping Services". Please email your submission to the following emails: contact@example.gov contact@example.gov contact@example.gov Respondents will not be contacted regarding their submission or information gathered as a result of the Sources Sought.

More opportunities from Department Of Defense → W072 Endist Detroit

Same awarding agency

NAICS: 237990
New
Federal
Davis Building Rehabilitation
Solicitation # PANGLR-26-P-0000032643
The U.S. Army Corps of Engineers, Detroit District, is conducting market research through a Sources Sought notice to identify capable design and construction firms for the rehabilitation of the historic Davis Building at the Soo Locks Complex in Sault Sainte Marie, Michigan. The project aims to repurpose the early 1900s facility into a support hub for up to 50 maintenance personnel, incorporating locker rooms, break rooms, offices, and updated mechanical, electrical, and IT systems. Key technical requirements include repairing limestone fascia, implementing a comprehensive water mitigation plan for the basement, replacing windows and doors, and constructing a new subterranean locker room and a mezzanine level. The scope also necessitates the abatement of lead, mold, and asbestos and the preservation of a deep central pump well shaft. Due to the secure and remote nature of the site, contractors must be prepared for significant logistical challenges, including the use of barge-based transportation and winter mobilization in a cold-climate environment. The anticipated period of performance is 36 months, consisting of 12 months for design and 24 months for construction, with a formal solicitation expected in Winter 2026. The project is categorized under NAICS code 237990, Other Heavy and Civil Engineering Construction, and may be set aside for small businesses or pursued through full and open competition based on the capabilities demonstrated by respondents.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS