Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on May 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Gantry Bridge/Hoist Systems

Closed
W911RQ26QA013Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333923
New
DIBBS
TENSIONER PULLEY ASSEM
Solicitation # SPE8EE-27-T-0357
Solicitation SPE8EE-27-T-0357 is a request for quotations issued by the Department of Defense, specifically DLA Troop Support Construction and Equipment Manufacturing and Construction, for the procurement of 12 tensioner pulley assemblies under NSN 3950-20-010-7483. The delivery requirement is set for 167 days after the order, with a required delivery date of April 13, 2027, and a need ship date of April 26, 2027. The items are to be delivered FOB Origin to the DLA Distribution DDSP New Cumberland facility in Pennsylvania, where both inspection and acceptance will take place. The contract mandates strict adherence to packaging and marking standards, requiring compliance with ASTM D3951 and MIL-STD-129, while noting that the DLA Master List of Technical and Quality Requirements takes precedence. Palletization must follow RP001 requirements. Invoicing and payment must be processed electronically through the Wide Area WorkFlow system, requiring the contractor to be registered in the System for Award Management. Evaluation of offers will consider technical data packages for any alternate parts provided and will apply the HUBZone price evaluation preference. The solicitation incorporates various FAR and DFARS clauses, including the Buy American Act, cybersecurity reporting under DFARS 252.204-7012, and prohibitions on covered defense telecommunications equipment. Quotations are due by November 9, 2026.
CONSTRUCTION & EQUIPMENT MANU & CON

POSTED

about 3 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contract solicits seven independent gantry crane systems, each equipped with a 1000 lb. pneumatic hoist, for installation at Building 345 of the Red River Army Depot in Texarkana, Texas, to support heavy industrial tire production operations. Each system must be individually sized and configured according to specific dimensional and operational requirements detailed in section 3 of the purchase description, with the vendor responsible for complete turnkey installation including off-loading, assembly, leveling, utility connections, and commissioning. The vendor must conduct thorough site measurements to ensure all spatial and serviceability requirements are met, and delivery is governed by FOB Destination–RRAD terms, with full performance required within six months of contract award. All systems must be new, current-production models compliant with OSHA 29 CFR 1910, NFPA 70, Army Regulation 200-1, and other applicable federal and state regulations, ensuring structural integrity, interchangeability of parts, environmental safety, and maintainability. Accepted deliverables include approved initial drawings (CDRL A0001), comprehensive technical and maintenance documentation (CDRL A0002), and a one-year warranty covering defects in materials, design, or workmanship. The solicitation is a total small business set-aside under NAICS code 333923 with proposals due by May 21, 2026, and is evaluated through a best-value trade-off approach rather than lowest price technically acceptable, weighing technical capability, price reasonableness, and past performance without assigned numerical weights or adjectival ratings. Offerors must be registered in SAM, submit proposals electronically to designated government emails, and comply with strict security requirements including personal identity verification under FAR 52.204-9, NCIC-III and TSDB screening, and adherence to RAMP protocols and installation badge requirements for site access. Work is limited to standard first-shift hours Monday through Thursday, with no work permitted on federal holidays or during RRAD’s Christmas shutdown, and any after-hours work requires 48-hour notice. Payment will be processed electronically via EFT under FAR clauses 52.232-33 and 252.232-7003, and contractor personnel must adhere to ethical conduct standards under FAR 52.203-13 while complying with restrictions on subcontractor sales and trafficking in persons. No contract value estimates are provided, and pricing is entirely

General Info

Delivery and installation of seven customized gantry cranes with 1000 lb. hoists for tire production.

NAICS

333923 - Overhead Traveling Crane, Hoist, and Monorail System Manufacturing

Place of Performance

TX, 75501, USA

Set-Aside

SBA

Documents

6

Combined Synopsis/Solicitation for Gantry Crane Systems W911RQ26QA013

DOCX, High priority: read this firstcombined-synopsis-solicitation
High

Combined Synopsis/Solicitation for Gantry Crane Systems W911RQ26QA013

DOCX, High priority: read this firstcombined-synopsis-solicitation
High

Purchase Description for Gantry Crane Systems at Red River Army Depot

DOCX, High priority: read this firstpurchase-description
High

W911RQ26QA013 Combined Synopsis/Solicitation for Gantry Crane Systems

DOCX, High priority: read this firstcombined-synopsis-solicitation
High

W911RQ26QA013 Questions for Contracting Officer

DOCX, High priority: read this firstq-and-a
High

345+Tire+Shop+Layout+-+Gantry.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from May 7, 2026 to May 21, 2026.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Acc Rrad
Contacts2 people available
OfficeTEXARKANA, TX, 75507-5000, USA
Office AddressTEXARKANA, TX, 75507-5000, USA

Full Description

Show more

This purchase description sets forth the minimum requirements for the delivery and installation of seven (7) each independent gantry crane systems with 1000 lb. pneumatic hoists. The gantry systems will be used to support production operations in a heavy industrial tire shop. Each system shall be independent, and designed in accordance with the characteristics described in this document. The vendor shall be responsible for complete turnkey installation of all components and accessories of the gantry systems. The vendor shall measure and verify dimensional requirements in sufficient detail to establish limits of space in all directions required for installation, operation, and servicing of the gantry systems. Each of the seven (7) gantry systems shall be sized and configured in accordance with its individual requirement. The specific details of each system are described in section 3 of this document. Further information Ref. Purchase Description Attatchment. 


**Extended Date Offers Due to 5-21-2026. 

More opportunities from Department Of Defense → W6QK Acc Rrad

Same awarding agency

NAICS: 333332
Federal
Industrial 3D Printer Supply – Vector Spartan III or EquivalentThe contract entails the supply of a commercial off-the-shelf industrial 3D printer, specifically the Vector Spartan III or an equivalent model, intended for defense or industrial applications. The equipment must meet the technical and performance standards required for high-reliability environments, ensuring compatibility with mission-critical workflows under demanding operational conditions. The procurement is structured as a subcontract under the Department of Defense, with the agency designation W6QK Acc Rrad, and the place of performance is designated as Texarkana. The North American Industry Classification System code 333332 identifies the primary sector as industrial machinery manufacturing, underscoring the specialized nature of the hardware being procured. The solicitation was posted on May 7, 2026, and while no set-aside designation or specific sourcing restrictions are noted, the contract does not include detailed point of contact information or complete geographic details beyond the city of performance. The equipment must be readily available as a commercial product with proven field performance and without requirement for custom modifications, emphasizing efficiency and rapid deployment. The contract supports broader defense industrial base objectives by securing advanced additive manufacturing capabilities for in-house prototyping, tooling, or spare parts production within regulated operational settings.

POSTED

6 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS