Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Agriculture was posted on March 29, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

GAOA 4DB Forest Wide Public Restroom Replacement

Closed
1240LT24Q0027Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

325620 - Toilet Preparation Manufacturing

Place of Performance

Vernal, UT, 84078, USA

Set-Aside

SBA

Documents

5

Forest Wide Public Restroom Replacement SOW

PDF, High priority: read this firstsow
High

Project Location Map - Forest Wide Public Restroom Replacement

PDF, High priority: read this firstspecifications
High

RFQ 1240LT24Q0027 - GAOA 4DB Forest Wide Public Restroom Replacement

PDF, High priority: read this firstrfq
High

Solicitation 1240LT24Q0027 - Experience Questionnaire

PDF, High priority: read this firstpast-performance
High

Wage Determination UT20240079 - Daggett, Duchesne, Rich and Summit Counties, UT

PDF, High priority: read this firstwage-determination
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Ashley National Forest
Contacts1 person available
OfficeVERNAL, UT, 84078, USA
Office AddressVERNAL, UT, 84078, USA

Full Description

Show more
The Ashley National Forest is planning to replace the existing flushing restroom at Antelope Boat Ramp with a new precast flushing restroom. The flush building shall be designed to meet the following criteria: Men's side shall include a sink, urinal, and one flushing toilet and the Women's side shall include a sink and two flushing toilets The contractor shall fabricate, deliver, off-load, and set/assemble the new precast concrete restroom building. The contractor shall provide a toilet building that must be fully accessible and must meet the design standard for naturally ventilated, odor free buildings. The building will be a CXT TAOS or approved equivalent with a footprint of approximately 20'X26. The precast concrete building shall be delivered in a completed state with minimal fieldwork required to replace and complete installation on the site. No paintings except touch up may be completed at the site. No concrete work shall be allowed at the site as part of the building construction. The contractor shall provide a crane and crew to off-load and set the concrete restroom. The contractor shall provide acrew to make sewer and water connections.

More opportunities from Department Of Agriculture → Ashley National Forest

Same awarding agency

NAICS: 237110
New
Federal
Ross Springs Waterline Replacement
Solicitation # 1240LT27Q0022
The Ross Springs Waterline Replacement project, solicitation 1240LT27Q0022, is a total small business set-aside acquisition issued by the USDA Forest Service for work in the Flaming Gorge Ranger District of the Ashley National Forest in Daggett County, Utah. The project involves replacing 4,450 to 4,475 linear feet of abandoned 4-inch asbestos cement pipe with 4-inch HDPE water main, primarily utilizing shallow bury or cleared ground covered with government-sourced imported fill. Additionally, the contractor must cover 1,150 linear feet of existing pipeline with imported fill and install two combination air-vacuum valves with utility boxes, along with various daylight drains, pumpout drains, and connections to existing lateral mains and services. The contract is a negotiated request for proposal with a performance period of 90 calendar days following the notice to proceed, tentatively scheduled to begin in Spring 2027. Award will be granted to the responsible quoter offering the lowest evaluated price among those deemed technically acceptable, with no tradeoffs between price and non-price factors. Technical evaluation focuses on the quoter's capacity, requiring evidence of at least two similar projects completed within the last five years and a detailed plan for staffing, equipment, and material lead times. The project is subject to the Davis-Bacon Act, requiring prevailing wage rates, and mandates compliance with various FAR clauses regarding construction quality, site investigation, and environmental preservation.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS