Ross Springs Waterline Replacement

Active
1240LT27Q0022Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ross Springs Waterline Replacement project, solicitation 1240LT27Q0022, is a firm fixed price contract issued by the Department of Agriculture for the Ashley National Forest in Utah. This total small business set-aside under NAICS 237110 involves replacing 4 inch asbestos cement pipe, which will be abandoned in place, with 4 inch HDPE water main. The scope of work includes the installation of 4,450 linear feet of 4 inch HDPE pipeline, covering 1,150 linear feet of existing pipeline with government-provided fill, and installing two combination air-vacuum valves with utility boxes. Additionally, the contractor will install associated valves, daylight drains, pumpout drains, and connect the system to existing lateral mains and services. The period of performance is 30 days from the notice to proceed. Award is based on a technical evaluation of relevant experience and the ability to meet the schedule, followed by a price evaluation for technically acceptable quotations. The contract is subject to the Davis-Bacon Act and requires a written Quality Control Plan. Key technical requirements include specific piping storage and marking standards, such as NSF-61 compliance, and rigorous testing including tracer wire conductivity and soil compaction tests. All work must adhere to federal, state, and local codes and established industry standards.

General Info

Fixed-price contract to replace 4,450 feet of waterline at Ashley National Forest.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

UT, 84078, USA

Set-Aside

SBA

Documents

5

Ross Springs-Red Canyon Waterline Replacement (1240LT27Q0022)

PDF, High priority: read this first19 pages · rfq
High

Ross Springs-Red Canyon Waterline Replacement Plans

PDF, High priority: read this first10 pages · specifications
High

Solicitation 1240LT27Q0022 - Flaming Gorge NRA Waterline Replacement

PDF, High priority: read this first3 pages · rfp
High

SOW - 1240LT27Q0022 Water Main Replacement

DOCX, High priority: read this first88 pages · sow
High

Wage Determination - Daggett County, Utah (UT20260025)

PDF, High priority: read this first6 pages · wage-determination
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseCombined Synopsis
Posted

Combined Synopsis

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Ashley National Forest
Contacts2 people available
OfficeVERNAL, UT, 84078, USA
Office AddressVERNAL, UT, 84078, USA
Contacts
Derrick A Dodson
Cathleen Christensen

Full Description

Show more

This project includes the replacement of 4” asbestos cement pipe (abandoned in place) with 4” HDPE water main and associated valves and connections to laterals.


  1. The work includes;
    1. Installation of 4450 linear feet of 4” HDPE pipeline, most of which will be shallow bury or laid on cleared ground and covered with imported fill from a government source.
    2. Cover an additional 1150 linear feet of existing pipeline with imported fill from a government source.
    3. Installation of 2 combination air-vacuum valves with utility boxes.
    4. Installing associated valves, daylight drains, and pumpout drains; and connecting to existing lateral mains and services.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves comprehensive wastewater infrastructure upgrades for the City of Belmont in North Carolina. The scope of work includes the construction of 16,435 linear feet of 20-inch ductile iron force main and significant improvements to the Morgans Branch Pumping Station. Key station upgrades include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers and manholes, with a total project estimate of 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MBE/WBE compliance, including an EPA MBE participation goal of 10.9 percent. Bidders must provide a completed EJCDC C-410 Bid Form, bid security, and evidence of authority to sign. The successful contractor will be required to provide performance and payment bonds and maintain proof of insurance. Performance is subject to liquidated damages of 1,000 dollars per day for failure to achieve substantial completion. Payment terms are set at thirty days after presentation to the owner, and the work must adhere to strict technical standards, including AWS D1.2 for welding and NEMA standards for motors.
Don Moorhead Construction, Inc.

POSTED

about 8 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing and restoration, as well as the relining, modification, or replacement of small and large diameter steel and ductile iron pipes and associated supports. Additional requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and the replacement of motor control center components. The project also encompasses electrical and instrumentation improvements, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is specifically targeting DBE, MBE, WBE, and SBE subcontractors, with a focus on services such as lead abatement, metals fabrication, painting, coatings, and trucking. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. Contracting will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions to these documents must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 8 hours ago

DEADLINE

in 26 days
View Details

More opportunities from Department Of Agriculture → Ashley National Forest

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS