This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on August 30, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

GAOA Aspen Carbondale Administration Building

Closed
1240LT23R0076Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 10 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 10 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 10 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes saw cutting reinforced concrete walls, installing a commercial-grade exterior door assembly with panic hardware, and excavating a permanent ADA-accessible egress path with required drainage, retaining walls, and handrails. The contractor must ensure all work is code-compliant, coordinate inspections with the Authority Having Jurisdiction, and restore all affected surfaces to match existing clubhouse architecture. This is a price-based invitation for bids where the award will be granted to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements. Preference is tiered from 100% Colville Business Enterprises down to non-certified Indian-owned businesses, with allowable price differentials based on the total bid amount. Bidders must submit a firm fixed price bid, a performance schedule, a subcontracting plan, and evidence of financial stability, insurance, and licensing by November 20, 2026. The project is expected to be completed by March 31, 2026, though this date is weather-dependent. Final contract terms and payment conditions will be negotiated upon the selection of the successful bidder.
Confederated Tribes of the Colville Reservation

POSTED

about 11 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
SLED
ADA Improvements for Patterson Park and MPD
Solicitation # 1914.02
The City of Murfreesboro is soliciting sealed bids for solicitation number 1914.02, which entails construction upgrades for the Police Headquarters Vestibule and ADA improvements for the Patterson Park Recreation Center Entry. The project is based on AIA Documents A101 and A201 (2017) and requires the contractor to provide high-grade workmanship, including cutting, patching, and the restoration of disturbed structures. Bidders must be licensed General Contractors in the State of Tennessee and registered through the OpenGov procurement portal. The contract will be awarded to the lowest responsive and responsible bidder based on the sum of the base bid and any accepted alternates, with evaluation criteria focusing on experience, financial ability, reputation, and past work history with the owner. Submission requirements include a lump sum base bid, a 5% contingency allowance, and a bid security equal to 5% of the bid, which must be uploaded electronically and delivered physically to the Purchasing Department. The successful contractor must provide performance and payment bonds totaling 100% of the contract sum. Key deliverables include a construction schedule submitted within 21 days of award, various certificates of occupancy and inspection, and specific documentation such as AIA Forms G706, G706A, and G707. The contractor is responsible for quality control and must adhere to strict packaging and marking standards for hardware and wiring, as well as specific waste management and labeling protocols. Payment is processed via Applications for Payment, which must be accompanied by an updated Construction CPM Schedule and a schedule of values.
Facilities

POSTED

about 11 hours ago

DEADLINE

in 23 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Carbondale, CO, 81623, USA

Set-Aside

NONE

Documents

12

1240LT23R0076 - Administration Building Construction

PDF, High priority: read this first2 pages · rfp
High

1240LT23R0076 GAOA Aspen Sopris WR Building Project - RFI Responses

DOCX, High priority: read this first2 pages · q-and-a
High

Aspen-Sopris Ranger District Office Reconstruction RFP

DOCX, High priority: read this first42 pages · rfp
High

Aspen-Sopris Ranger District Office Specifications - Volume 1

PDF, High priority: read this first578 pages · specifications
High

Aspen-Sopris Ranger District Office - Specifications Volume 2

PDF, High priority: read this first514 pages · specifications
High

Carbondale Construction Pre-Bid Q&A (07-27-2023)

PDF, High priority: read this first1 page · q-and-a
High

General Decision CO20230001 - Colorado Building Construction Wage Determination

PDF, High priority: read this first8 pages · wage-determination
High

Project 1402.14: Aspen-Sopris Ranger District Office 100% Construction Documents

PDF, High priority: read this first119 pages · specifications
High

Solicitation for Administration Building Construction - White River National Forest

PDF, High priority: read this firstrfp
High

USFS Aspen-Sopris District Office - Geotechnical Report (Vol 3)

PDF, High priority: read this first188 pages · specifications
High

Carbondale Construction RFI Summary

DOCX, Low priority3 pages · q-and-a
Low

Carbondale Office Reconstruction Pre-Bid Sign-in Sheet (1240LT23R0076)

PDF, Low priorityprebid-attendance
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 21, 2023 to Sep 4, 2023. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 4, 2023 to Sep 6, 2023. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → White River National Forest
Contacts2 people available
OfficeGLENWOOD SPRINGS, CO, 81601, USA
Office AddressGLENWOOD SPRINGS, CO, 81601, USA
Contacts
Lonnie D Root Contracting Officer

Full Description

Show more
Revision 8/30 * Bid Due Date Extended to 09/06/2023 * Period of Performance Extended to 03/28/2025 Documents Added * USFS/Chamberlin Architect Q&A NOTE: Federal Contracts are not exempt from Federal Taxes, and we have no actual authority or responsibility over State Regulations on Colorado State Taxes. - Colorado statute exempts from state and state-collected sales tax all sales to the United States government and the state of Colorado, its departments and institutions, and its political subdivisions (county and local governments, school districts and special districts) in their governmental capacities only (39-26-704.1, C.R.S.). https://tax.colorado.gov/ The Forest Service Colorado Tax Exempt number can be provided to the winning bidder. Revision 8/17 * Bid Due Date Extended to 09/04/2023 * Q&A Posted in Attachmets Revision 7/31 Documents Added * Pre-Bid Checkin List * Pre-Bid Q&A Revision 7/19 Pre-Bid/Site Visit: Date: Thursday July 27th, 2023 Time: 10:00 AM Mountain Daylight Time Location: 620 Main St. Carbondale, Colorado Contact Information: Mike Ross Cell: 970-846-6864 Administration Building Construction White River National Forest Aspen/Sopris District office located downtown Carbondale, Colorado Main office and two associated buildings will be demolished and replaced with one building housing combined functions. Work in the base items includes mobilization; quality control; construction staking and layout; construction of site utilities for water, sewer, natural gas, power and telecommunications; final site grading; parking area construction; and demolition of existing site features and utilities. The existing warehouse/shop on site will remain in place during construction and will not be a part of this project. MAGNITUDE OF CONSTRUCTION PROJECT $5,000,000 to $10,000,000 Full and Open Competition / Firm Fixed Price Award Email Proposals Only sent to Contracting Officer Lonnie D. Root lonnie.root@usda.gov Contracting Officers Representative Mike Ross mike.ross@usda.gov Requisition No: 1094537

More opportunities from Department Of Agriculture → White River National Forest

Same awarding agency

NAICS: 212321
New
Federal
Champion Creek Pit Rock Crushing Supply
Solicitation # 1240LT27Q0008
Solicitation 1240LT27Q0008 is a firm fixed price contract issued by the White River National Forest under the Department of Agriculture for the development of the Champion Creek Pit. Located within the Sawtooth National Recreation Area of the Sawtooth National Forest in Idaho, the project involves producing crushed aggregate surfacing material for forest roads. The scope of work encompasses all necessary site preparation, including clearing, grubbing, topsoil stripping, and overburden removal, as well as material processing, crushing, stockpiling, and final restoration activities. The performance period is scheduled from May 3, 2027, to June 30, 2027. This acquisition is a total set-aside for small business concerns under NAICS code 212321 for Construction Sand and Gravel Mining. Award will be granted to the responsible quoter who submits the lowest evaluated price among those deemed technically acceptable. Technical evaluations are based on a pass/fail basis, focusing on the quoter's ability to meet schedule requirements and comply with the statement of work. The contract is subject to the Davis-Bacon Act and follows FP-14 standard specifications for the construction of roads and bridges on federal highway projects. Quotations were due by November 5, 2026, with an anticipated award date of November 16, 2026.
Construction Sand and Gravel Mining

POSTED

5 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS