HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Solicitation 1240LT27Q0026 is a total small business set-aside for the replacement of the Pacific Crest Trail bridge over the West Fork West Walker River in the Hoover Wilderness. The project involves the complete removal and off-site disposal of an existing steel and timber bridge and the design, fabrication, transport, and installation of a new 6-foot by 35-foot glulam deck panel bridge with timber railing and 30 linear feet of approach railing. Due to the remote location and lack of motorized access, the use of helicopter transports, mechanized saws, drills, and generators is permitted under 36 CFR 251 Subpart B. The work must adhere to Trail Specifications Section 935, ANSI 117 for glulam members, and AWS D1.1 for welding. The contract is a sealed bid with a negotiable period of performance of 120 days, anticipated from July 1, 2027, to October 29, 2027. Award will be granted to the responsible quoter who provides the lowest evaluated price among those deemed technically acceptable. Evaluation factors include the technical approach, past performance, and price. Required submissions include Standard Form 1442, an experience questionnaire, and a past performance data sheet. The contractor must provide performance and payment bonds and comply with Davis-Bacon Act prevailing wage requirements. Quotes are due by November 28, 2026, with an anticipated award date of December 10, 2026.
General Info
Place of Performance
Bridgeport, CA, 93517, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
HUMBOLDT TRAIL BRIDGE REPLACEMENT
Pacific Coast (PCT)
Forest: Humboldt-Toiyabe National Forest (HTNF)
Bridgeport Ranger Station
The purpose of this project is to replace the Pacific Crest Trail (PCT) trail bridge over the West Fork West Walker River. The bridge is located in a remote location of the Hoover Wilderness, where there is no motorized access.
Due to the remoteness of the location, Site Visit will be conducted by Zoom. Offerors are permitted to visit the site at their convenience.
ATTACHMENTS:
C04a ScheduleOfItems_SectionB_1240LT27Q0026
C04b DesignDrawings_1240LT27Q0026
C04c DOL Wage_CA20260020 07.30.2026_1240LT27Q0026
C04d Experience Questionnaire_1240LT27Q0026
C04e Past Performance Data Sheet_1240LT27Q0026
AWARD SCHEDULE:
Site Visit: 11/03/2026 - to be held on Zoom do to location
Q&A Due Date: 11/04/2026
Quotes Due Date: 11/28/2026 - 1700 MT
Anticipated Award Date: 12/10/2026
POP: July/01/2027 - 10/29/2027 = 120 days
Contracting Officer Representative:
Jordan Burge
Civil Engineer - FS-IRR4-HNF-RELMHS
contact@example.gov
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Agriculture → White River National Forest
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
