Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on July 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

GAOA Red Canyon Corridor Paving, Ashley National Forest

Awarded
1240LT26Q0082Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 19 days
NAICS: 237310
New
SLED
Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)
Solicitation # CIP 20083
The Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083) is a public works solicitation by the City of Tustin, California, for the construction of park infrastructure. The scope of work includes site excavation, plumbing, electrical, instrumentation, street improvements, and the installation of a 12-foot multi-modal path and a 6-foot walking trail. The project has an engineer's estimate of 11,100,000 dollars and a project schedule of 190 contract days. Bidders must hold a Class A contractor's license and submit their proposals via the OpenGov portal by December 10, 2026, at 2:00pm. A critical requirement for responsiveness is the submission of the bid bond both as an electronic upload and as a hard copy delivered to the City Clerk. The contract will be awarded to the low bidder based on the total sum of correctly calculated unit prices. The successful contractor must provide a project baseline schedule within 15 calendar days of execution and adhere to strict safety and quality standards, including Cal-OSHA requirements for qualified persons working near utilities and 2008 ADA Standards for Accessibility. Payment is structured as monthly progress payments at 95 percent of the work value, with the final 5 percent retained until 60 days after the recordation of the Notice of Completion. Liquidated damages are set at 8,800 dollars per calendar day for delays. Required post-award documentation includes payment, faithful performance, and guaranty bonds, as well as a compensation insurance certificate.
Public Works

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
CITB 2026C045
Solicitation # 2026C045
Invitation to Bid No. 2026C045 is issued by the Municipality of Anchorage for the Old Seward Highway Surface Rehabilitation project, Phase 2, spanning from International Airport Road to Tudor Road. With an estimated construction cost between 3 million and 5 million dollars, the scope of work includes asphalt pavement rehabilitation, sidewalk and curb replacement, storm drain improvements, and the treatment of contaminated soils. The project requires the contractor to provide all labor, equipment, and materials, adhering to the 2024 Municipality of Anchorage Standard Specifications and various state and national traffic and electrical codes. Key deliverables include the installation of inlaid traffic markings, flexible delineators, and the coordination of access for adjacent businesses and school bus routes. The bidding process requires the submission of sealed paper bids to the MOA Purchasing Department by 2 PM local time on November 5, 2026, as electronic submissions are not accepted. Bidders must provide a bid bond, valid state and municipal contractor licenses, and a SAM report. The contract will be awarded to the responsible bidder who submits the lowest responsive bid, with preferences available for local and veteran bidders. Awardees must comply with a Community Workforce Agreement and prevailing wage requirements. Environmental compliance is critical, as work in Campbell Creek requires a Fish Habitat Permit and is subject to inspection by the U.S. Army Corps of Engineers, while soil testing must follow specific EPA and ADEC protocols for lead contamination.
Municipality of Anchorage

POSTED

about 13 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
Parking Lot E8 Repairs
Solicitation # CSULBSOQ80
The Parking Lot E8 Repairs project (Project Number PE825PK023) at California State University, Long Beach, involves the complete removal of existing four-inch asphalt pavement and the upper 18 inches of soil, including cement-treated soil. The scope of work requires the installation of new asphalt over non-expansive fill compacted to at least 95 percent relative compaction, as well as the installation of one new EV charging station and the conversion of nine EV-ready stalls to full charging capability. The owner's construction estimate for this public works project is 3,700,000 dollars, with anticipated construction occurring between April 1 and July 30, 2027. Bidders must hold a valid California contractor's license in either the C-12 or B classification and must be prequalified through the PlanetBids portal. A mandatory site walk was scheduled for November 16, 2026, and sealed bid proposals are due by 2:00 p.m. on December 16, 2026. The project is subject to prevailing wage rate laws, requiring all contractors and subcontractors to be registered with the Department of Industrial Relations. Additionally, the project will be enrolled in the CSU Builders Risk Insurance Program and potentially the Owner-Controlled Insurance Program. Award will be based on the lowest responsive and responsible bid, with specific incentives provided for Disabled Veteran Business Enterprise (DVBE) participation. While a minimum of 3 percent DVBE participation is required, incentives ranging from 1 to 3 percent are available for participation levels between 4 percent and 6 percent or more, subject to a 50,000 dollar cap when combined with Small Business Preferences and a total cumulative adjustment limit of 100,000 dollars.
Purchasing Office Department of California State University, Long Beach

POSTED

about 15 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

This is a combined synopsis and solicitation for commercial construction under FAR Part 12, issued as a Request for Quotation (RFQ) for the Red Canyon Corridor Paving project on the Ashley National Forest in Daggett County, Utah. The work involves repaving Forest Road (FR) 095 Red Canyon with full-depth reclamation, a 3-inch asphalt pavement layer, and a 6-inch aggregate base replacement, along with associated tasks such as box culvert installation, line striping, sign and dumpster pad installation, demolition and reconstruction of campground spurs, and temporary traffic control. An optional item includes reconstruction work at Greens Lake Campground. The acquisition is a total small business set-aside under NAICS code 237310 with a size standard of $45 million, and all responsible small business concerns may submit quotes. The contract requires full compliance with federal construction standards including FP24 specifications, CSI specifications for water distribution and earthwork, and detailed plans and drawings. The project must be performed within a mandatory 120-calendar-day period beginning no later than 10 days after notice to proceed, with performance scheduled from August 17 to December 14, 2026. Quotations must include detailed technical and project management approaches, demonstrated experience and past performance, and complete pricing for all base and optional items listed in the Schedule of Items. Proposals must be submitted electronically via email to the Contract Specialist by the deadline of July 31, 2026, and must include a fully completed SF-1442 form, proof of SAM registration with a valid UEI number, and adherence to all amendments, including updated site visit information and Q&As. Technical proposals are subject to a pass/fail gate—failure to address any required technical factor results in disqualification. Evaluation is based on a comparative assessment of technical approach, experience, past performance, and overall price, with award made to the offeror providing best value without formal tradeoff procedures. Contractors must furnish performance and payment bonds under FAR 52.228-15, meet required insurance levels including $500,000 general liability and $100,000 employer’s liability, and comply with prevailing wage requirements under Executive Order 14026 and the Davis-Bacon Act. Invoicing must be submitted electronically via the Treasury’s Invoice Processing Platform, and contractors must allow full government access to records, sites,

General Info

Small business set-aside for Red Canyon Corridor paving in Utah, due July 24, 2026, via SAM.gov.

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Vernal, UT, USA

Set-Aside

SBA

Documents

9

Amendment 01 to Solicitation 1240LT26Q0082 Red Canyon Corridor Paving

PDF, High priority: read this firstamendment
High

Amendment 02 to Solicitation 1240LT26Q0082 Red Canyon Corridor Paving

PDF, High priority: read this firstamendment
High

Davis-Bacon Wage Determination Utah Highway Construction 2026

PDF, High priority: read this firstwage-determination
High

FP-24 Forest Service Supplemental Specifications

PDF, High priority: read this firstspecifications
High

Red Canyon Corridor Paving Drawings - Ashley National Forest

PDF, High priority: read this firstdrawings
High

Schedule of Items Red Canyon Corridor Paving Flaming Gorge Ranger District

XLS, High priority: read this firstschedule-of-items
High

Solicitation 1240LT26Q0082 Red Canyon Corridor Paving IFB

PDF, High priority: read this firstifb
High

USDA Forest Service R-4 Red Canyon Paving Earthwork Specifications

PDF, High priority: read this firstspecifications
High

USDA Forest Service Section 221100 Water Distribution Systems Spec

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline changed from Jul 24, 2026 to Jul 31, 2026. The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Intermountain 8 Usda-Fs
Contacts2 people available
OfficeOgden, UT, 844012310, USA
Office AddressOgden, UT, 844012310, USA

Full Description

Show more

This is a combined synopsis/solicitation for commercial construction prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued. 


Solicitation number 1240LT26Q0082 is issued as a Request for Quotation (RFQ) for the Red Canyon Corridor Paving on the Ashley National Forest, Daggett County, Utah. The project will focus on re-paving key roads along the Red Canyon Corridor.  The work includes Base Item work on Forest Road (FR) 095 Red Canyon plus Optional Items for the Greens Lake Campground Reconstruction.


This acquisition is set-aside for small business concerns. The applicable North American Industry Classification System Code is 237310. The small business size standard is $45 Million. This acquisition is a total Small Business set-aside.   All responsible sources may submit a quotation which will be considered by the agency. 


Amendment 01 - Posted 07/20/26: Summary - Extended the due date for quotes, has site visit information and questions/answers.


Amendment 02 - Posted 7/23/26: Summary - Additional Questions/Answers.

More opportunities from Department Of Agriculture → Csa Intermountain 8 Usda-Fs

Same awarding agency

NAICS: 327390
New
Federal
Picnic Tables & Bear Lockers with Install
Solicitation # 1240LT27Q0017
Solicitation 1240LT27Q0017 is a combined synopsis and request for quotation issued by the USDA Forest Service for the Winiger Ridge Dispersed Campsite Renovations. The project requires the purchase and installation of new picnic tables and bear boxes at existing dispersed campsites 1 through 5, located along NFSR 359.1 and 359.1A within the Boulder Ranger District of the Arapaho and Roosevelt National Forest and Pawnee National Grassland. This is a total small business set-aside under NAICS code 327390, with an estimated project magnitude between 25,000 and 100,000 dollars. The contract will be awarded as a firm fixed price to the offeror representing the best value, based on an evaluation of the technical approach and fair and reasonable pricing. The period of performance is scheduled from June 15, 2027, to August 16, 2027, with work commencing within 10 calendar days of the notice to proceed. Technical specifications for the picnic tables include concrete bases with a minimum compressive strength of 5,000 psi, #4 steel reinforcement, and a design capable of withstanding a 500 lbs/ft2 snow load. The contract is subject to the Davis-Bacon Act and Buy American requirements. Quotations must be submitted by November 24, 2026, and must include a technical approach, pricing via the provided Schedule of Items Excel spreadsheet, and a bid guarantee. Inspection and acceptance will be conducted in accordance with FAR 52.246-12.
Other Concrete Product Manufacturing

POSTED

2 days ago

DEADLINE

in 26 days
View Details
NAICS: 237120
New
Federal
Nelson Drive Fuel Tank Removal
Solicitation # 1240LT27Q0012
Solicitation 1240LT27Q0012 is a firm fixed price contract issued by the USDA Forest Service for the removal of two 300-gallon steel underground fuel storage tanks at the Nelson Drive housing complex on the Bridger-Teton National Forest in Wyoming. The scope of work includes the extraction and disposal of the tanks, the cleanup and disposal of contaminated soils, and potential surface restoration. The contractor is required to field verify all existing conditions before ordering products and must adhere to OSHA standards for excavation and shoring, as well as IDEQ and government regulations for waste hauling and disposal. The estimated period of performance is from June 1, 2027, to June 30, 2027. This project is a total small business set-aside under NAICS code 237120. Award will be made based on the lowest price technically acceptable (LPTA) criteria, evaluating technical capability through an experience questionnaire, a project-specific quality control plan, and a review of past performance. Required submissions include a technical narrative detailing the approach to tank removal and soil remediation, as well as the qualifications of key personnel. The contract mandates performance and payment bonds and compliance with the Davis-Bacon Act for wage requirements. Quotes were due by November 13, 2026, with a requirement to hold pricing firm for 90 calendar days.
Oil and Gas Pipeline and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 15 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS