Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on April 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

GAOA SOUTH ZONE FENCE REPLACEMENT

Closed
1240LT26Q0016Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
SLED
Shell Point Tennis/Pickleball Court Resurfacing
Solicitation # 102026
Beaufort County Procurement Services has issued Invitation for Bid IFB 102026 for the inspection, repair, and resurfacing of the tennis and pickleball courts at Shell Point Park in Beaufort, South Carolina. The project is necessitated by safety concerns and structural damage caused by root intrusion. The scope of work includes site preparation, demolition, and the application of a multi-layer sports surfacing system with a specific color scheme of blue in-bounds, light blue non-volley, and green out-of-bounds areas. Additionally, the contractor must install new pickleball net posts, center anchors, and nets for two courts, ensuring all work meets USAPA standard specifications for texture, slip resistance, and dimensional requirements. Bids must be submitted electronically by 2:00 pm on October 20, 2026. The award will be based on a formal sealed bid process, typically favoring the lowest responsive and responsible bidder. Requirements for submission include a bid bond for at least five percent of the total bid, and the awarded contractor must provide performance and payment bonds equal to one hundred percent of the contract amount. The project must be completed within 180 calendar days from the Notice to Proceed. Contractors are required to comply with Title VI of the Civil Rights Act and must provide a Proposed Utilization Plan for Small and Minority Business Enterprise participation unless they are self-performing one hundred percent of the work. Payment is structured monthly at ninety percent of the cost of work in place, subject to approval by the County Representative.
Capital Projects/Facilities

POSTED

about 19 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This solicitation, numbered 1240LT26Q0016, is a total small business set-aside under FAR Part 12 for the removal and replacement of barbed wire and wooden post-and-rail fences across multiple sites within the Manti-La Sal National Forest, primarily in Utah. The work involves site preparation, installation of pressure-treated wood posts and steel T-posts with specific preservative requirements, fencing assembly, gate reuse or installation, placement of MUTCD-compliant object markers, and thorough site cleanup. The contract is evaluated under a Lowest Price, Technically Acceptable (LPTA) methodology, where all offerors must meet a baseline of technical acceptability—demonstrated through experience in remote, no-utility environments, handling waste disposal, working without heavy machinery, maintaining public access, and managing difficult terrain—before price becomes the sole determinant for award. The performance period spans 344 calendar days beginning May 18, 2026, and ending April 26, 2027, with work distributed across locations such as Oowah Lake, Devils Canyon, and Nizhoni barbed, though the Great Wall of Buckeye site has been removed due to funding constraints. The solicitation mandates strict adherence to material standards, including copper naphthenate-treated wood with 6–8% copper retention per AWPA standards, ASTM and AASHTO specifications for wire and posts, and MUTCD compliance for signage. All bids must include a bid guarantee, incorporate bond premiums in the mobilization line item, and provide completed certifications including UEI, Buy American compliance, and adherence to Executive Order 14398, which prohibits discriminatory diversity, equity, and inclusion practices and requires certification that subcontractors also comply. Amendments have clarified discrepancies between documents, updated the statement of work, confirmed the precedence of the SOW over drawings, excluded non-applicable sites like Stuart, and mandated the inclusion of FAR Clause 52.222-90. Responses must be submitted via email to tony.taylor@usda.gov, with all required attachments including the experience questionnaire, KMZ geospatial file, Davis-Bacon wage determinations, and completed checklist, by the established deadline of May 1, 2026, at 12:00 PM MT. The Contracting Officer’s Representative is Jared McCourt, with Tony Taylor serving as both the Procuring Contracting Officer and point of contact

General Info

Small business set-aside for fence removal and replacement in Manti-La Sal National Forest under LPTA, 344-day performance period.

Agency

Department Of Agriculture → Csa Intermountain 8 Usda-FsView Agency

Contract Value

$747,448.37

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

Moab, UT, USA

Set-Aside

SBA

Awardee

NOLAND TOUGH FENCE, LLCView Profile

Award Issued Date

Documents

(25)

RFQ 1240LT26Q0016 GAOA South Zone Fence Replacement

PDFrfq

8.+Wood+Rail+Diagram.pdf

PDF

Oowah Lake CG Fence and Related Fence Drawings - Moab/Monticello Ranger District

PDFdrawings

Amendment 0004 to Solicitation 1240LT26Q0016 for GAOA South Zone Fence Replacement

PDFamendment

GAOA South Zone Fence Replacement Schedule of Items 1-20-2026

PDF1 pagesow

7.+Fence+Diagram.pdf

PDF

GAOA South Zone Fence Replacement Statement of Work

PDFsow

GAOA South Zone Fence Replacement Schedule of Items Update 02

PDFschedule-of-items

Amendment 0006 to Solicitation 1240LT26Q0016

PDFamendment

Davis-Bacon Act Wage Determination UT20260017 for Grand County, Utah

PDFwage-determination

USDA Forest Service Experience Questionnaire

DOCXexperience-questionnaire

Davis-Bacon Act Wage Determination UT20260022 San Juan County

PDFwage-determination

Davis-Bacon Act Wage Determination CO20260003 Montrose CO

PDFwage-determination

Amendment 0004 to Solicitation 1240LT26Q0016 for GAOA South Zone Fence Replacement

PDFamendment

USDA Forest Service R-4 GAOA South Zone Fence Replacement Specifications

PDFspecifications

Amendment 0005 to Solicitation 1240LT26Q0016 for GAOA South Zone Fence Replacement

PDFamendment

15.+BarNone+Fence+Bracing+Example.png

PNG

Davis-Bacon Act Wage Determination UT20260027 Sanpete County

PDFwage-determination

Amendment 0002 to Solicitation 1240LT26Q0016 for GAOA South Zone Fence Replacement

PDFamendment

Site Pictures Document

PDFother

FAR 52.222-90 Addressing DEI Discrimination Clause

PDFclause

Davis-Bacon Act Wage Determination UT20260017 Emery County

PDFwage-determination

GAOA South Zone Fence Replacement Schedule of Items 3-16-26

PDFschedule-of-items

Amendment 0003 to Solicitation 1240LT26Q0016 for GAOA South Zone Fence Replacement

PDFamendment

Amendment 0001 to Solicitation 1240LT26Q0016 for GAOA South Zone Fence Replacement

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

7 updates
PhaseClosed
Posted

Combined Synopsis

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Amendment 5

Contract was updated

Amendment 6

Contract was updated

Amendment 7

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Intermountain 8 Usda-Fs
Contacts1 person available
OfficeOgden, UT, 844012310, USA
Organization / Agency
Department Of Agriculture → Csa Intermountain 8 Usda-Fs
View Agency Profile
Office AddressOgden, UT, 844012310, USA
Contacts
Tony Taylor - Contract Specialist

Full Description

Show more

Amendment 0006 - This amendment makes the following change:


- Due to Presidential Executive Order 14398, FAR Clause 52.222-90 is mandatorily added to all open solicitations to be incorporated into any resulting awards. FAR 52.222-90 is hereby included in the Terms and Conditions. This clause is included as an attachment to the solicitation.



No, other changes are made. The response date remains the same.


PLEASE ENSURE ALL AMENDMENTS ARE ACKNOWLEDGED WHEN SUBMITTING A QUOTE.


------------------------------------------------------------------------------------------------------------


Amendment 0005 - This amendment makes the following changes:

- Descope - Due to funding limitations, the Great Wall of Buckeye site is removed from the base items on the SOI. Any reference to this site throughout any attachments is hereby deemed not a part of any resulting contract.

- SOW paragraph 1.7 START DATE is changed to May 18, 2026.

- SOW paragraph 1.8 CONTRACT TIME is changed to 344 Calendar Days; the POP end date remains 4/26/2027.

- The response date is changed to May 1, 2026. The time remains 12:00 PM MT.

No, other changes are made.


See the two newly attached documents:


1.5 1240LT26Q0016 - Amendment 0005


3.2 SOI_GAOA South Zone Fence Replacement Update 02


------------------------------------------------------------------------------------------------------------


Amendment 0004 - This amendment makes the following clarifications: Updated to add CO signature.


- There are some discrepancies that have been identified within the solicitation. The 
attached questions and answers address those discrepancies with instruction as to what
information takes precedence. These answers will be made a part of any resulting contract.
The supporting documents will be adjusted as identified within this amendment.
- The response date is changed to April 3, 2026. The time remains 12:00 PM MT.


See the newly attached amendment "1.4 1240LT26Q0016 - Amendment 0004".


------------------------------------------------------------------------------------------------------------


Please note that the date offers are due is being extended to 4/3/2026.  It is anticipated that an additional amendment may be necessary.  This solicitaiton is currently being reviewed and will be updated once that decision is made.


------------------------------------------------------------------------------------------------------------


Amendment 0003 - This amendment makes the following clarifications:

- There is a discrepancy between the SOW Section 3.3 and Attachment 8. Wood Rail Diagram concerning the size of bolts to be used. The SOW supersedes the attachment in this case and 3/8" bolts should be used for construction.

- The SOW Section 7.7 specifies gate requirements. The number of gates is given in previously answered and posted questions. No gates require replacement with new hardware. Any gate that is found in place of a section of fence to be rebuilt, should be reused on the newly erected fence. This is incidental to the fencing line items.

- The KMZ file notes a site named "Stuart". This site is not included in the solicitation.

- The response date remains unchanged as March 26, 2026. The time remains 12:00 PM MT.

No, other changes are made.


------------------------------------------------------------------------------------------------------------


Amendment 0002 - Schedule of Items updated. No new work added, but attachment


3. SOI_GAOA South Zone Fence Replacement is updated to


3.1 SOI_GAOA South Zone Fence Replacement Update 01. The following changes have


been made:
- Mobilization line item added. Bond premiums should be added to this line item.
- Sites that have both post and rail fencing and barbed wire fencing have been split into
separate line items.
- The response date is being extended to March 26, 2026. The time remains 12:00 PM MT.


------------------------------------------------------------------------------------------------------------


Amendment 0001 - Questions and answers complimenting the original solicitation are added as attachment (1.1 1240LT26Q0016 - Amendment 0001).  These answers will be incorporated into any resulting award.


The due date and time for quotes remains unchanged.


------------------------------------------------------------------------------------------------------------


Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued.



Solicitation number 1240LT26Q0016 is issued as a Request for Quotation (RFQ) for This project is comprised of removing and replacing multiple barbed wire and wooden post and rail fences at campgrounds and lakes on the Manti La Sal Nation Forest.


This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.


The applicable North American Industry Classification Standard Code is 238990. The small business size standard is 5660 FENCING, FENCES, GATES AND COMPONENTS. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.



Please review the attachments for more information.  A quote checklist has been added to help ensure you have provided all information necessary to be considered responsive.

More opportunities from Department Of Agriculture → Csa Intermountain 8 Usda-Fs

Same awarding agency

NAICS: 237310
New
Federal
Selkirk to Surf Road Maintenance
Solicitation # 1240LT26Q0115
Solicitation 1240LT26Q0115 is a combined synopsis and request for quotation issued by the USDA Forest Service for the Selkirks to Surf road maintenance project. Located within the Methow Valley Ranger District of the Okanogan-Wenatchee National Forest in Okanogan County, Washington, the project focuses on deferred transportation maintenance along FSR 5400 Harts Pass Road and FSR 5400600 Slate Peak Road. This is a total small business set-aside under NAICS code 237310. The scope of work includes a base package for roadway clearing, ditch and culvert reconditioning, aggregate surface placement, and riprap armor installation, as well as five optional items for additional aggregate placement and landslide or flood damage repairs. The contract is a firm fixed price award with a period of performance from September 14, 2026, to October 13, 2027. Award will be based on the lowest price technically acceptable criteria, requiring a technical approach, construction schedule, and a record of three similar projects completed within the last three years. Compliance with the Davis-Bacon Act and specific Forest Service fire and camping regulations is required. Proposals must be submitted as four separate PDF documents to the designated contract specialist by September 14, 2026, at 1:00 PM Pacific Time. Payment will be based on actual work performed, with progress payments available monthly.
Highway, Street, and Bridge Construction

POSTED

about 21 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237110
New
Federal
GAOA Palisades Lagoon Liner & Sprinkler System Replacement, Coronado National Forest
Solicitation # 1240LT26Q0094
Solicitation 1240LT26Q0094 is a total Small Business set-aside for the Palisades Lagoon Liner and Effluent Sprinkler System Replacement project at the Coronado National Forest in Pima County, Arizona. The project involves the maintenance and upgrade of the wastewater treatment system at the Palisades Administrative Complex, specifically requiring the replacement of the existing lagoon liner with a double geomembrane system, the installation of a new effluent sprinkler system, and the reconstruction of approximately 660 linear feet of access road. To ensure uninterrupted wastewater services during construction, the contractor must provide a temporary above-ground wastewater conveyance system and manage the disposal of existing liners and effluent sludge. The estimated contract value ranges between 500,000 and 1,000,000 dollars, with a performance period from October 1, 2026, to December 1, 2026. The acquisition is governed by FAR Part 12 and NAICS code 237110. Award will be based on best value, evaluating technical approach, project management, performance schedules, specialized experience, and past performance. A bid guarantee of 20 percent is required for quotes exceeding 150,000 dollars. Contractors must comply with the Davis-Bacon Act for wage determinations and provide a written quality control plan for approval by the Contracting Officer's Representative before work begins. Final acceptance is contingent upon the system being tested under operating conditions. All invoicing must be processed electronically via the Department of Treasury's Invoice Processing Platform.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS