Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on February 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Garden Avenue Parking Garage Restoration

Closed
25-0013-ENState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238190
New
SLED
Building Envelope Repairs/Exterior Insulation Finish System (EIFS)
Solicitation # PE-55612-NONST-2027-000000041
The Bulloch Board of Education is soliciting bids for building envelope repairs and replacement at four schools in Statesboro, Georgia: Southeast Bulloch High School, Julia P. Bryant Elementary School, Sallie Zetterower Elementary School, and Nevils Elementary School. The scope of work involves selective repairs of the Exterior Insulation Finish System (EIFS) where base or finish coats have deteriorated, the installation of a fluid-applied waterproofing system over prepared EIFS or stucco surfaces, and repairs to associated sheet metal components and sealants. The project requires pressure washing and surface preparation, with all materials installed according to manufacturer instructions. The performance period allows 135 calendar days for substantial completion and up to 30 days for final punch list items. Bidders must be properly licensed in Georgia and provide at least three references for similar projects. Submissions must include a bid security equal to 5 percent of the bid amount, and the successful contractor will be required to provide performance and payment bonds along with a certificate of liability insurance including workers' compensation. Evaluation factors for award include licensure status, quality of previous work, financial management, and personnel qualifications. Payment is processed via an application for payment reviewed by the architect, with options for paper check or EPay. There is no specified set-aside status for this solicitation.
Bulloch Board of Education

POSTED

1 day ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves the rehabilitation of the Clearwater Garden Avenue Parking Garage at 28 North Garden Avenue in Clearwater, Florida. The scope includes comprehensive concrete repairs to various structural elements such as floors, ceilings, columns, walls, and precast tee beams. Additionally, floor slab cracks and joints will be sealed, and the roof-level traffic-bearing membrane will be recoated to ensure durability and protection. Miscellaneous repairs throughout the garage will encompass door hardware replacement, installation of bearing support brackets, and various painting tasks to restore both functionality and appearance. Contractors bidding for this project must provide valid state and, if applicable, Pinellas County licenses or registrations as part of their proposals. They are also required to supply fixed or portable project signs according to contract specifications, with the final quantity determined based on the approved work schedule. Any additional signage needed due to schedule changes must be provided at no extra cost to the city. The project has a contract duration of 120 consecutive calendar days, with the solicitation being issued by the Public Works agency of Clearwater, Florida. Key contacts for procurement include a Contract and Procurement Specialist and a Procurement Analyst, with a bid response deadline set for March 11, 2026.

General Info

Rehabilitation of Clearwater Garden Avenue Parking Garage with concrete repairs, sealing, recoating, and miscellaneous maintenance.

Documents

2
PDF, High priority: read this first10 pages · rfb
High
PDF, High priority: read this first80 pages · itb
High

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Siding and Sheet Metal InstallationOpen now, due in 20 days
  • Glass, Glazing, and Ornamental IronOpen now, due in 64 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Public Works
Contacts2 people available
OfficeClearwater, FL, 33756, USA

Interested Companies (23)

Above All Caulking & WaterproofingClearwater, FL
Angelus Waterproofing & RestorationHuntington Beach, CA
B & S Crane ServiceORLANDO, FL

See All 23 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
This project consists of rehabilitation of the Clearwater Garden Avenue Parking Garage (located at 28 North Garden Avenue), including concrete repairs to floors, ceilings, column, walls and precast tee beams. Floor slab cracks and joints will be sealed and the existing roof level traffic bearing membrane will be recoated. Miscellaneous repairs will be completed throughout the garage, including door hardware replacement, installation of bearing support brackets and miscellaneous painting. The Contractor shall provide copies of current Contractor License/Registration with the state of Florida and Pinellas County (if applicable) in the bid response. The Contractor shall provide Fixed or Portable project signs as described in Section III, Section 23 of the Contract Documents. The final number of project signs will be determined at the beginning of the project based on the Contractor's schedule of work submitted for approval. Additional project signs may be required at no additional cost to the city due to the Contractor's schedule of work. Contract Period: 120 Consecutive Calendar Days

More opportunities from Florida → Public Works

Same awarding agency

NAICS: 237110
New
SLED
Lift Station No. 145 and 146 Improvements
Solicitation # IFB27-0059
The City of Orlando is soliciting sealed electronic responses for the construction and rehabilitation of Lift Station No. 145 and No. 146 Improvements located in the Country Club Villas Subdivision. The project requires the contractor to provide all labor, materials, and equipment necessary to deliver a complete and operational lift station system. Key deliverables include the operational systems, comprehensive instructional manuals in both hard copy and electronic formats, and the provision of training for the owner's personnel on the operation and maintenance of the installed equipment. The contract will be awarded to the low bidder based on the Base Bid price. Bidders must submit their responses electronically via the OpenGov portal by January 7, 2027, at 7:00 pm. Required submission documents include a bid form, affidavits of non-collusion and compliance with responsible contractor policies, a list of valid contractor licenses, and a five-year history of similar projects and claims. Contractors must adhere to strict material packaging and labeling standards, including specific requirements for painting materials, reinforcing steel, and electrical identification. Performance and payment bonds, as well as a 10% bid bond security, are required. The project is subject to the Davis-Bacon Act, requiring the payment of regional hourly wages and the submission of certified payrolls. All work must comply with City, County, State, and Federal codes, including ADA specifications for lighting fixtures and the Trench Safety Act.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
SLED
INVITATION TO BID: Highland Village Stormwater Improvements Project (Phase 1)
Solicitation # ITB-2026-050
The City of North Miami Beach is soliciting sealed bids for the Highland Village Stormwater Improvements Project (Phase 1), identified as ITB-2026-050. The project scope involves furnishing all labor, materials, and equipment to install backflow prevention devices upstream of existing outfalls near NE 25th Avenue. Key work includes excavation, demolition, installation of drainage structures, connection to the HDPE storm sewer system, relocation of water services and mains, and the restoration of sod, sidewalks, and pavement. The project is subject to the Build America, Buy America (BABA) Act and Davis-Bacon wage determinations, and requires compliance with state NPDES requirements for stormwater erosion and sedimentation control. The contract will be awarded to the lowest priced responsive and responsible bidder. To qualify, bidders must hold a valid State of Florida license and have completed at least three similar projects in Florida within the last two years, with at least two located in Miami-Dade or Broward County. Required submissions include a bid security of 5% of the bid amount, a valid local business tax receipt, and proof of OSHA 10-hour Construction Safety certification. Prime contractors must allocate at least 15% of the total contract value to certified SBE, MBE, or WBE subcontractors. Bids must be submitted electronically via the City's eProcurement portal by December 3, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

4 days ago

DEADLINE

in 9 days
View Details
NAICS: 237110
New
SLED
Lift Station No. 85 Replacement
Solicitation # IFB27-0027
The City of Orlando is soliciting bids for the replacement of Lift Station No. 85, located at 3915 South Lake Orlando Parkway in Orlando, Florida. The project scope includes the construction of a new submersible pump type lift station, a new electrical building, and the installation of gravity sanitary sewers, water services, and a stormwater and stone bed conveyance drain system. The estimated project value is $21,204,000, and the contract will be awarded to the lowest responsive and responsible bidder based on the total base bid. The period of performance requires substantial completion within 730 days of the start date, with a mobilization requirement of 10 calendar days following the Notice to Proceed. Responses must be submitted electronically via the OpenGov portal by December 4, 2026. Required submittals include a price proposal, bid bonds with 10% security, and affidavits of non-collusion and compliance with the City's Responsible Contractor's Policy. The contractor must adhere to Davis-Bacon Act prevailing wage rates for heavy construction in Orange County and comply with NPDES stormwater regulations and ADA accessibility codes. There is no set-aside status for this solicitation. Payment is managed through signed applications for payment and the submission of certified payrolls via the City's electronic tracking system.
Water and Sewer Line and Related Structures Construction

POSTED

5 days ago

DEADLINE

in about 2 months
View Details
NAICS: 237310
New
SLED
Lower Spring Branch Stormwater Improvements
Solicitation # 14-0048-EN
The Lower Spring Branch Stormwater Improvements project, solicitation 14-0048-EN, is a construction effort by the City of Clearwater, Florida, aimed at flood reduction. The scope of work includes the replacement of bridges on Springtime Avenue and Overbrook Avenue, as well as the installation of a double concrete box culvert on Douglas Avenue. The project is estimated at 5 million dollars and must be completed within 548 consecutive calendar days. The contractor is required to provide fixed project signs and must submit current licenses or registrations with the state of Florida and Pinellas County. Technical standards follow the Florida Department of Transportation Standard Specifications for Road and Bridge Construction, with specific requirements for TEAM insert valves and cable manufacturing dates. The contract will be awarded to the lowest responsible and responsive bidder. Bidders must provide bid security equal to 10 percent of their maximum bid price and ensure their engineer possesses Advance Temporary Traffic Control Certification. The project involves coordination with Frontier Communications for utility work and adheres to USACE Nationwide Permit 14. Acceptance of work, including pavement density and VVDS testing, is managed by the Engineer, with specific requirements for core sampling and written authorization before final paving. There is no set-aside status specified for this solicitation.
Highway, Street, and Bridge Construction

POSTED

5 days ago

DEADLINE

in 15 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS