Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

GDOT 1019a Structures Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract requires the installation of eleven stormwater structures compliant with GDOT Standard Specification 1019a, specifically precast concrete catch basins or inlets, to be completed at a location governed by the Georgia Department of Transportation standards. The work is being procured as a subcontract under the City of Monroe, with the North American Industry Classification System code 237110 indicating it falls under Highway, Street, and Bridge Construction. The solicitation was posted on July 14, 2026, and responses must be submitted by 4:00 PM on August 14, 2026. All installations must meet the prescribed engineering and material standards outlined in GDOT 1019a to ensure proper functionality and longevity of the stormwater infrastructure. The project’s place of performance and specific site details are not provided, but compliance with GDOT specifications is mandatory, and the contractor is expected to manage logistics, permitting, and field execution without additional agency oversight beyond adherence to the standard.

General Info

Install eleven GDOT 1019a-compliant stormwater structures for City of Monroe by August 14, 2026.

Agency

Georgia → City of MonroeView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → City of Monroe
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → City of Monroe
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install 11 stormwater structures per GDOT Standard Specification 1019a (precast concrete catch basins or inlets).

Similar Contracts

NAICS: 237110
New
SLED
1947 Watermain - North Bound Airport Expressway PreservationThe Port of Seattle’s Aviation Project Management Group is preparing to restore the integrity of a 1947 water main located along the northbound Airport Expressway using cured-in-place pipe (CIPP) technology under a Design-Bid-Build procurement model. This infrastructure initiative aims to extend the service life of the aging waterline without excavation by inserting and curing a resin-saturated liner within the existing pipe, ensuring minimal disruption to surrounding traffic and utilities. The project is classified under NAICS code 237110, indicating it falls under Water and Sewer Line and Related Structures Construction, and is expected to involve detailed engineering assessments, material specifications compliant with industry standards, and adherence to municipal and environmental regulations during execution. The solicitation is forecasted for release in July 2026, with Moraa Omwega listed as the primary point of contact and Ray Moreno serving as the Project Manager, both available through the Port of Seattle’s official channels for inquiries. Although the exact location details are not specified in the data provided, the place of performance is clearly tied to the northbound corridor of the Airport Expressway. Contractors interested in bidding will need to await formal solicitation documents to understand scope, timelines, bonding requirements, and compliance protocols, with all work expected to meet the Port’s stringent standards for safety, environmental stewardship, and long-term infrastructure resilience.
Aviation Project Management Group

POSTED

about 1 hour ago

DEADLINE

N/A
View Details
NAICS: 237110
New
SLED
2025 CDBG: Sanitary Sewer System & Storm Drain ImprovementsThe contract involves the construction and rehabilitation of sanitary sewer and storm drain infrastructure within Georgia, including approximately 2,585 linear feet of 8-inch DR 17 HDPE pipe installed via bursting, rehabilitation of about 11 existing manholes, and installation of 34 new sanitary sewer services connecting to existing structures. Parallel work includes laying about 5,386 linear feet of rollover curb and gutter aligned with existing roadway grades, installing 2,188 linear feet of 18-inch reinforced concrete pipe for storm drainage, and constructing 11 GDOT 1019a stormwater structures. The project requires comprehensive surface restoration including approximately 256 tons of OGI Superpave and 406 tons of 9.5mm Superpave asphalt, striping, erosion control measures, traffic control, bypass pumping, and full restoration of disturbed surfaces. All work must be completed with adherence to strict material and labor standards under the Build America, Buy America Act, ensuring that all iron, steel, manufactured products, and construction materials used are produced in the United States, unless subject to an applicable waiver. The project falls under the City of Monroe’s commitment to Fair Housing and is subject to Section 3 of the HUD Act of 1968, requiring that economic opportunities from the contract be directed toward low- and very low-income persons and businesses in the surrounding area. Section 3 compliance documentation must be provided prior to award. The City of Monroe affirms equal access to its services and employment regardless of race, color, national origin, religion, sex, familial status, disability, or age. The solicitation, numbered PE-74750-NONST-2026-000000025, was posted on July 14, 2026, with proposals due by August 14, 2026, and is administered under the Georgia Department of Administrative Services. All bids must meet federal procurement guidelines, and the point of contact for inquiries is JamieLynn R. Harris.
City of Monroe

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details