Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Michigan was posted on August 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

General Construction Management

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 04, 2026. A critical component of this contract is strict adherence to DBE Good Faith Effort (GFE) requirements to secure project financing. Bidders must demonstrate comprehensive outreach and recruitment, including posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must utilize the services of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to provide proof of these specific postings and agency utilizations within the bid package will result in the proposal being deemed non-responsive. Prime contractors are further required to flow these GFE obligations down to any subcontractors they award.
RT CONTRACTOR CORP

POSTED

about 4 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base in Groton, Connecticut. This comprehensive construction effort spans 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements feature specialized foundations with rigid inclusions and load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site work including rock excavation and wetland mitigation. The project requires a wide array of trades, including demolition, abatement, concrete, masonry, structural steel, roofing, electrical, plumbing, and mechanical services. Infrastructure improvements will encompass primary and secondary electrical distribution, telecommunications, access roads, and paved loading areas. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must submit their responses by October 31, 2026, and should contact Rahul Maheshwari for bid invitations and access to the full project documentation.
J & J Contractors, Inc

POSTED

about 4 hours ago

DEADLINE

in 9 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC has issued a price-based Request for Bid for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes structural modifications such as saw cutting reinforced concrete walls and installing headers, as well as exterior excavation and the construction of retaining walls. A critical requirement of the project is the creation of an ADA-accessible route featuring the necessary ramps, landings, and handrails to reach the existing grade or sidewalk. The contractor is also responsible for weatherproofing the installation and restoring all disturbed interior and exterior surfaces. Bids are due by November 20, 2026, with a projected contract award date of December 4, 2026, and a completion target of March 31, 2027. This is a firm fixed-price solicitation where the lowest responsive and qualified bidder will be selected, subject to budgetary limits and Indian preference requirements under Chapter 10-3 of the Colville Tribal Code. Preference-eligible bidders may be awarded the contract even if their bid is higher than the lowest responsive bid, provided it falls within specific allowable differentials based on the total project cost. Qualified bidders must demonstrate technical and financial capacity, provide a detailed project schedule, and submit a subcontracting plan. Mandatory insurance requirements include Commercial General Liability of at least 1 million dollars per occurrence, Business Automobile Liability of 1 million dollars per accident, and Worker's Compensation as required by Washington state law. Final project acceptance by Colville Fuels is contingent upon the exit being fully operational and receiving all necessary approvals from the Authority Having Jurisdiction.
Confederated Tribes of the Colville Reservation

POSTED

about 14 hours ago

DEADLINE

in 30 days

AI Contract Overview

Show more

This subcontract for General Construction Management, issued by the State of Michigan DTMB under NAICS code 236220, requires the full coordination of all labor, materials, equipment, permits, testing, and inspections. The selected contractor is responsible for ensuring total compliance with project standards to achieve Substantial Completion, which includes the submission of O&M manuals and the finalization of project closeout procedures. The solicitation was posted on August 10, 2026, with a response deadline of August 19, 2026. Interested parties can find further details and submission guidelines through the provided Sigma portal link.

General Info

Michigan DTMB subcontract for general construction management requiring full coordination and project compliance.

Place of Performance

MI, USA

Set-Aside

NONE

Documents

This scope was carved out of 751/24-256.DPL.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFQ-171-260000000421-2 | 751/24256.DPL; Mecosta County SGA - Winchester Dam Rehab

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMichigan → DTMB
ContactsNo contacts available
OfficeN/A
Organization / AgencyMichigan → DTMB
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Full coordination of labor, materials, equipment, permits, testing, inspections, and compliance to achieve Substantial Completion. Includes O&M manual submission and project closeout.

More opportunities from Michigan → DTMB

Same awarding agency

New
SLED
RFP-171-260000002683-4 | 472/26396.SAA; WHVCF - HVAC Repairs
Solicitation # RFP-171-260000002683-4
The State of Michigan Department of Technology, Management and Budget (DTMB) is soliciting proposals for professional services to perform Calhoun and Dickinson HVAC repairs at the Women’s Huron Valley Correctional Facility in Ypsilanti, Michigan. The scope of work is divided into five distinct phases: schematic design, preliminary design, final design, and construction administration for both office and field services. All work must adhere to industry-accepted standards, current mechanical, plumbing, utility, and electrical codes, and all applicable local, state, and federal regulations, including ADA and State of Michigan Barrier-Free Access Code requirements. The contract will be awarded based on a weighted evaluation by an Ad Hoc Advisory Committee, with the technical proposal accounting for 80% and the cost proposal accounting for 20%. Qualified firms must demonstrate experience in planning and executing similar projects and provide a technical proposal, a cost proposal based on billable hourly rates, and required certifications, including Michigan-based business and responsibility forms. Key personnel must include a Project Manager capable of responding to state inquiries within 24 hours, and all staff entering the facility must undergo a criminal history check via the Michigan Law Enforcement Information Network. Administrative requirements include mandatory registration in the SIGMA VSS portal for Electronic Funds Transfer payments and the submission of detailed monthly invoicing featuring certified on-site visitation logs. The professional firm is responsible for monitoring the construction contractor's performance and submitting monthly inspection records using form DTMB-0452. Proposals must be submitted electronically via SIGMA VSS by October 22, 2026, at 2:00 p.m. ET.

POSTED

3 days ago

DEADLINE

in about 8 hours
View Details
NAICS: 423860
New
SLED
RFQ-171-270000000015-2 | 472/23129.KMM; Woodland C.F. - Site Mechanical Underground
Solicitation # 270000000015
Solicitation 270000000015 is a request for proposals issued by the Michigan Department of Transportation through the DTMB for the procurement of replacement tolling equipment for the Blue Water Bridge. The scope of work requires the delivery of specific hardware, including FAAC International toll lane exit gates, Banner photo eyes, TRMI patron fare displays and axle counting treadles, TRMI serial lane interface cards, ELO touchscreen monitors, and Epson thermal printers. All equipment must be compatible with existing software and hardware systems at the bridge. Deliveries are to be made F.O.B. destination to Port Huron, Michigan, within 60 calendar days of the order. The contract will be awarded to the responsive and responsible bidder who passes all evaluation criteria and provides the lowest price. Mandatory submission requirements include a Confidential Treatment Form, a Vendor Questionnaire, acceptance of the Statement of Work and State Terms and Conditions, and a BABAA self-certification. Bidders must also adhere to strict environmental standards, including restrictions on PFAS and requirements for labeling mercury and brominated flame retardants. Qualified Service-Disabled Veteran-Owned Businesses may be eligible for a 10 percent pricing preference. The state maintains a 30-day review period for inspection and acceptance upon receipt of the goods.
Transportation Equipment and Supplies (except Motor Vehicle) Merchant Wholesalers

POSTED

3 days ago

DEADLINE

in 27 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS