Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from North Carolina was posted on July 2, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Generator System Automation and Rework Project in Orange County

Closed
367-OC 5417State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335311
New
SLED
DISTRIBUTION TRANSFORMERS
Solicitation # MS 11-26-02
Alameda Municipal Power (AMP) is soliciting firm quotations for a one-time purchase of sixty-five new distribution transformers, including various single-phase and three-phase pad-mounted units. The scope of work covers design verification, manufacture, factory testing, quality assurance, and delivery FOB to Alameda, California. Bidders must demonstrate the capacity to deliver the order within 12 to 24 months and provide written progress updates every three months. The procurement requires strict adherence to IEEE C57.12.34, 2016 DOE energy efficiency standards, and ANSI C57.12-26, with specific requirements for rust-inhibiting primers, stainless steel or anodized aluminum nameplates, and IEEE-compliant bar-coding. The contract will be awarded to the lowest responsive and responsible bidder based on a three-stage evaluation process. Qualification is determined by a weighted framework consisting of evaluated total cost (35%), technical compliance and product quality (20%), U.S. electrical utility references (15%), warranty and service support (15%), and manufacturing capacity (15%). All bids must be submitted electronically via the OpenGov Bid Portal; submissions via email or paper will be rejected. Payment terms are NET 30 following delivery and acceptance, and as a department of the City of Alameda, the agency is exempt from Federal Excise Tax.
Engineering and Operations

POSTED

about 18 hours ago

DEADLINE

in about 2 months
NAICS: 335311
New
Federal
61--WY KORTES POWERPLANT EXCITER SUPPLY
Solicitation # 140RR027Q0040
The Reclamation Contracting Activity is seeking sources for the design and supply of an excitation system and associated enclosures for the Kortes Powerplant in Carbon County, Wyoming. This firm-fixed-price effort requires the provision of equipment capable of synchronous machine terminal voltage regulation and high initial response, adhering to strict technical standards including IEEE 421.1, IEEE 421.3, IEEE C57.13, and IEEE C37.20.1. Key deliverables include manufacturer technical catalog data, nameplate lists, installation instructions, and factory testing reports, which must be submitted 30 days prior to shipment. The equipment must be of the highest quality, with the manufacturer responsible for replacing any defective materials at their own expense. Delivery is specified as FOB destination to the Kortes Powerplant, with an anticipated delivery timeline of 365 days after receipt of the purchase order. This current notice is a sources sought announcement with a response deadline of November 30, 2026, and an anticipated formal solicitation release date of January 1, 2026. Interested small business sources must submit a capabilities statement to Michael Hirsch, including their CAGE code, SAM.gov Unique Entity ID, socioeconomic category, and evidence of similar project experience from the last three to five years. All prospective contractors must maintain an active registration in the System for Award Management to be eligible for award. Additionally, the contractor must comply with Bureau of Reclamation directives regarding the safeguarding of Controlled Unclassified Information and adhere to safety standards such as IEEE 80-2000 for AC substation grounding.
Reclamation Contracting Activity

POSTED

1 day ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The Generator System Automation and Rework Project in Orange County involves upgrading and expanding critical power systems across multiple facilities. The project includes reworking the standby generator system at the Motor Pool to enable automated change-over functionality, enhancing reliability and operational efficiency. At the Admin Building, a new standby gas-fired generator will be installed, along with modifications to the existing power distribution system to accommodate the new equipment. Additionally, the Maintenance Facility will see the relocation of an existing gas generator into the building, with necessary system tie-ins and modifications to ensure seamless integration and continued power support. This project is solicited by the County of Orange, North Carolina, with a contract value estimated between $500,000 and $1,200,000. The solicitation was posted on July 2, 2024, with a response deadline of August 7, 2024. The work is categorized under NAICS code 335311, which pertains to power, distribution, and specialty transformer manufacturing. The project aims to improve the resilience and automation of the county’s critical power infrastructure across its facilities, ensuring continuous operation during outages and enhancing overall system reliability.

Documents

1
PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → County of Orange
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
This project consists of the following: Motor Pool - Rework standby generator system to automate the change-over. Admin Building - Add a standby gas-fired generator and rework the power distribution. Maintenance Facility - Relocate an existing gas generator to the existing maintenance facility, tie into system, and make modifications as needed.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS