This Solicitation opportunity from Texas was posted on October 30, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract titled "George Washington Carver - Facility Expansion 1A & 1B" involves providing comprehensive design services for the phased development of the Carver Museum Facility Expansion, specifically covering preliminary through construction documents for phases 1a and 1b. This project was approved by the City Council of Austin in June 2021 and is managed by the City of Austin, Texas, under the NAICS code 712110, which pertains to museums. The contract is set within a budget range of $500,000 to $2,000,000, reflecting its scope and significance.
The solicitation was posted on October 30, 2024, with a response deadline of December 3, 2024. The primary point of contact for this project is Brandalyn Falletta, who can be reached via email or phone for inquiries. The project aims to expand and enhance the museum facilities, ensuring the design aligns with city standards and community needs. Further details and updates can be accessed through the official solicitation link provided by the City of Austin.
HighAI Summary for City of Austin Professional Services Evaluation Criteria: This document outlines the evaluation criteria and scoring rubric for professional engineering, architectural, and planning services for the City of Austin. It details the point distribution (100 total points plus 15 for interviews), defines key roles (Project Manager, Principal, Professional), and specifies requirements for MBE/WBE compliance, team structure, and project approach. Version date is 10/23/2023.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of Austin RFQ Evaluation Criteria - Professional Services: This document outlines the evaluation criteria and scoring rubric for professional engineering, architectural, and planning services for the City of Austin. It defines key roles (Project Manager, Principal, Professional), establishes a 100-point scoring system across nine consideration items, and details submission requirements for team structure, project approach, and MBE/WBE compliance. Revision date is 10/23/2023.
PDF
PDF, High priority: read this firstrfq-attachment
HighAI Summary for CLMP379 Form 4 Consultant Availability - George Washington Carver Facility Expansion: A certification form for Solicitation CLMP379 (George Washington Carver - Facility Expansion 1A & 1B) requiring prime firms and subconsultants to commit that proposed staff are available and that key personnel are direct employees of the prime firm.
PDF
PDF, High priority: read this firstpast-performance
HighAI Summary for CLMP379 Form 5: Experience of Project Manager: A submission form (Form 5) for solicitation CLMP379, George Washington Carver - Facility Expansion 1A & 1B. It requires the Project Manager's professional registration details and a detailed history of up to three projects, including client references and project descriptions, to evaluate the manager's experience.
PDF
PDF, High priority: read this firstpast-performance
HighAI Summary for CLMP379 Form 5: Experience of Project Manager: A submission form (Form 5) for Solicitation CLMP379, George Washington Carver - Facility Expansion 1A & 1B. It requires the Project Manager's professional registration details and a detailed history of previous projects, including client references and project descriptions, to be used for evaluation.
PDF
PDF, High priority: read this firstpast-performance
HighAI Summary for CLMP379 Form 6: Experience of Project Professional: A submission form (Form 6) for solicitation CLMP379, George Washington Carver - Facility Expansion 1A & 1B. It requires project professionals to provide their registration details and detailed past performance history, including project descriptions, construction costs, and client references.
PDF
PDF, High priority: read this firstpast-performance
HighAI Summary for CLMP379 Form 6: Experience of Project Professional: A submission form (Form 6) for solicitation CLMP379, George Washington Carver - Facility Expansion 1A & 1B. It requires project professionals to document their registration details and provide detailed experience for multiple projects, including client contact information and descriptions of work performed.
PDF
PDF, High priority: read this firstpast-performance
HighAI Summary for CLMP379 - Form 7: Experience of Project Principal: A submission form (Form 7) for Solicitation CLMP379, George Washington Carver - Facility Expansion 1A & 1B. It requires the Project Principal to provide their years of experience and detailed past performance data for three specific projects, including client contact information and project descriptions.
PDF
PDF, High priority: read this firstpast-performance
HighAI Summary for CLMP379 - Form 8 Prime Firm's Comparable Project Experience: This document is Form 8, a template for the Prime Firm to provide comparable project experience for Solicitation CLMP379 (George Washington Carver - Facility Expansion 1A & 1B). It requires details on project name, location, completion date, client, construction cost, project description, and services provided.
PDF
PDF, High priority: read this firstmbe-wbe-compliance-plan
HighAI Summary for CLMP379 George Washington Carver - Facility Expansion 1A & 1B MBE/WBE Compliance Plan: Issued on 10/30/2024, this document provides the Minority-owned and Women-owned Business Enterprise (MBE/WBE) procurement program requirements and compliance plan instructions for the George Washington Carver Facility Expansion 1A & 1B project (Solicitation CLMP379). It outlines participation goals, subgoals, and mandatory submission instructions for the MBE/WBE Compliance Plan and Good Faith Efforts documentation to avoid being deemed non-responsive.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for CLMP379 George Washington Carver - Facility Expansion 1A & 1B - Prime Firm General Information Form: This document is a submission form for a Request for Qualifications (RFQ) regarding the George Washington Carver Facility Expansion 1A & 1B (Solicitation CLMP379). It collects prime firm general information, joint venture details, office personnel qualifications, insurance coverage, and certifications regarding non-collusion, conflict of interest, and anti-lobbying.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for CLMP379 George Washington Carver - Facility Expansion 1A & 1B Prime Firm's General Information: This document is a submission form for a Request for Qualifications (RFQ) regarding the George Washington Carver Facility Expansion 1A & 1B (Solicitation CLMP379). It collects prime firm general information, joint venture details, office personnel counts, insurance coverage, and certifications regarding non-collusion, conflict of interest, and anti-lobbying.
PDF
PDF, High priority: read this firstpast-performance
HighAI Summary for CLMP379 George Washington Carver Facility Expansion - Comparable Project Experience Form: Form 9 for solicitation CLMP379 regarding the George Washington Carver Facility Expansion 1A & 1B. This document is a template for bidders to provide evidence of comparable project experience, requiring details on project location, completion date, client, construction cost, and services provided for up to three projects.
PDF
PDF, High priority: read this firstpast-performance
HighAI Summary for CLMP379 George Washington Carver - Form 9 Comparable Project Experience: Form 9 for Solicitation CLMP379 (George Washington Carver - Facility Expansion 1A & 1B), requiring bidders to provide documentation of comparable project experience, including project names, completion dates, client information, construction costs, and descriptions of services provided.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Employer Wage Theft Certification Form: A certification form required by the City of Austin (Ordinance No. 20221201-031) for employers submitting offers for city contracts. The document requires the firm to certify under penalty of perjury that they have not been adjudicated for wage theft within the previous five years and agrees to comply with Austin City Code Chapter 4.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Employer Wage Theft Certification Form: A certification form required by the City of Austin (Ordinance No. 20221201-031) for employers submitting offers for city contracts. The form requires the firm to certify under penalty of perjury that they have not been adjudicated for wage theft within the last five years and agree to comply with Austin City Code Chapter 4.
PDF
PDF, High priority: read this firstpast-performance
HighAI Summary for Form 8: Prime Firm's Comparable Project Experience - CLMP379: A submission form for Solicitation CLMP379 (George Washington Carver - Facility Expansion 1A & 1B) requiring prime firms to document their comparable project experience, including project location, completion date, client, cost, and services provided.
PDF
PDF, High priority: read this firstmbe-wbe-compliance-plan
HighAI Summary for George Washington Carver - Facility Expansion 1A & 1B MBE/WBE Compliance Plan: Issued on 10/30/2024 for solicitation CLMP379, this document provides the instructions and forms for the Minority-owned and Women-owned Business Enterprise (MBE/WBE) Compliance Plan for the George Washington Carver Facility Expansion. It outlines participation goals, subgoals, and the requirements for documenting Good Faith Efforts to ensure compliance with City of Austin Code Chapter 2-9B. Submission of this plan is mandatory for a proposal to be deemed responsive.
PDF
PDF, High priority: read this firstsow
HighAI Summary for George Washington Carver Museum Facility Expansion - Scope of Services: This document outlines the Scope of Services for Solicitation CLMP379, seeking Architecture and Engineering (A/E) services for Phase 1A and 1B of the George Washington Carver Museum, Cultural and Genealogy Center facility expansion for the City of Austin Parks and Recreation Department. The project includes a new mezzanine administrative area, remodeling of existing suites, site improvements, and community-focused outdoor spaces.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for RFQ CLMP379 - George Washington Carver Facility Expansion 1A & 1B: Request for Qualifications (RFQ) issued by the City of Austin for professional services regarding the George Washington Carver Facility Expansion 1A & 1B. The document outlines submission deadlines (December 3, 2024), electronic filing instructions via eResponse, insurance requirements (General Liability, Professional Liability, etc.), and MBE/WBE compliance mandates. It includes contact information for the Procurement Specialist and Project Manager.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for RFQ CLMP379: George Washington Carver - Facility Expansion 1A & 1B: Request for Qualifications (RFQ) issued by the City of Austin for professional services regarding the George Washington Carver Facility Expansion 1A & 1B. The document outlines submission deadlines (December 3, 2024), electronic submission instructions via eResponse, MBE/WBE compliance requirements, and detailed insurance mandates including Professional Liability and General Liability. It includes contact information for the procurement specialist and project manager.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for RFQ CLMP379 - George Washington Carver Museum Facility Expansion Phase 1A & 1B: Request for Qualifications (RFQ) issued on 10/30/2024 for the George Washington Carver Museum, Cultural & Genealogy Ctr- Facility Expansion Phase 1A & 1B (CLMP379). Responses are due via eResponse by 12/03/2024 at 2:00 PM.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for RFQ CLMP379: George Washington Carver Museum Facility Expansion Phase 1A & 1B: Request for Qualifications (RFQ) issued on 10/30/2024 for the George Washington Carver Museum, Cultural & Genealogy Ctr- Facility Expansion Phase 1A & 1B (CLMP379). Responses are due by 12/03/2024 at 2:00 PM via the Austin Finance Online portal.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for RFQS_6100_CLMP379_ATT_4_v1 - Solicitation Instructions: This document provides detailed instructions for the preparation and submission of responses to a Request for Qualifications (RFQ) for the City of Austin. It outlines the requirements for the Statement of Qualifications (SOQ), electronic submission via Austin Finance Online, proprietary information marking, and strict adherence to the City's Anti-Lobbying and Procurement ordinances during the 'No-Lobbying Period'.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for RFQS_6100_CLMP379_ATT_4_v1 - Solicitation Instructions: This document provides detailed instructions for preparing a response to a Request for Qualifications (RFQ) for the City of Austin. It covers the submission process via Austin Finance Online, guidelines for marking proprietary information, communication protocols with authorized contact persons, and strict anti-lobbying regulations during the 'No-Lobbying Period' to ensure a fair and competitive procurement process.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for RFQS 6100 CLMP379 Attachment 2: This document serves as the requirements and proposal package for a Request for Qualifications (RFQ). It includes instructions to consultants, scope of services, evaluation criteria, MBE/WBE procurement program packets, and various proposal forms (Forms 1-9) including experience and compliance certifications.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for RFQS 6100 CLMP379 - Requirements and Proposal Forms: A Request for Qualifications (RFQ) package for professional services, including instructions to consultants, scope of services, evaluation criteria, MBE/WBE compliance requirements, and a comprehensive set of proposal forms (Forms 1-9) and wage reporting requirements.
PDF
PDF, Low priorityother
LowAI Summary for CLMP379 Form 3A Prime Firm's EEO Program: A certification form (Form 3A) for the City of Austin, Texas, regarding the George Washington Carver Facility Expansion 1A & 1B project (Solicitation CLMP379). The document requires the prime contractor to certify compliance with the City's Non-Discrimination and Non-Retaliation policies and EEO laws.
PDF
PDF, Low priorityother
LowAI Summary for CLMP379 - Form 3B Appendix A Title VI Assurances: This document is Form 3B Appendix A, detailing Title VI Assurances and non-discrimination provisions for solicitation CLMP379 (George Washington Carver - Facility Expansion 1A & 1B). It outlines the contractor's obligations to comply with federal nondiscrimination statutes, including requirements for subcontracts and reporting.
PDF
PDF, Low prioritysolicitation-form
LowAI Summary for CLMP379 Form 4 Consultant Availability - George Washington Carver Facility Expansion: A certification form for solicitation CLMP379 regarding the George Washington Carver Facility Expansion 1A & 1B. It requires prime firms and subconsultants to certify that proposed staff are available to perform the work and that key personnel are direct employees of the prime firm.
PDF
PDF, Low prioritypast-performance
LowAI Summary for CLMP379 - Form 7: Experience of Project Principal: A proposal submission form (Form 7) for solicitation CLMP379, George Washington Carver - Facility Expansion 1A & 1B. The document provides a template for the Project Principal to detail their professional experience, including specific project history, client references, and descriptions of work performed.
PDF
PDF, Low priorityother
LowAI Summary for CLMP379 George Washington Carver Facility Expansion - Title VI Assurances: Form 3B Appendix A regarding Title VI Assurances for solicitation CLMP379 (George Washington Carver - Facility Expansion 1A & 1B). The document outlines the contractor's obligations to comply with nondiscrimination statutes and regulations, including requirements for subcontracts and reporting.
PDF
PDF, Low priorityother
LowAI Summary for CLMP379 George Washington Carver Facility Expansion - Title VI Assurances: Form 3C Appendix E for Solicitation CLMP379 (George Washington Carver - Facility Expansion 1A & 1B). This document outlines the contractor's agreement to comply with various federal nondiscrimination statutes and authorities, including Title VI of the Civil Rights Act of 1964 and the Americans with Disabilities Act.
PDF
PDF, Low prioritysupporting-document
LowAI Summary for CLMP379 George Washington Carver - Form 2 Non-Collusion and Conflict of Interest: A certification form for solicitation CLMP379 (George Washington Carver - Facility Expansion 1A & 1B) requiring respondents to certify non-collusion, absence of conflicts of interest, compliance with anti-lobbying ordinances, and adherence to Texas Government Code requirements regarding boycotts and cybersecurity.
PDF
PDF, Low prioritysupporting-document
LowAI Summary for CLMP379 George Washington Carver - Form 2 Non-Collusion, Non-Conflict of Interest and Anti-Lobbying: Form 2 for solicitation CLMP379 (George Washington Carver - Facility Expansion 1A & 1B). This document requires the respondent to certify compliance with anti-collusion, anti-lobbying, and conflict of interest regulations, including Texas Government Code requirements and City of Austin ordinances.
PDF
PDF, Low prioritycertification
LowAI Summary for CLMP379 George Washington Carver - Form 3A Prime Firm's EEO Program: A Non-Discrimination and Non-Retaliation Certification form for solicitation CLMP379 (George Washington Carver - Facility Expansion 1A & 1B). The document requires the prime contractor to certify compliance with the City of Austin's EEO laws and non-retaliation policies as a condition of the contract.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for CLMP379 George Washington Carver - Title VI Assurances: Form 3C Appendix E regarding Title VI Assurances for Solicitation Number CLMP379 (George Washington Carver - Facility Expansion 1A & 1B). The document outlines the contractor's agreement to comply with various federal nondiscrimination statutes and authorities, including the Civil Rights Act of 1964, the ADA, and Executive Orders regarding environmental justice and limited English proficiency.
DOCX
DOCX, Low priorityother
LowAI Summary for RFQS_6100_CLMP379_ATT_9_v1 Vendor List: The document consists of a directory of professional services firms, engineering consultants, and architects, primarily based in Texas. It appears to be an attachment (Attachment 9) to a larger procurement file (RFQS_6100_CLMP379), serving as a vendor list or a list of potential respondents.
DOCX
DOCX, Low priorityother
LowAI Summary for RFQS_6100_CLMP379_ATT_9_v1 - Vendor List: The document is an attachment (Attachment 9) containing a directory of professional services firms and individual consultants, primarily based in Texas. It consists of a list of company names and addresses, likely serving as a vendor list or a list of interested parties for procurement solicitation RFQS 6100 CLMP379.
PDF
PDF, Low prioritysupporting-documents
LowAI Summary for RFQS 6100 CLMP379 George Washington Carver - Subcontract Vendor List: Version 2 of the Subcontract Vendor List for Solicitation No. RFQS 6100 CLMP379 (George Washington Carver - Facility Expansion 1A & 1B). The document provides a directory of qualified architectural service vendors within the SLBP area, including contact details, business types (MDB/SBE/WB), and ethnicity certifications.
PDF
PDF, Low prioritysupporting-documents
LowAI Summary for RFQS 6100 CLMP379 George Washington Carver - Subcontract Vendor List: Version 2 of the Subcontract Vendor List for Solicitation No. RFQS 6100 CLMP379 (George Washington Carver - Facility Expansion 1A & 1B). The document provides a directory of qualified architectural services vendors, including contact information, business types (MDB/SBE/WB), and ethnicity certifications for firms within the SLBP area.
Design services, preliminary through construction documents, for phase 1a & 1b of the Carver Museum Facility Expansion that was approved by Council in June 2021.