Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on October 3, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Georgetown Flume Off-Leash Area

Closed
2024-048State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 17 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The project involves excavating and disposing of contaminated soil at the former Flume Property located between Myrtle Street and East Marginal Way in the Georgetown Neighborhood, with the goal of creating enhanced public amenities. Key improvements include constructing a multi-use trail for bicycles and pedestrians, repairing pavement, establishing an off-leash dog park, and installing pedestrian lighting to improve safety and accessibility. The project is estimated to cost between $1.7 million and $1.9 million, with the funding and oversight managed by the Washington Public Works Department. The solicitation for this project was posted on October 3, 2024, with a response deadline set for October 23, 2024. The project is categorized under NAICS code 238910, which pertains to site preparation contractors. Interested parties can contact Peter Trinh via email or phone for further details. The project aims to enhance community recreation and connectivity in the Georgetown area, aligning with broader urban development and environmental remediation efforts.

General Info

Place of Performance

WA, USA

Set-Aside

NONE

Documents

4

Georgetown Flume Off-Leash Appendix - Payment and Performance Bond

PDF, High priority: read this firstbond
High

Georgetown Flume Off-Leash Area Bid Forms PW# 2024-048

PDF, High priority: read this firstbid-forms
High

Georgetown Flume Off-Leash Area Construction Plans

PDF, High priority: read this firstspecifications
High

Georgetown Flume Off-Leash Area Project Manual PW# 2024-048

PDF, High priority: read this firstrfb
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Public Works
Contacts1 person available
OfficeN/A
Organization / AgencyWashington → Public Works
Office AddressN/A

Full Description

Show more
Project Description: Excavate and dispose of contaminated soil and construct bicycle, pedestrian, and park improvements including multi-use trail, pavement repair, off-leash dog park, and pedestrian lighting. Engineer's Estimate: $1,700,000 to $1,900,000Project Location: The former Flume Property between Myrtle Street and East Marginal Way in the Georgetown Neighborhood.

More opportunities from Washington → Public Works

Same awarding agency

NAICS: 237310
New
SLED
Pedestrian Crossing Safety Improvements (FHWA)
Solicitation # 2025-041
The Pedestrian Crossing Safety Improvements project (PW# 2025-041 / HSIP-000S(708)) is a federally funded infrastructure initiative managed by the Seattle Department of Transportation. The project focuses on enhancing pedestrian safety across eight specific locations in Seattle, including intersections at 15th Ave S and Lander St, 33rd Ave S and Myrtle Pl, Renton Ave S and Holden St, 55th Ave S and Renton Ave S, Rainier Ave S and S Byron St, Rainier Ave S and S Findlay St, Rainier Ave S and S Mead St, and Beacon Ave S and S Webster St. The scope of work encompasses sidewalk and pavement removal and restoration, the installation of pedestrian islands, curbs, curb ramps, drainage structures, and pipes, as well as clearing, grubbing, landscaping, and the installation of RRFB and traffic signals, signing, channelization, electrical work, and rebar. The engineer's estimate for the project is between $3,250,000 and $3,350,000. The contract is awarded to the apparent low bidder who meets all mandatory responsibility criteria, with a tie-breaker based on the highest percentage of recycled materials proposed. Performance must be completed within 120 working days from the Notice to Proceed. Funding is provided by the HSIP FHWA Grant and the Transportation Levy Fund, requiring compliance with Federal Prevailing Wage Rates, Buy America standards, and Federal Small Business Enterprise (FSBE) goals. Bidders must provide a bid guaranty of five percent of the total bid and certify compliance with equal opportunity and non-discrimination laws. The project is subject to rigorous inspection by the Engineer to determine substantial completion, which requires the owner to have full operational and safety use of the facilities.
Highway, Street, and Bridge Construction

POSTED

about 16 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
1st Ave NE Shared Use Path - N 120th to N 130th
Solicitation # PW#2026-005
The City of Seattle Public Works department is soliciting bids for the 1st Ave NE Shared Use Path project, located between N 120th and N 130th Streets, adjacent to North Acres Park and near James Baldwin Elementary School. The scope of work is divided into a base bid, which includes pavement removal, roadway paving, sidewalks, curb ramps, storm drains, landscaping, channelization, and signage, and additive work consisting of electrical installations, foundations, and pedestrian lighting. The project requires a performance period of 120 working days for the base bid or 140 working days if additive work is included. Bids must be submitted electronically via the OpenGov portal by October 28, 2026. The contract will be awarded to the apparent low bidder who meets strict responsibility criteria, including possession of a Seattle Business License, registration on the OpenGov portal, and compliance with fair labor standards and social equity requirements. Bidders must provide a bid guaranty of five percent of the total bid and are required to submit a WMBE Inclusion Plan and a Social Equity Plan. Post-award performance will be evaluated based on workforce requirements, priority hire projections, and apprenticeship utilization. The contractor is responsible for all labor, materials, and equipment, ensuring all work meets City of Seattle Standard Specifications and ADA compliance for curb ramps. Payment is contingent upon the submission of signed statements certifying that prevailing wages have been paid.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in about 7 hours
View Details
NAICS: 236220
New
SLED
Dahl Restroom Renovation
Solicitation # 2025-068
Solicitation PW#2025-068 is for the renovation of a fire-damaged Parks storage and restroom building located at 7700 25th Ave NE, Seattle, WA. The scope of work includes replacing fire-damaged structural timber frames, installing shear walls, replacing the roof, and removing an existing stone chimney. Interior improvements involve converting the facility into two single-occupancy restrooms with entirely new electrical and plumbing systems. Additionally, the project requires accessibility site improvements, including the revision of accessible parking stalls, sidewalks, and the pathway leading to the restrooms. The engineer's base estimate for the project is $968,676.00. The contract will be awarded to the responsible bidder providing the lowest responsive bid, with evaluation based on mandatory responsibility criteria and supplemental factors such as labor standards compliance, equal benefits declarations, and apprentice utilization. Bidders must submit their proposals electronically via OpenGov by November 4, 2026. Key requirements include a bid guaranty of five percent of the total bid, adherence to prevailing wage rates, and compliance with ADA standards. The contractor is subject to liquidated damages of $1,000.00 per working day for delays beyond the substantial completion date. All work is subject to inspection and final approval by the Engineer.
Commercial and Institutional Building Construction

POSTED

6 days ago

DEADLINE

in 7 days
View Details
NAICS: 562991
New
SLED
Stormwater Filter Facility Maintenance
Solicitation # 2026-GEN-013
The City of Washougal is soliciting bids for the inspection and maintenance of stormwater filter cartridge facilities, including filter catch basins, manholes, and vaults. The scope of work comprises a base bid for 23 City-maintained facilities containing up to 134 cartridges and an optional alternate bid for up to 10 HOA-maintained facilities containing up to 63 cartridges. Key responsibilities include facility inspections, replacement of cartridges based on Ecology TAPE guidance, vacuum cleaning of facility floors, implementation of traffic control plans for specific high-traffic areas, and the proper hauling and disposal of all waste materials. All work must be documented via Survey123 and completed within 90 calendar days of the notice to proceed, with a final completion deadline of March 15, 2027. Bids must be submitted electronically via the OpenGov portal by November 5, 2026, at 2:00 p.m. PT. Requirements for bidders include the submission of a Bid Bond, E-Verify Declaration, Wage Compliance, and Non-Collusion forms, as well as acknowledgment of Addendum No. 1. The project mandates the payment of prevailing wages and requires the contractor to provide performance and payment bonds for the full contract amount. Payment will be made via checks within 30 days of approved progress payment requests, with a 5 percent retention held during the progress of the work. Partial funding for this project is provided through the Washington State Department of Ecology.
Septic Tank and Related Services

POSTED

7 days ago

DEADLINE

in 8 days
View Details
NAICS: 237310
SLED
Roosevelt Way Preservation (FHWA)
Solicitation # 2025-074
The Roosevelt Way Preservation Project is a federally funded infrastructure solicitation issued by the City of Seattle Public Works. The project scope focuses on roadway improvements along Roosevelt Way NE from NE 92nd Street to Pinehurst Way NE, and Pinehurst Way NE from Roosevelt Way NE to 15th Avenue NE. Key work elements include planing asphalt overlay, removing and replacing concrete panels and base repair, intersection realignment at NE 113th Street, and the installation of curb bulbs at NE 114th and NE 115th Streets. Additional requirements encompass ADA compliant curb ramps, sidewalk restoration, channelization, signing, concrete bike barriers, traffic signals, landscaping, and storm drainage. The engineer's estimate for the project is between $12,500,000 and $12,800,000. Bids for the project are due by November 4, 2026, with the award based on the lowest responsive bid total. The project incorporates a Federal Small Business Enterprise goal of 13% and requires strict adherence to Buy America provisions and 2010 ADA Standards. Bidders must be registered under RCW 18.27 and provide a bid guaranty of five percent of the total bid. Contract administration includes progress payments via warrants based on engineer estimates, and the contractor must provide federal payment and performance bonds. In the event of a tie in bid totals, the award will be determined by the highest percentage of recycled materials proposed, followed by a random drawing if necessary.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

in 7 days
View Details
NAICS: 541330
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Engineering Services

POSTED

8 days ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS