Geotechnical Drilling and Sampling
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract for Geotechnical Drilling and Sampling involves performing subsurface exploration and soil sampling for prime contractors on Sacramento County Department of Transportation bridge projects. The scope of work requires drilling three bore holes at existing bridge pier locations within the Georgiana Slough waterway in Isleton to assess subsurface conditions. The contractor must utilize specialized sampling tools and drilling rigs capable of operating over water while ensuring full compliance with Section 1602 of the Fish and Game Code. The final deliverables include the completed bore holes and the provision of physical soil and rock samples.
General Info
Agency
Place of Performance
Isleton, CASet-Aside
Documents
This scope was carved out of EPIMS-SAC-58445-R3.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
Tyler Island Road Bridge over Georgiana Slough Technical Analysis (Streambed Alteration Agreement No. EPIMS-SAC-58445-R3)
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
