Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on January 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Geotechnical - HWY 13 & 36 Geotechnical Design and Construction Administration

Closed
SK-HWY-250068-LFRFPInternational

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 CPRG NCD SOQ
Solicitation # 2026-SOQ-004
The City of Rogers is soliciting Statements of Qualifications (SOQ) under solicitation number 2026-SOQ-004 for Natural Channel Design services to restore approximately 4,200 linear feet of stream in an urban setting. The scope of work includes engineering, plan design, hydrologic and hydraulic modeling, and the procurement of all necessary local, state, and federal regulatory permits, including potential Letter of Map Revision submissions to FEMA. This project is funded by the Climate Pollution Reduction Grant (CPRG) subaward CPRG-NWA-001 and EPA award 02F75801, requiring compliance with EPA nondiscrimination regulations, Title VI of the Civil Rights Act of 1964, and 40 CFR Parts 5 and 7. Key milestones include the completion and approval of construction plans and permit applications by May 1, 2027, with final construction completion targeted for December 31, 2027. Selection is based on a ranking of qualifications rather than price, with the highest-ranked firm invited to negotiate a contract. Evaluation criteria focus on professional staff expertise, past performance, understanding of the scope, and the quality of the work plan. Interested firms must submit a PDF via OpenGov or hard copy to Colt Craig by November 10, 2026. Submissions are limited to 25 pages and must include Standard Form 330 Part II, an Equal Employment Opportunity policy, the Arkansas DFA Illegal Immigrant Contractor Disclosure Form, and EPA certifications regarding debarment and lobbying for contracts exceeding 100,000 dollars. Additionally, firms must maintain active registration in SAM.gov and demonstrate a commitment to DBE goals through six good faith efforts in subcontracting per 40 CFR 33.301.
Community Development

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 541330
New
International
Pump Optimisation and Aeration Efficiency Analysis
Solicitation # FA2253
Thames Water Utilities Limited is establishing a single-lot, sole-supplier framework agreement under solicitation FA2253 for pump optimisation and aeration efficiency services. The contract focuses on the monitoring, testing, and analysis of pumping and aeration systems across approximately 60 operational sites, encompassing roughly 200 tests during the AMP period. The primary objective is to reduce whole-life costs and improve operational performance through a structured delivery model that includes site identification, efficiency studies, and performance monitoring. The agreement will feature fixed pricing structures based on an agreed rate card and will be managed through key performance indicators to ensure strategic partnership and continuous improvement. The contract is scheduled for an initial three-year term starting May 10, 2027, with potential extensions up to a maximum of eight years, ending May 9, 2035. Eligible suppliers must demonstrate a proven track record of delivering measurable savings and innovation and must have the capacity to operate within London, the Thames Valley, and the Home Counties. Award selection is based on a 50% technical and 50% commercial weighting. The procurement process is a multi-stage procedure requiring a Pre-Selection Questionnaire via SAP Ariba by October 19, 2026, followed by an Invitation to Negotiate stage. Successful providers must also meet stringent insurance requirements, including 15 million pounds for public and products liability and 10 million pounds for professional indemnity.
Thames Water Utilities Limited

POSTED

about 3 hours ago

DEADLINE

N/A
NAICS: 541330
New
SLED
Request for Qualifications - Conn Dam Stability Assessment, Spillway Improvements, and Feasibility Alternatives Study
Solicitation # 2026-RFQL-054
The City of Napa Utilities Department is seeking a qualified consulting team through Request for Qualifications 2026-RFQL-054 to perform a stability assessment, spillway improvements, and a feasibility alternatives study for the Conn Dam. The project is driven by requirements from the California Department of Water Resources Division of Safety of Dams (DSOD), which identified that the existing spillway does not meet current Probable Maximum Flood (PMF) design criteria and raised concerns regarding the long-term geotechnical stability of the dam embankment. The selected consultant will be responsible for conducting comprehensive subsurface explorations, performing static and seismic slope stability evaluations, and recommending alternatives to mitigate spillway deficiencies. Additionally, the scope includes evaluating options to increase reservoir storage capacity to enhance water supply reliability and flood protection, while supporting future U.S. Army Corps of Engineers (USACE) feasibility studies. This procurement follows a Qualifications-Based Selection process per the Brooks Act, where the award is based on technical capability and experience rather than cost. Evaluation is a two-step process consisting of a Statement of Qualifications weighted at 70 percent and optional oral interviews weighted at 30 percent. A critical project milestone is the submission of a comprehensive geotechnical investigation report to the DSOD by December 31, 2028. The contract requires strict adherence to federal and state regulations, including 2 CFR Part 200 Uniform Guidance, the Build America Buy America Act, and various civil rights and accessibility certifications. Statements of Qualifications are due by October 29, 2026, via the City's Opengov procurement portal.
Utilities Department

POSTED

about 4 hours ago

DEADLINE

in about 5 hours

AI Contract Overview

Show more

The contract entails providing geotechnical design and construction administration services for the remediation of two geohazard sites located along Highway 13 near Verwood and Highway 36 north of Willow Bunch in Saskatchewan. These sites are experiencing landslide issues that require stabilization and remediation to ensure safe highway conditions. The Ministry of Highways aims to tender the project by summer 2026, with construction planned for the 2027 season. The exact timing of construction will depend on ongoing site monitoring, final design outcomes, and available funding. The scope of work covers geotechnical services specifically focused on the design and oversight during construction phases to address the landslide concerns at both the Verwood Railway Overpass on Highway 13 and the Willow Bunch North site on Highway 36. Consultants interested in participating should note that prequalified firms on probation should consult the Professional Services Procurement Manual for eligibility guidelines. The procurement and contract management are overseen by SaskBuilds and Procurement on behalf of the Government of Canada, with questions directed to the designated contracting authority.

General Info

Provide geotechnical design and construction administration for two landslide remediation sites in Saskatchewan.

Place of Performance

Saskatchewan, CAN

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Jan 26, 2026 to Feb 2, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → SaskBuilds and Procurement
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
SBP ConsultantsContracting Authority

Full Description

Show more
LFRFP 250068, Geotechnical Design and Construction Administration for Highway 13-10 km 8.6 and 36-02 km 30 The Saskatchewan Ministry of Highways (Ministry) is planning the remediation of two geohazard sites (the Project) located along Highway 13 near Verwood and Highway 36 north of Willow Bunch. The target tender date for the project is summer of 2026, with construction anticipated for the 2027 construction season. Construction dates will be determined based on the site monitoring data, final design, and availability of funds. The Ministry requires geotechnical design services and construction administration for the remediation of the following sites: Site #1: Highway No. 13 C.S. 13-10 km 8.6 Verwood Railway Overpass (Landslide Issues) Site #2: Highway No. 36 C.S. 36-02 km 30 Willow Bunch North (Landslide Issues) Category of Work: Geotechnical Additional InformationPrequalified Consultants being held in a probationary status at time of competition close and evaluation, should reference the Professional Services Procurement Manual - PSPM 100-04 for additional information pertaining to their eligibility to participate in this competition. For questions regarding a Consultants status, contact the competition contact indicated in LFRFP 250068.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS