Gilman Springs Road Bridge Replacement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The County of Riverside Transportation Department, in collaboration with Caltrans, is advancing the Gilman Springs Road Bridge Replacement Project to replace the aging two-lane bridge over Potrero Creek with a new structure located slightly southwest of the existing alignment. This project, part of the Highway Bridge Program, includes not only bridge replacement but also roadway realignment to enhance operational efficiency and geometric safety at the approach areas. The project site is in San Jacinto, California, with all construction and mitigation activities centered along Gilman Springs Road. Although the contract is not a traditional federal procurement under FAR, it is subject to extensive environmental compliance requirements under CEQA and state and federal regulations, with key responsibilities falling to the contractor for implementing mitigation measures tied to biological resources, water quality, hazardous materials, and cultural resources. The work encompasses grading, excavation, paving, utility relocation, and strict adherence to prescribed environmental controls including stormwater BMPs, asbestos and lead detection, PCB screening of transformers, and invasive species prevention during revegetation. Contract administration is overseen by Don Copeland, Senior Transportation Planner at the County of Riverside, with technical support from ICF Consulting’s Court Morgan. While no formal contract clause numbers, pricing line items, or evaluation factors for award are specified, environmental mitigation measures serve as de facto contractual obligations under project-specific identifiers such as SM VIS-1, AMM-HAZ-6, and SM WQ-1. These are integrated into the Mitigation Monitoring and Reporting Program and enforce requirements ranging from pre-construction surveys for cultural and biological resources to ongoing post-construction habitat restoration monitoring spanning up to five years. The project’s environmental documentation, including appendices on acronyms, emissions estimates, tribal correspondence, and technical studies, outlines the standards that guide construction practices, with compliance monitored by regional agencies such as the California Department of Fish and Wildlife and the U.S. Fish and Wildlife Service. Proposals must be submitted by August 12, 2026, to the County’s address in Riverside, with no indication of estimated contract value, payment procedures, or procurement type, reflecting its status as a locally administered infrastructure initiative governed primarily by environmental regulatory frameworks rather than standard federal contracting mechanisms.
General Info
Agency
NAICS
Place of Performance
State Route 79 and Gilman Springs Road, San Jacinto, CA, N/ASet-Aside
Timeline
Organization & Contact Information
Interested Companies (1)
Full Description
Similar Contracts
Same NAICS industry code
