Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Gilman Springs Road Bridge Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The County of Riverside Transportation Department, in collaboration with Caltrans, is advancing the Gilman Springs Road Bridge Replacement Project to replace the aging two-lane bridge over Potrero Creek with a new structure located slightly southwest of the existing alignment. This project, part of the Highway Bridge Program, includes not only bridge replacement but also roadway realignment to enhance operational efficiency and geometric safety at the approach areas. The project site is in San Jacinto, California, with all construction and mitigation activities centered along Gilman Springs Road. Although the contract is not a traditional federal procurement under FAR, it is subject to extensive environmental compliance requirements under CEQA and state and federal regulations, with key responsibilities falling to the contractor for implementing mitigation measures tied to biological resources, water quality, hazardous materials, and cultural resources. The work encompasses grading, excavation, paving, utility relocation, and strict adherence to prescribed environmental controls including stormwater BMPs, asbestos and lead detection, PCB screening of transformers, and invasive species prevention during revegetation. Contract administration is overseen by Don Copeland, Senior Transportation Planner at the County of Riverside, with technical support from ICF Consulting’s Court Morgan. While no formal contract clause numbers, pricing line items, or evaluation factors for award are specified, environmental mitigation measures serve as de facto contractual obligations under project-specific identifiers such as SM VIS-1, AMM-HAZ-6, and SM WQ-1. These are integrated into the Mitigation Monitoring and Reporting Program and enforce requirements ranging from pre-construction surveys for cultural and biological resources to ongoing post-construction habitat restoration monitoring spanning up to five years. The project’s environmental documentation, including appendices on acronyms, emissions estimates, tribal correspondence, and technical studies, outlines the standards that guide construction practices, with compliance monitored by regional agencies such as the California Department of Fish and Wildlife and the U.S. Fish and Wildlife Service. Proposals must be submitted by August 12, 2026, to the County’s address in Riverside, with no indication of estimated contract value, payment procedures, or procurement type, reflecting its status as a locally administered infrastructure initiative governed primarily by environmental regulatory frameworks rather than standard federal contracting mechanisms.

General Info

Replace Gilman Springs Road bridge with environmental compliance, mitigation, and roadway realignment in San Jacinto.

Agency

California → Riverside County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

State Route 79 and Gilman Springs Road, San Jacinto, CA, N/A

Set-Aside

NONE

Documents

(5)

Gilman Springs Road Bridge Replacement Draft Initial Study and Mitigated Negative Declaration July 2026

PDFenvironmental-assessment

Gilman Springs Road Bridge Replacement Project Notice of Completion

PDFnotice-of-completion

SCH Summary Form for Gilman Springs Road Bridge Replacement Project

PDFenvironmental-summary

Gilman Springs Road Bridge Replacement Public Notice Spanish

PDFspecial-notice

Gilman Springs Road Bridge Replacement Project Notice of Availability

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Riverside County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Riverside County
Office AddressN/A
Contacts
Don CopelandSenior Transportation Planner
Court MorganManaging Director

Interested Companies (1)

Show more
ICF
Atlanta, Georgia

Full Description

Show more
The County of Riverside Transportation Department (County), in cooperation with the California Department of Transportation (Caltrans), is proposing to replace the existing Gilman Springs Road Bridge over Potrero Creek (Bridge Number 56C-0523). The Project is programmed as part of the Highway Bridge Program (HBP). The Project proposes to replace the existing two-lane bridge along Gilman Springs over Potrero Creek with a new two-lane bridge. The new bridge would be located slightly southwest of the existing two-lane bridge alignment. Along with replacing the aging bridge, the Project would realign the roadway to improve the operational characteristics and geometrics related to the bridge and roadway approaches.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified Small Business Enterprises (SBE), Veteran-Owned Small Business Enterprises (VSBE), and Disadvantaged Business Enterprises (DBE) to serve as subcontractors, material contractors, and suppliers for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The extensive scope of work encompasses civil and site work, including tunneling, boring, and shoring; utility installation involving various piping materials and cathodic protection; asphalt and concrete paving; and specialized electrical and telecommunications systems. The bid deadline is September 15, 2026, with invitations to bid issued through the BuildingConnected system. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades, including carpenters, laborers, and operating engineers, and must demonstrate an ability to maintain labor harmony. Eligible bidders must possess a valid California Contractor license and provide acceptable insurance, with some subcontractors potentially requiring bonding for 100 percent of their contract value, for which Kiewit will reimburse premiums. This project is partially funded by multiple grants from the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating strict adherence to DBE Program requirements. SBE and VSBE firms must provide certification evidence from the Department of General Services and the Port of Long Beach PlanetBids portal.
Kiewit Infrastructure West Co.

POSTED

about 22 hours ago

DEADLINE

in 17 days
View Details