Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Louisiana was posted on March 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

GIS Integration and Data Deliverables for Asset Management

Closed
State & Local
Submission Closed

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Federal
Consulting Services for Chino Basin Program Aquifer Replenishing Facilities Design
Solicitation # RFP-JV-26-013
The Inland Empire Utilities Agency is soliciting engineering consulting services for the Chino Basin Program Aquifer Replenishing Facilities Design Project under solicitation RFP-JV-26-013. The scope of work encompasses project initiation, data gathering, basis of design, detailed design, and procurement support, with specific deliverables including technical specifications for flow control, SCADA systems, and I&C integration. The project requires compliance with California Code of Regulations Title 22 for indirect potable reuse and adheres to Cal OSHA, ADA, and NFPA standards. The agency aims to begin construction of injection and monitoring wells by May 2028 and complete injection well equipping by July 2029. This is a small business set-aside opportunity open to SBA certified Veteran Owned Small Businesses, Service-Disabled Veteran Owned Small Businesses, Women-Owned Small Businesses, and HUBZone Small Businesses. Proposals must be submitted via PlanetBids by January 26, 2027, and must not exceed 35 pages. Selection is based on a ranking of proposals focusing on team qualifications and the level of effort, with the top three candidates potentially undergoing interviews before the top-ranked consultant negotiates a not-to-exceed contract. All payments are made via ACH, and the agency retains ownership of all project materials and data.
Inland Empire Utilities Agency

POSTED

about 1 hour ago

DEADLINE

in about 2 months
NAICS: 541330
New
Federal
RFP-JV-26-014 Consulting Services for Chino Basin Program Purified Water Conveyance Design Project
Solicitation # EN25022.03 AND EN28004
The Inland Empire Utilities Agency (IEUA) is soliciting engineering consulting services for the Chino Basin Program Purified Water Conveyance Design Project in California. The scope of work involves the design and development of a purified water conveyance system to transport water from the Advanced Water Purification Facility to injection wells. Key responsibilities include project initiation, data gathering, detailed design, and assistance during the bid phase. Deliverables consist of technical reports, specifications, calculations, construction schedules, and Opinion of Probable Construction Cost estimates. The project follows a tiered design acceptance process at 60 percent, 90 percent, and final stages, and must adhere to specific engineering design guidelines and federal and state grant funding requirements, including Buy America preferences for infrastructure materials. This is a small business set-aside opportunity available to SBA certified Veteran Owned Small Businesses, Service-Disabled Veteran Owned Small Businesses, Women-Owned Small Businesses, and HUBZone Small Businesses. The contract is a not-to-exceed agreement paid on a time and material basis, with a specific 50,000 dollar allowance for mitigation measures. Proposals are due by January 26, 2027, and will be evaluated based on a 100-point scale focusing on risk mitigation, technical challenges, and project implementation. Selection is based on a ranking process where the top three consultants are shortlisted for fee review and potential interviews before final approval by the IEUA Board of Directors. All work is governed by the laws of the State of California and the County of San Bernardino.
Inland Empire Utilities Agency

POSTED

about 1 hour ago

DEADLINE

in about 2 months
NAICS: 541330
New
SLED
Walk-In Evidence Freezer Room – Assessment & Planning Consulting Services for Sacramento Sheriff's Office (SSO)
Solicitation # 2026-RFP-0128
The Sacramento County Sheriff's Office (SSO) is seeking a qualified consulting firm to evaluate the existing walk-in evidence freezer room at the Property Warehouse. The primary objective is to assess current conditions, identify deficiencies, and provide a comprehensive report recommending whether to repair or replace the equipment and related systems. The project is divided into two phases: Phase 1 involves a thorough assessment including photographs, measurements, and an improvement plan, while an optional Phase 2 covers the production of bid-ready construction documents. All work must be led by a California-licensed engineer, and any design documents must be signed and sealed by one. This is a consulting services contract only; the selected firm will not be responsible for the actual furnishing or installation of the freezer. The project must adhere to California Penal Code Section 1417.5, California Department of Justice standards, IAPE guidelines, and NIST recommendations. Funding is provided by the County, though equipment may be purchased via the Edward Byrne Memorial Justice Assistance Grant (JAG), which subjects equipment purchases to the Buy American Act and NEPA rules. Proposals must be submitted via the SacCountyE bids portal by December 18, 2026. There is no specific set-aside status for this solicitation. Payment for the assessment and design phases is contingent upon County acceptance of the completed deliverables.
DGS: CAPSD - Procurement

POSTED

about 10 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Professional Design Services For The Powell Street Sanitary Sewer Main Pipeline Rehabilitation Project
Solicitation # 20261127006
The City of Emeryville is seeking professional design services for the Powell Street Sanitary Sewer Main Pipeline Rehabilitation Project. The scope of work involves the full replacement of the gravity sewer main from MH 21.100.27 to MH 21.000.00, with a focus on mitigating differential settlement caused by bay fill soil and increasing pipe slope by lowering the final invert elevation at MH 21.000. The selected engineering team will be responsible for delivering Plans, Specifications, and Estimates (PS&E), developing public outreach plans, and coordinating connections with the EBMUD North Interceptor pipeline, as well as collaborating with Caltrans and other agencies. Proposals are due by January 6, 2027, and will be evaluated based on technical experience with sewer main design in soft soil conditions, project approach, experience coordinating with EBMUD, and methods for maintaining budget and schedule. The selection process may include shortlisting and interviews before negotiating a not-to-exceed price contract. The project requires adherence to the City's standard professional services contract, including insurance requirements and compliance with Emeryville Municipal Code regarding minimum wage and living wage ordinances. Design submittals are required at 30%, 60%, 90%, and final design phases. There is no set-aside status for this solicitation.
City of Emeryville

POSTED

about 11 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Sewerage & Water Board of New Orleans is seeking a subcontractor for the GIS Integration and Data Deliverables for Asset Management project. The primary objective of this contract is the development of GIS-compatible outputs, including APIs, dashboards, and reports, to effectively integrate pipeline data into the organization's asset management systems. This opportunity is categorized under NAICS code 541330. The solicitation was posted on March 27, 2026, with a response deadline of April 30, 2026. There is no specified set-aside status for this procurement.

General Info

Documents

This scope was carved out of 123460-2026-SWB-20.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Assessment & Repair/Replacement Technologies for Water Infrastructure

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Consulting Services for Chino Basin Program Aquifer Replenishing Facilities DesignOpen now, due in 59 days
  • DBE Subconsultant Opportunity - Qualifications for E Wells PFAS Groundwater Treatment ImprovementsOpen now, due in 4 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyLouisiana → Sewerage & Water Board of New Orleans
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Development of GIS-compatible outputs including dashboards, APIs, and reports to integrate pipeline data into SWBNO’s asset management systems.

More opportunities from Louisiana → Sewerage & Water Board of New Orleans

Same awarding agency

NAICS: 332919
SLED
Brass Water Service Fittings
Solicitation # 123460-2026-SWB-41-Brass
The Sewerage and Water Board of New Orleans is soliciting bids for the supply of Brass Water Service Fittings under solicitation number 123460-2026-SWB-41-Brass. This is a materials and supplies procurement with an initial two-year contract term and three one-year renewal options. The contract will be awarded to the lowest responsive bidder, with the Board reserving the right to award items separately, grouped, or on an all-or-none basis. A key requirement for award is meeting a Disadvantaged Business Enterprise (DBE) contract percentage goal of 30%. Bids must be submitted as signed hard copies in sealed envelopes to Kevin Smith by December 7, 2026, at 11:00 AM CST. Technical specifications require that all brass parts be cast or pinned with NL and SWBNO for identification, though the Board may waive this for unforeseen lead time delays. Material composition must adhere to specific standards, including a maximum lead content of 0.09%. Deliveries are to be made FOB to the SWBNO Central Yard in New Orleans, with a packaging limit of twenty-five fittings per box. Each delivery must include a ticket detailing the PO number, date, quantity, ticket number, item description, and delivery point. Bidders seeking approval for equivalent products must submit samples to the Warehouse Manager at least ten days before the proposal opening.
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

15 days ago

DEADLINE

in 9 days
View Details
NAICS: 541330
SLED
Owner Advisor Services for Water Quality Master Plan-Phase 1
Solicitation # 123460-2026-SWB-67
The Sewerage and Water Board of New Orleans is soliciting proposals from registered professional engineering firms in Louisiana to provide Owner Advisor services for the Water Quality Master Plan Phase I project. This project focuses on replacing pretreatment basins at the Carrollton Water Plant with new plate settler pretreatment basins with a total capacity of 240-mgd, utilizing a Construction Manager at Risk delivery method. The selected firm will act as an extension of the Board's staff, providing technical, procurement, scheduling, and risk management oversight from inception through final completion, including the development and validation of the Guaranteed Maximum Price. Proposals must be submitted via email to [email hidden] by December 11, 2026, and must not exceed 20 pages. The evaluation process is conducted in two stages, beginning with a technical evaluation based on proposer experience, methodology, project samples, and a 35 percent DBE participation goal, followed by a price evaluation. Key personnel, including the Program Manager and Project Manager, must be full-time employees working within the New Orleans Metropolitan area, and the Program Manager must be a Louisiana licensed professional engineer. Only Task 1 will be initially awarded, with subsequent tasks subject to performance and funding availability.
Engineering Services

POSTED

26 days ago

DEADLINE

in 13 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS