Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Brass Water Service Fittings Supplier

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

LA, USA

Set-Aside

NONE

Documents

This scope was carved out of 123460-2026-SWB-41-Brass.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Brass Water Service Fittings

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyLouisiana → Sewerage & Water Board of New Orleans
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies lead-free brass water service fittings for prime contractors on Sewerage & Water Board of New Orleans (SWBNO) supply contracts. Manufactures or sources fittings from the SWBNO Approved Brass Fittings List, ensuring all parts have 'NL' and 'SWBNO' cast or pinned into the main body. Packages units in quantities of 25 or fewer per box. Delivers components FOB to the SWBNO Central Yard. Delivers the accepted brass fittings and required delivery tickets.

Similar Contracts

Same NAICS industry code

NAICS: 332710
New
Federal
Machine Parts Small Shroud Testing Antennae
Solicitation # N6660427Q0058
Solicitation N6660427Q0058 is a Firm Fixed Price procurement issued by the Naval Undersea Warfare Center Division Newport for the manufacture of machine parts for small shroud testing antennae. This requirement is a 100% Small Business Set-Aside under NAICS 332710. The scope of work involves the production of several specific components, including blank housings, RF window sets, extension rings and tubes, an exterior radome, and mounting and locking rings, all of which must be manufactured in accordance with Government-supplied drawings. Deliveries are designated as FOB destination to Newport, Rhode Island, with a required delivery date of March 19, 2027, and an anticipated award month of December 2026. Award will be granted to the Lowest Price Technically Acceptable offeror. To be considered technically acceptable, bidders must provide their best delivery lead time, a detailed technical approach identifying specific machining and inspection equipment, and a past performance report limited to three references and two pages. Due to the nature of the technical drawings, offerors must possess a valid Joint Certification Program certification and a DD2345 form. Furthermore, eligibility to receive drawings is contingent upon having a CMMC Level 2 self-assessment or higher and a NIST SP 800-171 DoD Assessment score not more than three years old, both posted in the Supplier Performance Risk System. All items with a unit acquisition cost of $5,000 or more must include a Unique Item Identifier.
Nuwc Division Newport

POSTED

about 8 hours ago

DEADLINE

in 17 days
View Details

More opportunities from Louisiana → Sewerage & Water Board of New Orleans

Same awarding agency

NAICS: 212312
SLED
Limestone No. 610
Solicitation # 123460-2026-SWB-64
The Sewerage and Water Board of New Orleans is soliciting bids for the procurement of an estimated 20,000 tons of Limestone No. 610. The contract features an initial term of two years with three optional one-year renewals. Bidders must provide pricing that remains firm throughout the contract term, though price adjustments may be requested during renewal periods based on the U.S. Bureau of Labor Statistics Producer Price Index. The Board reserves the right to award the contract to a single or multiple bidders and may adjust estimated quantities by up to 100 percent, guaranteeing payment for at least 10 percent of the approximated amount. Technical compliance is mandatory, requiring materials to meet the standards of the Louisiana Standard Specifications for Roads and Bridges Gold Book, Section 1003. Bidders must submit certified laboratory test results for gradation, soundness, dry rodded unit weight, and abrasion. Deliveries are F.O.B. to designated job sites within New Orleans, including Algiers, and the contractor must allow SWBNO personnel access to stockpiles for random sampling. Responses must be submitted as signed hard copies in sealed envelopes to Procurement Specialist Kimberly Barnes by November 17, 2026, at 11:00 a.m. CDT. Electronic submissions via email or fax are prohibited. To be deemed responsive, bids must be written in ink or typewritten and include all required documentation, including the bid form, cover sheet, and economically disadvantaged participation forms. Invoices are to be submitted in duplicate to the accounting department via email, referencing the purchase order and delivery ticket numbers.
Crushed and Broken Limestone Mining and Quarrying

POSTED

12 days ago

DEADLINE

in 4 days
View Details
NAICS: 541330
SLED
Owner Advisor Services for Water Quality Master Plan-Phase 1
Solicitation # 123460-2026-SWB-67
The Sewerage and Water Board of New Orleans is soliciting proposals from registered professional engineering firms in Louisiana to provide Owner Advisor services for Phase I of the Water Quality Master Plan. This project focuses on replacing pretreatment basins at the Carrollton Water Plant with new plate settler pretreatment basins featuring a total capacity of 240-mgd. Utilizing the Construction Manager at Risk delivery method, the selected firm will act as an extension of the Board's staff, providing technical guidance, procurement support, risk management, and project oversight from inception through final commissioning and warranty periods. Key responsibilities include developing procurement documents, validating the Guaranteed Maximum Price, and coordinating design to maintain plant operations during construction. Proposals are due by December 11, 2026, and must be submitted via email in a searchable PDF format, adhering to a strict 20-page limit. The evaluation process is two-staged, prioritizing technical qualifications—including team experience, methodology, and project samples—before opening cost proposals for negotiation. A significant emphasis is placed on diversity, with a mandatory 35 percent DBE participation goal. Key personnel, specifically the Program Manager and Project Manager, must be full-time employees based in the New Orleans Metropolitan area, with the Program Manager required to be a Louisiana licensed professional engineer. While only Task 1 will be initially awarded, subsequent tasks may be awarded based on performance and funding availability.
Engineering Services

POSTED

12 days ago

DEADLINE

in 28 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS