Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Glendale Sports Complex Field 3 Artificial Turf Project

Open
3874State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Glendale Sports Complex Field 3 Artificial Turf Project, solicitation number 3874, is a project for the City of Glendale, California, to replace synthetic turf and implement drainage improvements. The scope of work includes the removal of existing synthetic turf, the installation of a new infilled synthetic grass surfacing system, shock pad installation, precise grading of base materials, and upgrades to irrigation and drainage systems. The estimated contract value ranges from $1.3 million to $1.8 million. The project requires the contractor to achieve substantial completion within 90 calendar days from the notice to proceed. Bidders must hold California contractor licenses Class A and D-12 and demonstrate experience by having completed at least three prevailing wage public contracts of comparable scale in California within the last five years. The contract will be awarded to the lowest responsive and responsible bidder. Mandatory requirements include registration with the California Department of Industrial Relations, the provision of performance and payment bonds, and supplementary bonding insurance to indemnify the design team against specific patent infringement. Bids are due by January 6, 2027, and must be submitted in a sealed envelope to the City Clerk of Glendale. There is no specified set-aside status for this solicitation.

General Info

City of Glendale turf replacement project costing $1.3-$1.8 million due January 6, 2027.

Place of Performance

Glendale, CA, 91208, USA

Set-Aside

NONE

Documents

5
PDF, High priority: read this first5 pages · specifications
High
PDF, High priority: read this first16 pages · specifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first4 pages · itb
High
PDF, High priority: read this first193 pages · ifb
High

Read all 5 documents

Due in 46 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 46 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 5 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Glendale City
Contacts1 person available
OfficeN/A

Full Description

Show more
Bid #3874: Contractor shall furnish labor, materials, equipment, services, and specialized skills to perform work involved in the Project. The Work included in the Bid is defined in accordance with Specification No. 3874. The work generally includes the materials needed and steps for the synthetic turf replacement and drainage improvements, but not necessarily limited to, the following: removal and replacement of synthetic with new synthetic turf, infill and shock pad, precise grading of existing base material and new drainage improvements

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation number SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, and the modification of sluice and slide gates. Additionally, the project encompasses the installation of platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying of reactor areas. The estimated contract value for this project ranges between 18.5 million and 19.5 million dollars. This solicitation is designated as a Small Business set-aside, including SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. The bid opening is scheduled for December 2, 2026. Ranger Pipelines Incorporated is seeking quotes from certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, lining, concrete rehabilitation, and welding. All subcontractors must comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

about 1 hour ago

DEADLINE

in 9 days
View Details

More opportunities from California → Glendale City

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS