Goleta Water District - San Antonio Blow Off Abandonment

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Goleta Water District is initiating the San Antonio Blow Off Abandonment project in Santa Barbara County, California. The project involves the removal of two existing blow-off valves along San Antonio Creek and the secure capping of the associated pipeline. These valves became exposed during the February 2024 storms, creating a risk of uncontrolled water release and potential damage from flooding or falling trees. The primary objectives are to decommission the outdated infrastructure, protect regional water storage, and eliminate environmental and safety hazards. The project is classified as a forecast under NAICS code 237120 and is categorically exempt under CEQA Article 19, Section 15302(c), as it involves the replacement of existing utility systems without expanding capacity. Key personnel include General Manager David Matson and Engineering and Infrastructure Manager Daniel Brooks. While the project is located at specific coordinates along San Antonio Creek, the documentation does not specify a contract value, formal delivery schedule, or specific evaluation criteria for award.

General Info

Goleta Water District to remove and cap damaged blow-off valves along San Antonio Creek without capacity expansion.

Agency

California → Goleta Water District

NAICS

237120 - Oil and Gas Pipeline and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

NOE - San Antonio Blow Off Abandonment - Goleta Water District

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Goleta Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Goleta Water District
Office AddressN/A
Contacts
Daniel BrooksEngineering & Infrastructure Manager

Full Description

Show more
Goleta Water District (District) owns and operates a two blow-off valves located along San Antonio Creek. The proposed work involves removing the existing blow-off valves and capping the pipeline, which became exposed during the February 2024 storms. If left unaddressed, the exposed valve is vulnerable to damage from potential flooding or falling trees, which could result in the uncontrolled release of water and negatively impact water storage and the surrounding environment.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
Federal
Fuel Tank Removal and Replacement, Colebrook River Lake, Colebrook, CT
Solicitation # W912WJ26QA164
The U.S. Army Corps of Engineers New England District is soliciting quotes for the removal and replacement of fuel storage equipment at the Colebrook River Lake gatehouse in Colebrook, Connecticut. The project involves removing a 600-gallon fuel tank, a 10-gallon day tank, a fuel transfer pump, and associated supply lines. These will be replaced with two 275-gallon double-walled insulated fuel tanks, a new 10-gallon day tank, a fuel transfer pump, and all necessary piping, gauges, and grounding systems. The scope includes installing new fuel supply and return lines to the furnace and generator, followed by a 30-minute operational test of both systems to ensure proper fuel flow. This small business set-aside procurement under NAICS code 237120 has an estimated value of less than $25,000 and a performance period of 120 calendar days. All work must adhere to USACE Safety and Occupational Health Requirements (EM 385-1-1), NFPA 780, and API 2003 and 651 standards. Qualified personnel, including Master or Journeyman Electricians and certified crane operators, are required. The government will award a firm-fixed-price purchase order based on a comparative evaluation of technical capability, past performance, and price. Vendors must maintain an active SAM.gov registration to be considered responsive, and the final response deadline is September 22, 2026.
W2SD Endist New England

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 237120
New
Federal
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Solicitation # W912HV26RA009
Solicitation W912HV26RA009, managed by the USACE Japan Engineer District, is for the DESC2103C Bulk Fuel Storage Tanks Phase II project at Yokota Air Base, Japan. The project involves the construction of a 100,000-barrel cut-and-cover JP-8 storage tank, a reinforced concrete pump house featuring vertical turbine pumps, and an access tunnel. The scope includes installing an automatic tank gauging system, a product saver tank, and establishing critical piping and control system connections to an existing filter separator building. The estimated magnitude of the project is between 7.5 and 15 billion Yen, with a performance period of 1,020 calendar days from the notice to proceed. This solicitation is restricted to local sources in Japan. The contract will be awarded based on the Lowest Price Technically Acceptable process, requiring offerors to be rated as acceptable across three factors: construction experience, system supplier subcontractor experience, and past performance. Specifically, prime contractors must demonstrate experience with at least one fuel facility project valued at 1 billion JPY or more completed within the last 20 years, while system suppliers must show experience on at least five projects completed within the last five years. Proposals are due by January 25, 2027. Key contractual terms include liquidated damages of 615,000 Yen per day of delay, a DO-C2 priority rating, and the requirement to follow EM 385-1-1 safety procedures. Required submissions include a Contractor Quality Control Plan, an Accident Prevention Plan, and an Environmental Protection Plan within specified timeframes following the notice to proceed.
W2SN Endist Japan

POSTED

3 days ago

DEADLINE

in 4 months
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS