Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on January 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

GRADING PR 374 PR 373 TO 14.0 KM EAST OF PR 373

Closed
7674International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including SWPPP and quality control. Kiewit is specifically seeking qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Furthermore, Kiewit prioritizes bidders who can demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid through the Building Connected electronic system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
RFB-PARKS-MISSISSIPPI RIVER BLVD RETAINING WALLS REBID
Solicitation # 1777
The City of Saint Paul Parks Department is soliciting bids for the Mississippi River Blvd Trail Improvement Project, which involves the removal and reconstruction of retaining walls, trails, and fencing near Princeton Avenue. The scope of work includes the removal of existing Loffelstein walls and bituminous walks, the installation of soldier pile walls with galvanized steel bridge plank lagging, and the paving of a new bituminous trail. The base bid must include an ADA trail transition to connect to the existing trail. Key deliverables include site protection, erosion control, and the installation of concrete pile caps and structural backfill. The contract will be awarded to the lowest responsible base bidder based on an evaluation of their experience, financial resources, and technical capabilities. Bidders must submit their responses via the City of Saint Paul Supplier Portal by December 9, 2026, using the required Excel bid form. Mandatory compliance requirements include adhering to the City of Saint Paul Little Davis-Bacon prevailing wage standards and Affirmative Action/Equal Employment Opportunity specifications. Upon award, the successful contractor must provide performance and payment bonds, certificates of insurance, and human rights compliance documentation. The work is subject to a one-year guarantee from the date of substantial completion.
City of Saint Paul

POSTED

about 12 hours ago

DEADLINE

in 28 days
NAICS: 237310
New
SLED
RFB-PW-SAINT ANTHONY MILL&VERLAY 2026
Solicitation # 1785
The City of Saint Paul Parks Department is soliciting bids for the 2026 Saint Anthony Mill and Overlay project, located along Saint Anthony Avenue and Rondo Avenue between Snelling Avenue and Marion Street. The scope of work focuses on pavement resurfacing via a standard 2-inch mill and overlay, as well as significant pedestrian and safety enhancements. Key deliverables include the construction of curb extensions, ADA-compliant pedestrian ramps, concrete curb replacement, storm sewer installation, and the paving of off-street bike paths. All work must adhere to the City of Saint Paul Department of Public Works governing specifications and the 2026 MnDOT Schedule of Materials Control. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit all documentation through the City of Saint Paul Supplier Portal by December 7, 2026, at 2:00 PM CST. Required financial protections include a performance bond and a payment bond, each equal to 100% of the contract amount, and general liability insurance with a $1,500,000 per occurrence limit. The project is subject to the Little Davis-Bacon Ordinance regarding prevailing wages and includes a Vendor Outreach Program to encourage the participation of local small, woman-owned, and minority-owned businesses. Contractors must also provide a signed statement under oath verifying compliance with minimum criteria per Minnesota Statutes.
City of Saint Paul

POSTED

about 12 hours ago

DEADLINE

in 26 days

AI Contract Overview

Show more

This contract involves extensive construction work on Provincial Road 374, covering a distance of 14.0 kilometers from Provincial Road 373 eastward, in an unorganized territory. The project scope includes embankment construction with a new alignment, replacement and installation of multiple culverts of various sizes, drainage improvements, extensive excavation including solid rock and composite types, and granular base course placement. Key activities also encompass the removal of existing metal pipe culverts, installation of high-density polyethylene pipes, jacking of steel casing culverts at different diameters, and placement of erosion control materials such as non-woven geotextile and erosion control blankets, along with seeding and drainage rock checks. The contract outlines significant quantities of materials and equipment use, including over 4000 cubic meters of culvert gravel, 430,000 cubic meters of composite excavation, 36,000 cubic meters of controlled solid rock excavation, and nearly 160,000 metric tonnes of crushed rock material for the base course. Traffic control provisions, including level IV controls and detours, are specified to manage work zone safety and maintain traffic flow. Equipment mobilization, trenching, dust control, and site management with a supplied field office are accounted for, along with provisions for delay time due to obstruction removal. The project is managed by Manitoba Transportation and Infrastructure, with a deadline for bid submissions in mid-February 2026.

General Info

Construction on 14 km of Provincial Road 374 including embankments, culverts, drainage, and rock excavation.

Agency

Government of Canada → Manitoba Transportation and Infrastructure - Tendering and Contracts

Place of Performance

CAN

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Manitoba Transportation and Infrastructure - Tendering and Contracts
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Manitoba Transportation and Infrastructure - Tendering and Contracts
Office AddressN/A
Contacts
Allison SaniukContracting Authority

Full Description

Show more
Construction of embankment on PR 374 (including new alignment), culvert replacements, drainage improvements, solid rock excavation, composite excavation and granular base course on Provincial Road 374, from Provincial Road 373 to 14.0km east of PR 373, for a total construction distance of 14.0km in Unorganized Territory. code : 100description : Mobilization of Equipmentquantity : 1unitOfMeasure : Lump-Sumcode : 104description : Traffic Control Level IVquantity : 1unitOfMeasure : Lump-Sumcode : 653description : Traffic Control, Shoo-Fly Detourquantity : 9unitOfMeasure : Eachcode : 130description : Remove Metal Pipe Culvertsquantity : 246unitOfMeasure : Metercode : 127description : Placing High Density Poly Pipe, 600mmquantity : 120unitOfMeasure : Metercode : 136description : Placing Culverts Group "B" (CMP)quantity : 291unitOfMeasure : Metercode : 137description : Placing Culverts Group "C" (CMP)quantity : 190unitOfMeasure : Metercode : 147description : Culvert Gravelquantity : 4155unitOfMeasure : Cubic Metercode : 168description : Composite Excavationquantity : 430000unitOfMeasure : Cubic Metercode : 176description : Solid Rock Excavation (Controlled)quantity : 36000unitOfMeasure : Cubic Metercode : 171description : Loose Rock Disposalquantity : 100unitOfMeasure : Cubic Metercode : 161description : Bench Cutsquantity : 128unitOfMeasure : Stationcode : 2017description : CR-M100quantity : 158500unitOfMeasure : Metric Ton/Tonnecode : 2012description : GBC-Mquantity : 86900unitOfMeasure : Metric Ton/Tonnecode : 172description : Waste Excavationquantity : 5980unitOfMeasure : Cubic Metercode : 270description : Granular Fillquantity : 14370unitOfMeasure : Cubic Metercode : 692description : Rock Checksquantity : 22unitOfMeasure : Eachcode : 213description : Stone Rip Rap, Class 350 mmquantity : 3000unitOfMeasure : Cubic Metercode : 3117description : Geotextile Non-Wovenquantity : 163320unitOfMeasure : Square Metercode : 1015description : Supply and Place Erosion Control Blanketquantity : 5500unitOfMeasure : Square Metercode : 607description : Filling Existing Culvertquantity : 7unitOfMeasure : Eachcode : 1467description : Jacking Steel Casing Culverts 1500mmquantity : 44unitOfMeasure : Metercode : 1466description : Jacking Steel Casing Culverts 1800mmquantity : 65unitOfMeasure : Metercode : 1148description : Delay Time for Obstruction Removalquantity : 300unitOfMeasure : Hourcode : 982description : Hydraulic Excavator (Group 9)quantity : 100unitOfMeasure : Hourcode : 982description : Hydraulic Excavator (Group 13)quantity : 50unitOfMeasure : Hourcode : 610description : Crawler Tractor and Dozer Min Group (6 LGP)quantity : 300unitOfMeasure : Hourcode : 838description : Dust Controlquantity : 200unitOfMeasure : Hourcode : 522description : Seedingquantity : 30unitOfMeasure : Hectarecode : 403description : Supply of Field Office Class "B"quantity : 1unitOfMeasure : Lump-Sumcode : 954description : Trimmingquantity : 135unitOfMeasure : Stationcode : 1393description : Jacking Steel Casing Culverts 900mmquantity : 76unitOfMeasure : Metercode : 1394description : Jacking Steel Casing Culverts 1200mmquantity : 98unitOfMeasure : MeterBidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS