Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on June 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Grand Prairie Pump Station Inlet Channel

Closed
W912EQ25RA004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 20 days

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

De Valls Bluff, AR, USA

Set-Aside

8A

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist Memphis
Contacts2 people available
OfficeMEMPHIS, TN, 38103-1894, USA
Office AddressMEMPHIS, TN, 38103-1894, USA

Full Description

Show more
Notice of Intent to Award a Sole Source Contract to Ozark Dumey JV, LLC. Notice of Intent to Award an 8(a) Sole Source Procurement to Ozark Dumey JV, LLC.This is a notice of intent of the U.S. Army Corps of Engineers, Memphis District, Contracting Branch to negotiate a sole source award with Ozark Dumey JV, LLC., 3067 South Westwood Blvd., Poplar Bluff, Missouri, 63901.This contract action was accomplished using other than competitive procedures, because a statute exists that expressly authorizes or requires that this acquisition be made from a specific source or through another agency; specifically, FAR 6.302-5(b)(4) for sole source awards under the 8(a) program 15 U.S.C.637(a) and in accordance with 13 CFR 124.1-1(c) and FAR 19.8. The work consists of completing the inlet channel serving the pump station from the White River, which will allow for delivery of water to landowners. The inlet channel is approximately 1,825 long with a 104-foot bottom width. The project will consist of (but not be limited to) excavation to establish channel grade and section, removal and placement of spoil, pertinent erosion control measures, etc. Remaining excavation depths necessary for the inlet channel are 5-15. Excavation activities may be dictated by river stages.3. The intended period of performance is 230 days from time of notice to proceed. The proposed action will result in a firm-fixed price contract.The North American Industrial Classification System (NAICS) Code is 237110 (Water and Sewer Line and Related Structures Construction), with a Small Business size standard of $45M. The estimated value of this project is between $1M and $5M. This Notice of Intent is posted for informational purposes only and is not a request for competitive proposals. Interested firms must identify their interest and provide documentation demonstrating their capability (include detailed technical information and other technical literature) demonstrating ability to meet the above requirements, by emailing Ozark Dumey JV, LLC. point of contact Leo Acevedo at leo@ozarkconstructors.com. A determination by the Government not to compete this requirement is solely within the discretion of the Government. No requests for capability briefings will be honored as a result of this notice.

More opportunities from Department Of Defense → W07V Endist Memphis

Same awarding agency

NAICS: 237990
Federal
Belle Fountain Ditch Cleanout Phase 2
Solicitation # W912EQ26BA002
Solicitation W912EQ26BA002 is a firm-fixed-price contract issued by the US Army Corps of Engineers, Memphis District, for the Belle Fountain Ditch Cleanout Phase 2 project in Pemiscot County, Missouri. The scope of work involves providing all plant, labor, and materials for channel cleanout, including clearing, snagging, and tree removal within the Bypass of Steele and Main Ditch. The project limits extend from the confluence of New Franklin Ditch and Bypass of Steele, heading north through Main Ditch, and ending approximately 100 feet before the intersection of Main Ditch and County Rd. 442, roughly 2.5 miles south of Braggadocio. The estimated value of the work is between 1 million and 5 million dollars. This procurement is set aside exclusively for Service-Disabled Veteran Owned Small Businesses (SDVOSB) under NAICS code 237990. Bidders must submit their responses by October 27, 2026, and must have a National Institute of Standards and Technology score entered in the Supplier Performance Risk System to be considered responsive. Key requirements include the submission of a Contractor Quality Control Plan, a Storm Water Pollution Prevention Plan, and specific bonds, including a bid bond for offers exceeding 150,000 dollars and performance and payment bonds equal to 100 percent of the contract price. Award is based on a multi-step evaluation of responsiveness, conformance, financial resources, and past performance.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS