Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Grant Lake Outlet Valve Replacement Geotechnical Survey (Notification of Lake or Streambed Alteration, No. EPIMS-MOO-66741-R6)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has authorized the Los Angeles Department of Water and Power to conduct geotechnical surveys at 14 locations near Grant Lake under Lake and Streambed Alteration Agreement EPIMS-MOO-66741-R6, in compliance with Section 1602 of the Fish and Game Code. The work involves sonic drilling to a maximum depth of 110 feet across all sites, with three of the borings directly impacting the lake or its shoreline below the high-water mark. Two of these will be conducted from a barge or watercraft within the lake itself, while the third may be performed on the shoreline depending on seasonal water levels. Each borehole is confined to an impact area of no more than two square feet and will be meticulously backfilled using bentonite chips slowly introduced through the 6-inch casing to minimize environmental disturbance. The project requires specialized equipment including a crane, sonic drilling rig, 10-wheel truck, support vehicles, forklift, equipment trailer, and watercraft. The activity is part of preparatory work for the Grant Lake Outlet Valve Replacement project, with geotechnical data collected to inform future infrastructure design. All fieldwork is subject to conditions designed to protect aquatic resources, and operations will be executed to avoid unnecessary disruption to the lakebed and surrounding habitat. The authorization is issued by Region 6 of the California Department of Fish and Wildlife, and project coordination is managed through designated contacts at both LADWP and CDFW. No public solicitation or set-aside classifications are associated with this agreement, as it is a regulatory authorization for a specific technical survey rather than a procurement. The notification was posted on August 7, 2026, and is accessible through the CEQA Net portal.

General Info

LADWP to conduct sonic drilling up to 110 feet at 14 sites near Grant Lake for geotechnical data.

Agency

California → Fish and Wildlife, Region 6 - Inland Deserts, Ontario

NAICS

541360 - Geophysical Surveying and Mapping ServicesView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

EPIMS-MOO-66741-R6_NOE

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 6 - Inland Deserts, Ontario
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 6 - Inland Deserts, Ontario
Office AddressN/A
Contacts
David LivingstonWatershed Resources Supervisor
Cooper WallSenior Environmental Scientist (Specialist)

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-MOO-66741-R6, pursuant to Section 1602 of the Fish and Game Code to Los Angeles Department of Water and Power. The Project is limited to geotechnical surveys at 14 locations. All 14 geotechnical survey locations will utilize sonic drilling methods and reach a total of 110 feet in length. Of the 14 sonic borings, three will impact the lake or shoreline below the high-water mark of Grant Lake. Two borings (GLVRP-25-SO-06 and GLVRP-25-SO-07) will be drilled within Grant Lake using a barge or other watercraft. The shoreline boring (GLVRP-25-SO-05) will depend on water level at the time of work. Each boring is expected to impact no more than 2 square feet. Each boring will be backfilled by slowly adding bentonite chips through the water column within the 6-inch casing. Project equipment includes, but is not limited to, a crane, sonic rig, 10-wheel box truck, support truck, forklift, equipment trailer, barge or other watercraft, and vehicles.

Similar Contracts

Same NAICS industry code

NAICS: 541360
New
SLED
GIS Integration for Environmental Law EnforcementThis contract involves the integration of Geographic Information Systems (GIS) with Records Management System (RMS) and Computer-Aided Dispatch (CAD) technologies to enhance environmental law enforcement capabilities in Massachusetts. The project focuses on enabling advanced environmental mapping, geofencing, spatial analytics, and incident heat mapping to support the protection and monitoring of conservation and wildlife areas. These tools will improve situational awareness, resource allocation, and response efficiency for enforcement personnel operating in sensitive natural environments by translating real-time data into actionable spatial insights. The system must be designed to handle complex environmental data sets and provide accurate, timely visualizations that aid in detecting patterns of illegal activity such as poaching, unauthorized land use, or pollution events. The contract is classified as a subcontract under NAICS code 541360, which corresponds to other scientific and technical consulting services. It was posted on August 7, 2026, with a response deadline of September 4, 2026, and the place of performance is specified as Boston, Massachusetts, with a zip code of 02114. The initiative is under the jurisdiction of the Executive Office Groups, specifically the Massachusetts agency, and aims to modernize environmental enforcement operations through technologically driven spatial intelligence. While details about the point of contact or set-aside status are not provided, the focus is squarely on delivering a robust, interoperable platform that bridges data systems to improve outcomes in ecological preservation and compliance enforcement.
ENV - Executive Office Groups

POSTED

1 day ago

DEADLINE

in 28 days
View Details
NAICS: 541360
New
International
Multi-year Rental of an Autonomous Underwater Vehicle (AUV)
Solicitation # RNCan-5000095073
The Department of Natural Resources Canada, through the Geological Survey of Canada – Atlantic, intends to lease a deep-water autonomous underwater vehicle (AUV) system, specifically a HUGIN 1000 or equivalent, on an annual basis for up to five years to support marine scientific research including seafloor mapping, oceanographic studies, Arctic collaborations, and activities related to the Facility for Intelligent Marine Systems. The AUV must be capable of operating at depths of at least 2,000 metres, equipped with integrated inertial navigation, Doppler velocity log, and acoustic positioning, and carry a full scientific sensor payload including multibeam echosounder, sidescan sonar, and sub-bottom profiler. The lease includes a climate-controlled 20-foot ISO container for storage and transport, technical documentation, mission planning software, and ongoing remote technical support. The supplier must maintain comprehensive insurance for the AUV and container throughout the lease and ensure system readiness at the start of each year. Université Laval, through Amundsen Science, is the pre-identified supplier, as it is the only known entity that meets all mandatory technical and operational requirements. The contract, valued at $800,000 including options, runs from award until March 31, 2027, with four possible one-year renewals. This procurement follows limited tendering procedures under multiple international trade agreements, justified by the sole-source nature of the requirement. Suppliers may submit a statement of capabilities demonstrating compliance with the specified technical criteria by August 21, 2026; if any submission meets or exceeds the requirements, a competitive process will be initiated. Ownership of any intellectual property generated under the contract will remain with the Government of Canada, reflecting the public knowledge dissemination objective. All inquiries and submissions must be directed to Alexandre Rheault of Natural Resources Canada.
Department of Natural Resources (NRCan)

POSTED

2 days ago

DEADLINE

in 14 days
View Details
NAICS: 541360
New
SLED
Village 7 Specific Plan ProjectThe proposed project seeks to amend the Village 7 and Village 5 Specific Plans in the City of Lincoln to significantly increase residential density across both areas. Within Village 7, the number of allocated residential units would rise from 570 to 1,205, while Village 5 would see an increase from seven to 30 units. A new land use designation, Village Medium-High Density Residential (VMHDR), would be introduced over 41.1 acres in Village 7, permitting residential densities between 6.0 and 18.0 dwelling units per acre to allow for flexible, higher-density development. The project also includes minor adjustments to a 49.5-acre area south of Moore Road within Village 7, which would reconfigure existing residential land uses to yield a slight net increase in total units. All changes are designed to align with the City of Lincoln General Plan and support growth consistent with regional housing goals. The amendment request is part of an ongoing planning effort to accommodate increased housing needs through strategic land use revisions. The project is being managed by the City of Lincoln, with primary contact information provided through Mikaela Noble, Associate Planner, and Phil Rodriguez, Vice President at LewisMc. The initiative is currently in the forecast stage as of August 5, 2026, with public documentation and environmental review accessible under State Clearinghouse number 2005062001. No bidding or procurement activity is indicated, as this is a land use planning amendment rather than a construction or service contract.
City of Lincoln

POSTED

3 days ago

DEADLINE

N/A
View Details
NAICS: 541360
New
SLED
Ferndale Access Project, 01-0N330The geotechnical investigation aims to support the rehabilitation or repair of Fernbridge on State Route 211 in Humboldt County by collecting critical subsurface data to inform future design alternatives. The project involves drilling seven boreholes to determine bedrock depth, soil composition, and other geologic conditions necessary for structural planning, with two of these boreholes located on the Eel River’s gravel bar outside the wetted channel. Each of the two riverbed borings is expected to reach a maximum depth of 300 feet and have a diameter of approximately 6 inches, resulting in a minimal temporary footprint of about 150 square feet per hole. The work is designed to avoid disruption to the active river channel and will focus on gathering high-resolution geotechnical data to ensure safe and sustainable bridge design. The project falls under the Ferndale Access Project and is managed by California’s Fish and Wildlife, Region 1, with primary contact Greg O’Connell, Environmental Scientist, and secondary contact Jeff Pimentel from Caltrans. The initiative was posted on August 5, 2026, as a forecast notice to prepare stakeholders for upcoming procurement. While no solicitation number or NAICS code is provided yet, the location of performance is specified as Ferndale, California, and the activity is part of broader infrastructure preservation efforts on a vital state transportation link. The data collected will directly influence engineering decisions, environmental compliance, and long-term resilience planning for Fernbridge.
Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

POSTED

3 days ago

DEADLINE

N/A
View Details