Grassed Infiltration Basin Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 10 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 11 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The contract calls for the design and construction of a grassed infiltration basin at Arnold Park in Abington, Massachusetts, with the goal of managing stormwater runoff by facilitating natural percolation into the soil. This infrastructure project is intended to enhance local water quality and reduce surface flooding by capturing and slowly absorbing runoff through engineered vegetation and soil layers. The work will include site preparation, grading, installation of permeable media, planting of native grasses, and other related activities necessary to ensure the basin functions effectively as a sustainable stormwater solution. The contract is categorized as a subcontract under NAICS code 237990, which covers other heavy and civil engineering construction, and is issued by the Town of Abington under the agency name ABGTN. The solicitation was posted on July 21, 2026, with a response deadline set for August 20, 2026, at 3:00 PM. The place of performance is specifically located at Gliniewicz Way, Abington, with a ZIP code of 02351. While no point of contact or set-aside details are provided, the project is positioned as part of broader municipal efforts to implement green infrastructure for environmental stewardship and regulatory compliance in stormwater management.

General Info

Design and construct grassed infiltration basin at Arnold Park, Abington, for stormwater management via natural percolation.

Place of Performance

Gliniewicz Way Abington, MA, 02351, USA

Set-Aside

NONE

Documents

This scope was carved out of BD-27-1472-ABGTN-ABGTN-131558.

The full solicitation package (31 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Stormwater BMP

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → ABGTN - Town of Abington
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design and construction of a grassed infiltration basin at Arnold Park to manage stormwater runoff through natural percolation into the ground.

More opportunities from Massachusetts → ABGTN - Town of Abington

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS