Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

2026-15 LAS Culvert Replacement. Phase 2

Active
PE-70750-NONST-2027-000000076State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Separate sealed bids are required for the LAS Culvert Replacement, Phase 2 project in the City of Covington, with submissions due by 10:00 a.m. on Tuesday, August 25, 2026, at Covington City Hall, 2194 Emory Street NW. Bids will be publicly opened and read aloud at 10:30 a.m. the same day at 2116 Stallings Street NW. The contract encompasses the complete removal of existing corrugated metal pipe culverts, excavation, and installation of new 36-inch Class III reinforced concrete pipe, along with associated headwalls, a gravel access drive, and all necessary grading, erosion and sedimentation controls, and site restoration. Bidders must provide all labor, materials, tools, equipment, safety gear, permits, taxes, overhead, and profit required for full compliance with project specifications. The solicitation number is PE-70750-NONST-2027-000000076, and the primary point of contact is William Jones, reachable at 706-765-8767 or william.jones@gwesllc.com.

General Info

Bids due August 25, 2026, for culvert replacement with concrete pipe, headwalls, and site restoration in Covington.

Agency

Georgia → City of CovingtonView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(2)

las service rd culvert replacement phase 2_sp.pdf

PDF

las service rd culvert replacement phase 2_pl.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → City of Covington
Contacts1 person available
OfficeN/A
Organization / Agency
Georgia → City of Covington
View Agency Profile
Office AddressN/A

Full Description

Show more
Separate sealed Bids for construction of LAS Culvert Replacement, Phase 2 for the City of Covington Project No. 2025-18 will be received until 10:00 a.m. on Tuesday, August 25, 2026, at 10:00 a.m. at Covington City Hall, 2194 Emory Street NW, Covington, GA 30014. Bids will then be publicly opened and read aloud at 10:30 a.m., at 2116 Stallings Street NW. The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, and other costs and effort required to complete the following:
Work includes removal of the existing CMP culverts, excavation, installation of new 36-inch Class III RCP, construction of associated 36-inch RCP headwalls, installation of a gravel access drive, and all required grading, erosion and sedimentation control measures, and restoration necessary to complete the culvert replacement.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a comprehensive series of airfield infrastructure upgrades at the Port of Seattle, focusing on modernization and safety improvements across multiple critical systems. Key components include replacing aging airfield lighting circuits that exhibit low megger readings with new LED lighting fixtures and signs to enhance visibility and energy efficiency. Concurrently, failing pavement sections and essential utilities will be replaced to ensure structural integrity and operational reliability of airfield surfaces and underlying systems. Wildlife hazard mitigation measures will be implemented by removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signage to deter bird activity, and addressing ponding issues through regrading and the installation of new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure unimpeded access for emergency response personnel. The project is categorized under NAICS code 237990 and is forecasted under the title AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) Combined, coordinated by the Aviation Project Management Group within the Port of Seattle. The solicitation was posted on July 22, 2026, with Yanet Maldonado listed as the primary point of contact for inquiries, reachable via phone or email. All work is slated to occur on airfield property under the Port’s jurisdiction, though specific location details are not provided. The project aims to enhance safety, compliance, and long-term operational resilience through integrated infrastructure renewal efforts.
Aviation Project Management Group

POSTED

about 5 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
C5613111-D, Rebid 1 Water Tank MaintenanceThe Contractor is engaged under a Master Agreement to provide comprehensive water tank cleaning, maintenance, inspection, and repair services for the California Department of Corrections and Rehabilitation at specified locations listed in Exhibit E. Compensation is based on the rates detailed in Exhibit B-1, Rate Sheet, which includes all costs necessary to perform the services such as labor, personnel, transportation, travel, per diem, fuel, mileage, materials, supplies, tools, equipment, permits, licenses, taxes, fees, and shipping or freight charges, unless otherwise stated. The agreement covers all expenses incurred in delivering the required services at CDCR facilities throughout California. The solicitation, identified as C5613111-D Rebid 1 Water Tank Maintenance with solicitation number 0000039841, was posted on July 21, 2026, and responses are due by September 9, 2026. The procurement falls under the SLED classification and is managed by the California Department of Corrections & Rehabilitation. Primary point of contact for inquiries is Kristina Lopez, reachable via email at kristina.lopez@cdcr.ca.gov. All work must be performed at locations designated in Exhibit E, and no additional charges are permitted beyond those outlined in the rate sheet unless explicitly allowed by the terms of the agreement.
California Department of Corrections & Rehabilitation

POSTED

about 15 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SLED
T32-D5-Drainage-Brantley/Charlton-190600The Georgia Department of Transportation is soliciting bids for Drainage Rehabilitation, Repair, Replacement & Miscellaneous Maintenance Services under Solicitation Number 48400-eRFQ-001841-2027, with a response deadline of August 11, 2026. Only contractors prequalified through the Master Service Agreement process #48400-410-000043083 are eligible to bid, and all respondents must adhere to the terms and conditions outlined in MSA 48400-410-000034480, the ITB/RFQ Form, and any additional provisions the Department may add. The work is targeted for Brantley and Charlton Counties in Georgia, and the Department retains full discretion to modify terms, reject any or all bids, and waive minor irregularities. Proposals must be submitted in strict compliance with instructions, and failure to follow requirements may result in disqualification. The solicitation is issued under statutory authority for ancillary services related to public road maintenance, and is managed through the Georgia DOT’s electronic procurement system. Interested parties must review the complete ITB/RFQ documentation available via the provided web link and direct questions to the designated point of contact, Samantha Jones, at samjones@dot.ga.gov or 912-424-9870. This procurement is limited to firms previously vetted and qualified under the Department’s routine maintenance prequalification program, ensuring a qualified pool of contractors capable of delivering timely and compliant drainage services across the state’s transportation infrastructure.
Department of Transportation

POSTED

about 15 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Georgia → City of Covington

Same awarding agency

NAICS: 238210
SLED
Electrical and Control Systems InstallationThe contract titled Electrical and Control Systems Installation involves the full scope of electrical and control system work for pump station operations, including the installation of control panels, wiring, sensors, and seamless integration with SCADA or monitoring systems. This subcontract is targeted at qualified vendors capable of delivering turnkey automated control solutions that ensure reliable, real-time operational oversight and performance of municipal water or wastewater pumping infrastructure. The work must comply with industry standards for electrical safety, data communication, and system redundancy to support continuous station functionality. Scheduled for an initial posting on June 29, 2026, with a response deadline of July 30, 2026, the opportunity falls under NAICS code 238210 for Electrical Wiring and Installation services and is issued by the City of Covington in Georgia. While the exact location of performance and point of contact details are unspecified, the contract requires proposers to demonstrate technical expertise in industrial automation, experience with municipal utility systems, and a proven ability to coordinate field installations with existing infrastructure. All submissions must be submitted via the State of Georgia’s procurement portal by the stated deadline to be considered.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

23 days ago

DEADLINE

in 8 days
View Details