Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Georgia was posted on August 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Gravity Sewer Installation & Trenchless Crossings

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key scope elements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, and new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is designated as a small business set-aside. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. Performance is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. The project timeline begins upon a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to meet substantial completion dates. Payments are processed monthly via applications for payment submitted to the Engineer, with a 30-day payment term following presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 15 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of open and covered concrete structures, including concrete resurfacing, restoration, and the installation of platforms and access improvements. Technical requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, the installation of valves and piping appurtenances, and the operation of a temporary 11 MGD pumped bypass. Additionally, the project encompasses the rehabilitation of reactor mixers and aerators, motor control center component replacement, modifications to sluice and slide gates, and various electrical and instrumentation improvements. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. Requested services and supplies include lead abatement, metals fabrication, painting and coatings, trucking and hauling, and FRP reinforcing systems. Any exceptions to the standard Garney Purchase Order and Subcontract documents must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

This subcontract for the City of Cumming, Georgia, involves the installation of gravity sanitary sewer lines and trenchless crossings. The scope of work includes the installation of 2,860 linear feet of PVC gravity sewer in 8-inch, 10-inch, and 12-inch diameters, along with the necessary manholes and fittings. Additionally, the contractor is responsible for performing trenchless crossings utilizing 18-inch steel casing and specialized boring equipment to deliver a fully installed and tested system. The project requires strict compliance with the Davis-Bacon Act and GEFA Supplemental General Conditions. Under NAICS code 237110, the response deadline for this opportunity is September 17, 2026.

General Info

Subcontract for installing gravity sewer lines and trenchless crossings in Cumming, Georgia.

Documents

This scope was carved out of Project No. 645.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Western Corridor Sanitary Sewer Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Cumming
ContactsNo contacts available
OfficeN/A
Organization / AgencyGeorgia → City of Cumming
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs gravity sanitary sewer lines for prime contractors on City of Cumming, GA utility projects. Installs 2,860 linear feet of 8-inch, 10-inch, and 12-inch PVC gravity sewer, manholes, and fittings. Performs trenchless crossings using 18-inch steel casing and boring equipment. Complies with Davis-Bacon Act and GEFA Supplemental General Conditions. Delivers installed and tested gravity sewer system and trenchless crossings.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS