This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on February 29, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

GREAT ONYX JC KENTUCKY LAGOON AERATION IMPROVEMENTS

Closed
12970224Q0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 8 hours ago

DEADLINE

in 20 days

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Mammoth Cave, KY, 42259, USA

Set-Aside

SBA

Documents

5

12970224Q0007 Amendment 0001 Q&A

PDF, High priority: read this first1 page · q-and-a
High

12970224Q0007 - Great Onyx JC Lagoon Aeration Project

PDF, High priority: read this first39 pages · rfp
High

General Decision Number KY20240099 - Kentucky Wage Determination

PDF, High priority: read this firstwage-determination
High

Great Onyx Job Corps Center - Lagoon Aeration Improvements SOW

PDF, High priority: read this first14 pages · sow
High

Great Onyx Job Corps Lagoon Aeration Improvements - Drawings

PDF, High priority: read this first5 pages · specifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Forest Service-Spoc Software
Contacts2 people available
OfficeWashington, DC, 20250, USA
Office AddressWashington, DC, 20250, USA
Contacts

Full Description

Show more
Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized as follows: 1. Furnish and install 480V, 3 PH, 30A feeder from existing panelboard to proposed aeration equipment disconnects. 2. Furnish and install 480V, 3PH, 30A disconnect, including grounding system, post, pipe bollards, and conduits. 3. Furnish and install microbubble lagoon aeration system consisting of the following: a. Control panel with individual motor overload protection circuit breakers. b. Self-contained floating microbubble aerators cord connected to control panel with tethers and anchors (4 each). 4. Locate private and utility owned buried electrical lines in the area of work and provide location on as-built plans with reference measurements to existing infrastructure. 5. Furnish third-party inspection of electrical work included in this contract. The project Schedule of Items includes a section to organize the work into Base Items. 1. Provide pricing for all items listed in the Schedule of Items. 2. Contract award will be made for all Base Items. 3. Optional Items may or may not be awarded, depending on fund availability. Base Items 1. Base Item No. 0001 - Lagoon Aeration a. Measurement: This item is measured as a Lump Sum quantity. 2. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to: a. Furnish and install 480V, 3 PH, 30A disconnect, including grounding system, post, pipe bollards, and conduits. b. Furnish and install 480V, 3PH, 30A disconnect, including grounding system, post, pipe bollards, and conduits. c. Furnish and install microbubble lagoon aeration system consisting of the following: 1. Control panel with individual motor overload protection circuit breakers. 2. Self-contained floating microbubble aerators cord connected to control panel with tethers and anchors (4 each) d. Locate private and utility owned buried electrical lines in the area of work and provide location on as-built plans with reference measurements to existing infrastructure. e. Furnish third-party inspection of electrical work included in this contract.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS