Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on October 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Green Cedar Rivers Trail South Interim Segment A

Closed
001525State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 17 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

This contract involves the enhancement of a shared use path extending from SE Kent Kangley Road to the Black Diamond Open Space in Maple Valley and unincorporated King County. The scope of work outlined in Schedule A encompasses approximately 1.7 miles of gravel trail construction, including site clearing, grubbing, erosion control, grading, traffic management, utility adjustments or relocations, curb and gutter installation, roadway striping, and landscape restoration. Additionally, it involves the installation of a pedestrian pre-fabricated bridge over the BNSF Railway and the relocation of an existing fire hydrant, as well as replacing signal equipment. Schedule B covers the replacement of approximately 154 linear feet of 12-inch water main for the Covington Water District. The project is valued between $2 million and $5 million, with a solicitation posted on October 29, 2025, and a response deadline of December 4, 2025. The contract is managed by King County, Washington, and is open to qualified contractors under NAICS code 238910. The primary point of contact for this project is Kelly McKeever, whose email is provided for inquiries. The contract aims to improve regional connectivity and infrastructure, supporting transportation and utility needs within the area.

General Info

Place of Performance

WA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → King County
Contacts1 person available
OfficeN/A
Organization / AgencyWashington → King County
Office AddressN/A
Contacts
Kelly McKeever

Full Description

Show more
This contract provides improvement of a shared use path, from SE Kent Kangley Road to the Black Diamond Open Space in Maple Valley and unincorporated King County. Schedule A includes construction of approximately 1.7 miles of gravel trail, clearing and grubbing, erosion control, site preparation, grading, traffic control, utility adjustments/relocation, curb and gutter, roadway channelization striping, relocation of an existing fire hydrant, signal equipment replacement, a pedestrian pre-fabricated bridge over the BNSF Railway, and landscape restoration. Schedule B includes approximately 154 LF of 12-inch water main replacement for Covington Water District.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS