This Solicitation opportunity from Alabama was posted on May 16, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Green Home - Kitchen Plumbing Repair
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves a plumbing installation project at William F. Green State Veterans Home in Bay Minette, Alabama, scheduled for a mandatory site visit on May 21, 2024. The work must be completed between 8 pm and 5 am to avoid disrupting kitchen operations. The scope includes installing supply lines for four faucets in the dietary area, specifically for three-compartment sinks, a cook's prep sink, and an ice machine island sink. Each installation requires dropping hot and cold water lines from the ceiling, installing ball valves both above the ceiling and at the fixture level, and securing the pipes with bracing towers to ensure safety and durability. The project emphasizes long runs of copper piping to minimize joints, and the contractor is responsible for including costs related to fabricating support towers. The contract, titled "Green Home - Kitchen Plumbing Repair," is posted under solicitation number SRC0000022175, with a response deadline of May 22, 2024. It is managed by the Alabama Department of General Services, with a contract value estimated between $5,000 and $15,000. The work is to be performed within the state of Alabama, and interested contractors can find additional details and respond through the provided online link. The project aims to ensure reliable water supply connections for essential kitchen fixtures while maintaining safety standards and minimizing operational disruptions.
General Info
Agency
Place of Performance
AL, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Cooks prep Island sink prep sink. Drop 1 hot and 1 cold to supply faucet in cooks prep sink. Install ball valves just above ceiling and at the fixture level. Water lines will drop from the ceiling.
To secure and protect pipes, install bracing tower from floor to above working height.
Install water shutoff valves and connect faucet. Install brackets above ceiling and on underside of table to secure lines.
Ice machine island sink. Install 1 hot and 1 cold line to supply water to ice machine island sink. Install ball valve above ceiling and at the fixture level. Install water shutoffs and connect faucet. To secure and protect pipes, install bracing tower from floor to above working height.
Job specs- long runs of copper to minimize joints, ball valves installed above ceiling and at fixture level.The contractor will include costs for machine/fabrication of support tower.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
