Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on July 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Groundwater Recharge Capacity Expansion Project Ferro Recharge

Closed
20260713027State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. Additionally, the project requires limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, as well as the planting of six native trees and approximately 345 native plants. The goal is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, these entities are encouraged to form consortiums if individual bid items are too large for a single firm to handle. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details and must provide a response indicating their intent to bid.
Harbel, Inc.

POSTED

about 10 hours ago

DEADLINE

in 4 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, alongside the excavation of cobbles and large boulders. This solicitation, posted on September 11, 2026, with a response deadline of September 29, 2026, is open to small businesses, including certified service-disabled veteran-owned, minority, and women-owned enterprises. The prime contractor, J.W. Fowler, is actively seeking subcontractor pricing and offering support to M/W/DBE firms regarding bonding, insurance, and equipment procurement to maximize participation.
James W. Fowler Co.

POSTED

about 10 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The project involves constructing two 60-inch reinforced concrete pipe (RGRCP) hydraulic connections to enhance groundwater recharge capacity between the Ferro and Noble infiltration basins in Oxnard, California, under the United Water Conservation District. Work will be executed using traditional open-cut trenching within the basins and microtunneling to cross under Caltrans Right-of-Way at Vineyard Avenue (SR 232). Additional deliverables include concrete inlet structures with slide gates and operators at the Noble Basin, a concrete discharge structure at the Ferro Basin, earthwork, dewatering, and tree removal. The project is governed by a detailed construction schedule with fixed dates spanning from July 2025 to April 2026, encompassing mobilization, tunneling, pipeline installation, structure construction, and punch list completion. All materials and equipment must be packaged, preserved, and labeled according to strict requirements designed to prevent damage from environmental exposure, corrosion, and mishandling during transit, with an emphasis on using recyclable materials and protecting sensitive electronics through desiccants and vapor corrosion inhibitors. Inspections and acceptance occur at the project site, with compliance verified against ASTM, SSPC, NACE, and ICC-ES standards, and the Contractor is fully responsible for quality control until formal acceptance by the Engineer. The contract requires strict adherence to special provisions governing site security, including visible employee identification badges, background checks for all personnel, a complete prohibition of weapons and explosives without written authorization, and robust security fencing. Insurance requirements mandate $2 million general liability, $1 million automobile and employer’s liability, and workers’ compensation coverage per state law. Contract document precedence is clearly established, placing regulatory permits and modifications above plans and specifications. Bids must be submitted in paper form by the deadline of August 17, 2026, to the District’s Oxnard office, with no electronic submission accepted for the formal bid, though supporting files may be provided in PDF, JPEG, or video formats under a 20 MB limit. The bid must include completed forms for proposal declaration, bid schedule, subcontractor listing, bid security, and a non-collusion declaration, with failure to submit any form rendering the bid nonresponsive. While no specific contract value is disclosed, pricing is structured around lump sum and unit-price line items, and all work must comply with applicable labor agreements and environmental regulations, including stormwater and erosion control plans. No standard FAR clauses are incorporated; instead, contractual obligations are derived from

General Info

Construct two 60-inch concrete pipes for stormwater conveyance between Oxnard basins using trenching and microtunneling.

Agency

California → United Water Conservation DistrictView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Oxnard, CA, 93036, USA

Set-Aside

NONE

Documents

(10)

SOCAL GAS DISTRIBUTION

PDFother

Agreement 26-03-8018 GRCEP Contract

PDFcontract-document

Q&A Document 2 for Groundwater Recharge Capacity Expansion Project

PDFq-and-a

Plan Holders List for Solicitation 1784313466252

PDFplanholders-list

2026-07-23_Pre-Bid_Meeting_Complete_Sign-In_Sheet_1785186828185.pdf

PDF

SCE_241314P_1784594252618.pdf

PDF

UWCD Groundwater Recharge Capacity Expansion Project Specification No. 26-03

PDFrfb

FRONTIER_AERIALS_1784594250973.pdf

PDFother

Q&A Document 3 for Groundwater Recharge Capacity Expansion Project

PDFq-and-a

Q&A Document for Groundwater Recharge Capacity Expansion Project

PDFq-and-a

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → United Water Conservation District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → United Water Conservation District
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Bid #26-03: The project involves constructing two 60-inch reinforced concrete pipe (RGRCP) hydraulic connections for stormwater conveyance between United Water Conservation District’s Ferro and Noble infiltration basins in Ventura County. The work includes installing the pipes using traditional open-cut trenching methods within the basins and microtunneling trenchless methods to cross under Caltrans Right-of-Way at Vineyard Ave (SR 232). The project also includes construction of concrete inlet structures with slide gates and operators at Noble Basin, a concrete discharge structure at Ferro Basin, earthwork, dewatering, and tree removal.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS