Group 5B Shade Shelters At 5 Sites
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Bid CC27-0310-52-00-00 is a solicitation by the San Diego Unified School District for the installation of pre-engineered, free-standing tension fabric shade structures at Angier, Fletcher, Green, Juarez, and Ross elementary schools. The scope of work encompasses the delivery of steel tube structural systems with protective post padding, as well as selective demolition, concrete and asphalt paving, and the installation of chain link gates. All work must adhere to Division of the State Architect regulations and applicable building codes. Prime contractors are required to conduct mandatory site visits at Ross and Fletcher Elementary Schools. To minimize disruption to students, work hours are generally restricted to 3 PM to 11 PM during the school year, with more flexibility on non-instructional days. This project is subject to a Project Stabilization Agreement and includes a 3 percent participation goal for Disabled Veteran Businesses. Responses are due by October 1, 2026.
General Info
Agency
NAICS
Place of Performance
San Diego, CA, 92111, USASet-Aside
Documents
(3)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
