Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on May 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

GRUNDY SEAWALL IMPROVEMENTS

Closed
The Grundy Foundation, Bucks CountyState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 12 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 13 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

This contract, titled GRUNDY SEAWALL IMPROVEMENTS, involves site preparation and protective coating work on a bulkhead extending from Station 0+00 to 2+68 in Bucks County, Pennsylvania. The scope requires cleaning and preparing existing steel sheet piles to an SSPC-SP10 standard, repairing any identified damage, and applying a carboline splash zone coating to ensure long-term durability against environmental exposure. All work must be performed in strict compliance with applicable federal, state, and local codes, including adherence to the Solid Waste Disposal Act for hazardous material handling and full implementation of HUD’s Section 3 requirements due to federal funding involvement. The award is contingent upon successful completion of the environmental review process under 24 CFR Part 58 and the receipt of a fully executed Authority to Use Grant Funds (HUD-7015.16), with no contract execution permitted prior to this approval. Compliance with the Davis-Bacon Act is mandatory, requiring payment of prevailing wages and submission of certified payroll records, while additional federal mandates such as the Anti-Lobbying Amendment, False Claims Act, and Non-Collusion Affidavit must be certified by the contractor. Bidders must demonstrate financial responsibility, avoid prior public contract defaults within five years, and ensure that at least 25% of labor hours are performed by Section 3 workers, with a minimum of 5% by targeted workers, including low-income residents and HUD-assisted households. Submittals including shop drawings, product data, and a preliminary progress schedule are required, and inspections occur at the worksite with the contractor bearing all associated costs. The contract operates under a trade-off evaluation model, allowing the owner to select the bid best serving project interests rather than strictly the lowest price, and does not follow federal acquisition regulation clause formats but instead references industry-standard construction contract mechanisms. All materials must be stored and transported under appropriate conditions to prevent damage, with labels and seals maintained intact, though no specific barcoding or military standards are mandated. Submission of bids must occur via the designated portal by June 12, 2026, with no formal contract value provided, and payment processes relying on monthly applications for payment supported by lien waivers and payroll certifications.

General Info

Grundy Seawall project in Bucks County, PA, with HUD-funded CDBG, requires SSPC-SP10 prep, Carboline coating, and strict federal compliance.

Place of Performance

Bucks County, PA, USA

Set-Aside

NONE

Documents

79

2026.02.27 Seawall Improvements Bid Plans - General Notes

PDF, High priority: read this firstspecifications
High

Addendum #1 - Bidder Qualification Statement for Grundy Seawall Repairs

PDF, High priority: read this firstbidder-qualification-statement
High

Addendum #1 - Bidder's Acknowledgement Form for Grundy Foundation Seawall Improvements

PDF, High priority: read this firstbidder-acknowledgement-form
High

Addendum #1 - Contract Language Requirements

PDF, High priority: read this firstamendment
High

Addendum #1 - Worker Protection and Nondiscrimination Certifications

PDF, High priority: read this firstamendment
High

Addendum #2 - Agreement of Surety Company for Grundy Seawall Improvements

PDF, High priority: read this firstagreement-of-surety-company
High

Addendum #2 - Appendix A - Davis Bacon Wage Rates

PDF, High priority: read this firstwage-determination
High

Addendum #2 - Appendix A - Davis Bacon Wage Rates - Non-Collusion Affidavit

PDF, High priority: read this firstwage-determination
High

Agreement for Bulkhead Cleaning and Recoating - Grundy Foundation

PDF, High priority: read this firstcontract-document
High

Bid Bond Document 00 43 13

PDF, High priority: read this firstbid-bond
High

Bid Bond for Seawall Improvements Project

PDF, High priority: read this firstbid-bond
High

Bidder Acknowledgement Form - Grundy Foundation Seawall Improvements 2025-01251

PDF, High priority: read this firstbidder-acknowledgement-form
High

Bidder Qualification Statement for Contract 2025-01251 Grundy Seawall Repairs

PDF, High priority: read this firstbidder-qualification-statement
High

Bidder Qualification Statement - Worker Protection and Compliance

PDF, High priority: read this firstbidder-qualification-statement
High

Bid Form Document 00 41 00

PDF, High priority: read this firstbid-form
High

Construction Facilities and Temporary Controls Section 01 50 00

PDF, High priority: read this firstspecifications
High

Contract #25-01251 Grundy Seawall Repairs Advertisement for Bids

PDF, High priority: read this firstadvertisement
High

Demolition Section 02 41 16 Specifications

PDF, High priority: read this firstspecifications
High

Doc 00 21 13.1 - Electronic Bidding Instructions

PDF, High priority: read this firstelectronic-bidding-instructions
High

Doc 00 41 00 - Bid Form

PDF, High priority: read this firstbid-form
High

Doc 00 45 19 - Non-Collusion Affidavit

PDF, High priority: read this firstwage-determination
High

Doc 00 45 19 - Non-Collusion Affidavit and Federal Contract Requirements

PDF, High priority: read this firstcontract-document
High

Doc 00 72 00 - General Conditions: Material and Equipment

PDF, High priority: read this firstspecifications
High

Doc 00 73 00 00 - Contract Closeout Procedures

PDF, High priority: read this firstsow
High

Earthwork Section 31 20 00 Contract Language Requirements

PDF, High priority: read this firstspecifications
High

Excavation, Backfill and Compaction Specifications Section 31 23 33

PDF, High priority: read this firstspecifications
High

Instructions to Bidders - EBID

PDF, High priority: read this firstinstructions-to-bidders
High

Landscape Protection Section 01 56 39

PDF, High priority: read this firstspecifications
High

PA Heavy and Highway Construction Wage Determination PA20260004

PDF, High priority: read this firstwage-determination
High

Payment Bond Document 00 61 13.16 for Grundy Foundation Project

PDF, High priority: read this firstpayment-bond
High

Performance Bond Document 00 61 13.13

PDF, High priority: read this firstperformance-bond
High

Performance Bond Document 00 61 13.13 for Grundy Foundation

PDF, High priority: read this firstperformance-bond
High

Quality Control Section 01 40 00

PDF, High priority: read this firstspecifications
High

Section 01 12 00 - Summary of Work (Bulkhead Recoating)

PDF, High priority: read this firstsow
High

Section 01 22 00 - Measurement and Payment

PDF, High priority: read this firstspecifications
High

Section 01 26 73 - Bituminous Material Price Adjustment

PDF, High priority: read this firstspecifications
High

Section 01 29 00 - Contract Considerations

PDF, High priority: read this firstspecifications
High

Section 01 31 00 - Coordination and Meetings

PDF, High priority: read this firstspecifications
High

Section 01 32 16 - Narrative Construction Schedule

PDF, High priority: read this firstspecifications
High

Section 01 32 36 - Audio-Videotaping Specifications

PDF, High priority: read this firstspecifications
High

Section 01 33 00 - Submittals

PDF, High priority: read this firstspecifications
High

Section 01 33 00 - Submittals Procedures

PDF, High priority: read this firstspecifications
High

Section 01 40 00 - Quality Control

PDF, High priority: read this firstspecifications
High

Section 01 42 13 - Organization and Reference Acronyms

PDF, High priority: read this firstspecifications
High

Section 01 50 00 - Construction Facilities and Temporary Controls

PDF, High priority: read this firstspecifications
High

Section 01 56 39 - Landscape Protection

PDF, High priority: read this firstspecifications
High

Section 01 57 13 - Soil Erosion and Sediment Control

PDF, High priority: read this firstspecifications
High

Section 01 57 14 Erosion Control Blanket Specifications

PDF, High priority: read this firstspecifications
High

Section 01 71 13 Mobilization Appendix

PDF, High priority: read this firstsow
High

Section 07 92 00 Sealants and Caulking Specifications

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Bucks County
ContactsNo contacts available
OfficeBucks County, PA, USA
Organization / AgencyPennsylvania → Bucks County
Office AddressBucks County, PA, USA
ContactsNo contact information available

Interested Companies (67)

Resteel gbarron@resteel.com
Minichi
ConstructConnectCincinnati, OH

See All 67 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
This contract consists of a base bid involving site preparation work for cleaning and recoating the bulkhead with a carboline splash zone product extending from Station 0+00 to 2+68. The Scope consists of cleaning and preparing the existing streel sheet piles to an SSPC-SP10 finish, repairing any identified holes, and applying new band-coating. The award will be contingent upon all applicable requirements of 24 CFR Part 58, including but not limited to the completion of the environmental review process and the receipt of an executed Authority to Use Grant Funds (HUD-7015.16) from the Department of Housing & Community Development. No award can be entered into prior to the date of receipt of the 7015.16.

More opportunities from Pennsylvania → Bucks County

Same awarding agency

NAICS: 238210
SLED
Emergency Back-Up Generator Replacement
Solicitation # Milford Township, Bucks County
Milford Township is soliciting sealed bids for a turnkey replacement of the emergency standby power system at the Municipal Building located at 2100 Krammes Road, Quakertown, Pennsylvania. The project involves the removal and disposal of an existing 60 kW generator and manual transfer equipment, the replacement of an undersized concrete pad with a new reinforced equipment pad, and the installation of a new 130 kW diesel-fueled standby generator. The scope includes a new 400-amp automatic transfer switch, consolidated utility service entrance equipment, all necessary electrical work, and a full initial fill of ultra-low sulfur diesel fuel. The installation must meet NFPA 110 level 2 compliance or greater and be EPA-certified for stationary use. Bids must be submitted online via PennBid by October 30, 2026, at 9:00 a.m. using forms provided by the Township. Required submission documents include a non-collusion affidavit, a 10% bid bond or certified check, and 100% performance and payment bonds. Qualified bidders must demonstrate experience with comparable industrial or governmental installations and identify a factory-authorized service organization for warranty and emergency support. The award will be based on a single lump-sum turnkey price. Final acceptance is contingent upon a successful two-hour resistive load-bank test and the delivery of closeout documents, including as-built electrical diagrams and a minimum two-year manufacturer's warranty.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

9 days ago

DEADLINE

in 2 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS