Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

GS Capital Project: Progressive Design-Build Services for North County Crisis Residential Treatment Facilities

Closed
25116-2State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation, falling under NAICS code 236220. The solicitation was posted on October 17, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is designated as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise Good Faith Efforts (GFE) is mandatory to secure project financing and avoid being deemed non-responsive. Bidders must adhere to six specific GFE requirements, including outreach, subcontracting strategies, and the utilization of the Small Business Administration (SBA) and Minority Business Development Agency (MBDA). Crucially, proof of GFE #2, which requires online solicitation postings for 30 consecutive days and a one-day print newspaper posting, and proof of GFE #5 regarding SBA/MBDA utilization must be submitted within the bid package. Documentation for outreach efforts under GFE #1 may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 7 hours ago

DEADLINE

in 16 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site work is required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project is scheduled for completion within 915 calendar days and is divided into four distinct phases: site preparation, including soil stabilization and bypass piping; construction of the plant featuring a packaged Membrane Bioreactor (MBR) system, SCADA, and support buildings; decommissioning and demolition of existing facilities; and the completion of finish facilities, including the Walnut Avenue extension for various water and sewer services. A critical requirement of the project is maintaining the existing plant's operations and regulatory compliance throughout the first two phases of construction. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business categories, including VOSB, SDVOSB, WOSB, and DBE. The project mandates a local hiring goal requiring 50 percent of the total construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026.
C. Overaa & Co.

POSTED

about 7 hours ago

DEADLINE

in 22 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site preparation such as clearing, rock excavation, and grading, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Significant demolition work is required for 18 existing magazines and two specific buildings. Technical requirements encompass a wide range of trades including structural steel, concrete with rigid inclusions and load transfer mats, electrical utilities, plumbing, mechanical systems, and fire protection. Specialized installations include overhead cranes, intrusion detection systems, and grounding and lightning protection. The project also involves paving access roads, landscaping, and managing impacts to existing wetlands through mitigation. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact to receive bid invitations and access necessary documentation before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 7 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The County of Santa Barbara is soliciting Statements of Qualifications from Design-Build Entities for the progressive design-build of two new, independent 16-bed Crisis Residential Treatment (CRT) facilities located on the North Branch Jail campus. The project is divided into two phases: Phase 1 focuses on planning, design, and preconstruction to establish a Guaranteed Maximum Price (GMP), and Phase 2 covers the remaining design, procurement, and construction. The facilities must be all-electric, solar-ready, and compliant with the County's Zero Net Energy Policy. The project is supported by Bond Behavioral Health Continuum Infrastructure Program (BHCIP) Round 2 funding, with a total program agreement not to exceed $20,000,000.16 and a Phase 2 target budget of approximately $19,000,000. The procurement process utilizes a two-step selection method based on a cumulative score from the Statement of Qualifications, a cost proposal, and an interview. Short-listed firms must provide a GMP proposal and undergo a technical interview. Key requirements include a valid California Class B Contractor's License, adherence to a Community Workforce Agreement, and participation in an Owner Controlled Insurance Program (OCIP). The project is anticipated to reach final completion in February 2029, with liquidated damages for delays set at $5,000 per calendar day. All work must comply with the project's Environmental Impact Report and the Mitigation Monitoring and Reporting Plan.

General Info

Santa Barbara County seeks design-build entities for two 16-bed crisis facilities under $20M.

Documents

16

RFQ #25116-2 Addendum #1 - North County CRT

PDF, High priority: read this firstamendment
High

RFQ 25116-2 Addendum #2 - North County CRT

PDF, High priority: read this firstamendment
High

RFQ #25116-2 Addendum #3 - North County CRT

PDF, High priority: read this firstamendment
High

RFQ 25116-2 Attachment C Insurance Requirements and Instructions

PDF, High priority: read this first44 pages · sow
High

RFQ 25116-2 Attachment H Potential Conflict of Interest Disclosure

PDF, High priority: read this first2 pages · conflict-of-interest-disclosure
High

RFQ 25116-2 North County Crisis Residential Treatment Facilities

PDF, High priority: read this first32 pages · rfq
High

SBCo RFQ 25116-2 Attachment A Project Templates & Responsibility Matrix

PDF, High priority: read this first6 pages · sow
High

SBCo RFQ 25116-2 Attachment B - Performance and Payment Bond Instructions

PDF, High priority: read this first2 pages · sow
High

SBCo RFQ 25116-2 Attachment E Bid Form

PDF, High priority: read this first2 pages · bid-form
High

SBCo RFQ 25116-2 Attachment F Sample Form of Agreement

PDF, High priority: read this first18 pages · contract-document
High

SBCo RFQ 25116-2 Attachment G Community Workforce Agreement

PDF, High priority: read this first48 pages · community-workforce-agreement
High

SBCo RFQ 25116-2 Attachment J - County of Santa Barbara General Conditions

PDF, High priority: read this first35 pages · general-conditions
High

SBCo RFQ 25116-2 Attachment M - North County Crisis Residential Treatment Facilities Preliminary Program Report Oct 2025

PDF, High priority: read this first46 pages · preliminary-program-report
High

SBCo RFQ 25116-2 Bond BCHIP Round 2 Program Funding Agreement

PDF, High priority: read this first175 pages · contract-document
High

SBCo RFQ 25116-2 Attachment D Corporate Structure Questionnaire

PDF, Low priority2 pages · questionnaire
Low

SBCo RFQ 25116-2 Attachment K - North Branch Jail Environmental Impact Report

PDF, Low priorityenvironmental-impact-report
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline time changed from 7:00 AM UTC to 11:00 PM UTC on Sep 16, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → County of Santa Barbara
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Requesting Statement of Qualifications from qualified Design-Build Entities to provide progessive design-build services for the the County of Santa Barbara's North County Crisis Residential Treatment Facilities Project.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS