This project involves the removal and disposal of a 400 gallon Quaker City Iron Works LP Air tank and approximately 40 feet of abandoned 1.5 inch copper piping. The scope of work includes modifying a 4 inch steel pipe to tie into a 3 inch copper line for the B-77H perimeter manifold, installing a new isolation valve, and ensuring a 36 inch aisle is created at the former tank site. Additionally, the contractor must re-feed the 1.5 inch copper line for B-756, install a new isolation valve, retain the existing quick connect, and add six wall-mounted pipe supports. All piping must be ASTM A53/A53M Grade B Schedule 40 black carbon steel, painted blue to match existing systems, and installed as Class D service per ASME B31.3 and UFGS 43 15 00.00. A critical requirement is for the contractor to take gasket samples for asbestos testing. The requested period of performance is from October 5 to October 6, 2024, and bidders must provide a separate option for weekend work.

General Info

Remove air tank and piping, modify lines, install valves, and test for asbestos.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

ML: PENNS, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Mid-Atlantic
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Remove and dispose of 400 gallon LP Air tank, manufactured by Quaker City Iron Works. Remove and dispose of approximately 40' of abandoned 1-1/2" copper line heading east from tank location. Modify 4" steel pipe that feeds existing tank and tie it into 3" copper line supplying B-77H perimeter manifold. Install a new isolation valve on the 4" line and modify pipe such that there is a new 36" aisle where tank is currently located. Install hangers/pipe supports for modified pipe and connection point. Also, re-feed the 1-1/2" copper line feeding B-756. Install a new isolation valve on the 1-1/2" copper line and retain existing quick connect on line. Add approximately six wall mounted pipe supports for existing 1-1/2" copper line so that line is properly supported. Piping shall be ASTM A53/A53M, Grade B carbon steel, Schedule 40, black. All pipes shall be painted with blue paint to match existing piping. All material shall be procured, installed, and tested per UFGS 43 15 00.00. All piping shall be considered Class D service and installed per ASME B31.3. Submit a bid option to perform work on a weekend. Customer requested start date October 5th. Customer requested period of performance, 10/5/24-10/6/24. ***PLEASE GET CONTRACTOR TO TAKE SAMPLES FROM GASKETS TO TEST FOR ASBESTOS*** DATE SUBMITTED: 7/5/24 TF-1#NSWC-0064-25

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 8 hours ago

DEADLINE

in 5 days
View Details

More opportunities from Department Of The Navy → Navfac Mid-Atlantic

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS