Guldmann Patient Ceiling Lift - Marion IL

Closed
36C25526Q0472Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 339112
New
Federal
SPS Sterilizer
Solicitation # 36C24526Q0758
Solicitation 36C24526Q0758 is a Firm-Fixed Price purchase order issued by the Department of Veterans Affairs for the procurement, delivery, and installation of five new steam sterilizers for the Sterile Processing Service at the Baltimore VA Medical Center in Maryland. The government is seeking Belimed brand or equal equipment with specific requirements, including a chamber volume of at least 275 L and a tray capacity of at least five trays. The project involves a two-phase installation process to maintain continuous operations, requiring the contractor to handle the de-installation and disposal of existing equipment, site preparation, utility reconnection, and the provision of ICRA plans and barriers. System validation and assembly must be performed by an OEM service-trained representative. The award will be based on a comparative evaluation of technical capability, price, and past performance to determine the most advantageous offer to the government. Mandatory submission requirements include a completed SF1449, a specific line-item pricing worksheet, and manufacturer authorization letters for distributors. All quotes must be submitted as FOB Destination. The contractor is required to maintain specific insurance coverages, including 500,000 dollars per occurrence for general liability and 200,000 dollars per person for automobile liability. The response deadline for this unrestricted solicitation is September 14, 2024.
245-NETWORK Contract Office 5 (36C245)

POSTED

about 18 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The Marion VA Health Care System is seeking a contractor to provide comprehensive turn-key installation of permanent ceiling-mounted patient lift systems across existing facilities in Marion, Illinois, with a focus on modernizing outdated infrastructure built between the early 1900s and 1950s that feature limited ceiling clearance and complex utility layouts. The scope includes full design, site evaluation, removal of existing systems, installation of new ceiling lift systems, and a buy-back proposal for decommissioned equipment. All new lifts must have a minimum lifting capacity of 770 lbs, operate with smooth, controlled motion, and be designed as X-Y room-covering rail systems to maximize space utilization. Installation must not rely on existing hangers, Unistrut, or utility supports; all structural attachments must connect solely to building load-bearing components. The contractor must submit detailed room-specific plans, mechanical anchor designs, anchoring drawings to structural concrete, and a phasing installation schedule that minimizes disruption to patient care, prioritizing low-traffic periods such as weekends or off-peak days. All work must comply with VA Seismic Guidelines (H18-8), International Building Code IBC 2006, National Electric Code, Life Safety Code, Joint Commission standards, and ISO EN 60601-1 and ISO EN 10535 for medical and patient handling equipment. Door frames may not be modified unless a licensed structural engineer certifies the changes and the VA approves them. Technical requirements mandate that all new lift systems undergo 150% weight testing at all suspension points and traverse rails, with deflection measurements documented and verified by the VA COTR before acceptance. The contractor must provide written certification of seismic compliance for each installation and complete standardized checklists from VACO Patient Safety Alert AL14-07PSA for installation, relocation, and preventive maintenance, signed by the technician, facility representative, and unit manager. All personnel performing maintenance or installation must be factory-certified by Guldmann and adhere to Universal Precautions when handling equipment with potential bloodborne pathogen exposure, using personally provided PPE. Dust containment and post-installation cleaning are required, including tacky mats at entrances and thorough vacuuming or wet wiping of all surfaces. A two-year warranty on equipment and five-year warranty on installation must be provided, alongside an extensive training program for all staff including biomedical personnel on usage, inspection, and annual weight testing procedures. The contractor must submit a detailed follow-up support plan covering repairs,

General Info

Install ceiling patient lift systems with Guldmann certification, seismic compliance, 770 lb capacity, and full VA-regulated turn-key services.

Agency

Department Of Veterans Affairs → 255-NETWORK Contract Office 15 (36C255)View Agency

NAICS

339112 - Surgical and Medical Instrument ManufacturingView NAICS

Place of Performance

Marion, IL, 62959, USA

Set-Aside

NONE

Documents

(1)

Sources Sought Notice for Guldmann Patient Ceiling Lifts Installation - Solicitation 36C25526Q0472

PDFsources-sought

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 255-NETWORK Contract Office 15 (36C255)
Contacts1 person available
OfficeLEAVENWORTH, KS, 66048, USA
Organization / Agency
Department Of Veterans Affairs → 255-NETWORK Contract Office 15 (36C255)
View Agency Profile
Office AddressLEAVENWORTH, KS, 66048, USA

Full Description

Show more

Marion, IL


Statement of Work


Patient Ceiling Lifts



Background:


The Marion VA Health Care System is seeking a contractor to furnish all design, site evaluation, labor, materials, and equipment to install permanent ceiling mounted patient care lifts in existing facilities. Many hospital buildings were constructed in the early 1900-1950’s and have limited above ceiling clearance. Additionally, numerous utility systems occupy this space and must be considered when installing new equipment above the ceiling. It is strongly recommended that the contractor perform a thorough site evaluation prior to submitting a proposal.



Scope of Work:


The Contractor shall provide a technical and cost proposal for turn-key services to install patient lift systems in accordance with this scope of work. This cost proposal shall be for providing installation of all new and removal/de-installation of all lift system equipment including but not limited to; slings, lift devices, rails, support material, bracing and all other associated components required for complete, functional installation for ceiling lift in with scale and continuous charge ceiling lift systems. This proposal is also a request for the vendor to provide a buy-back proposal for any old systems that are removed. This proposal shall also be for installation of the lift systems including but not limited to any required plans, engineering details and documents, tools, labor, testing, training, cleaning supplies, containment systems, etc.  All new lift systems must have a lifting capacity of no less than 770 lbs.  The rail systems must be designed, constructed, and installed in an X-Y (room-covering) design; in such a manner as to allow for maximum utilization of patient room space. Operation of the system must be smooth with no fast or jerky starts and stops.  Operation of the system must allow for adequate lifting height allowing for transfer of patient from bed.  Track systems shall be self supporting either from the ceiling or from a post mounted system as required due to existing conditions. Existing hangers, Unistrut, or other support components shall not be utilized to support the lift tracks. No existing utility systems or supports shall be used for support or for bracing of the lift system. All new supports must be connected directly to building structural components.






Technical Requirements:



  1. Contractor shall provide a plan for each room detailing location of lift rails, support structure above, and means of attachment.
  2. The lift systems must meet or exceed seismic bracing requirements as outlined in the VA Seismic Guidelines (H18-8). A written report certifying compliance with this standard shall be provided to the facility for each lift installation.
  3. Door frames are not to be cut or modified. If contractor proposes to cut or modify an existing door frame, documentation supporting this practice and providing modification procedures must be provided and certified by a licensed structural engineer and accepted by the VA.
  4. All lifts shall be weight tested prior to acceptance. Test weight shall be 150% of rated capacity and shall be applied to all points of suspension and traverse rail.  Prior to testing, contractor shall submit rail deflection testing standards to the VA. Testing shall be observed by the VA COTR and a written report shall be provided following each test. The report shall include deflection measurements taken at locations of maximum deflection during the weight test. All deflection points shall be within defined code limitations.

Certified contractor will not perform any work/preventive maintenance inspections in an area/room occupied by a patient. Unless otherwise approved by contract COR (or designee), certified contractor will be required to perform all work during the hospital normal business hours (M-F 8:00 AM – 4:30 PM) excluding federal holidays. Contractor will provide all travel, labor, parts, test equipment (to include weight set), tools, and incidentals necessary to perform all required inspection services. Any overtime needed that would cause an increasing in invoicing must receive prior approval by the VISN Contracting Officer, through the COR (or designee).


All services for this contract must meet manufacturer's performance and technical specifications, Federal Regulations, and other specifications that may apply such as National Electric Code (NEC), Life Safety Code (LSC), Joint Commission (JC), and VA Regulations. There is a potential for exposure to blood borne or other infectious material with equipment throughout the hospital.


All contractor maintenance persons must use the “Universal Precautions” during cleaning and maintenance/repair procedures required by this service request. Contractor will be responsible for providing their own Personal Protective Equipment as applicable.


A Guldmann certified contractor must annotate all aspects of annual inspection performed on the Guldmann annual inspection checklist to include: date and time of completed preventive maintenance; type, model, and serial number of the lifting system on which preventive maintenance was performed, maintenance performed and all repairs and/or repair parts (if applicable) used to maintain operating efficiency per manufacture specifications of the equipment. The Guldmann contractor will also complete checklists for Installation or Relocation Checklist for Ceiling Mounted Patient Lifts and/or Corrective and Preventive Maintenance Checklist for Ceiling Mounted Patient Lifts as outlined in VACO Patient Safety Alert AL14-07PSA. The applicable checklist must be completed and signed by the inspector/technician, the facility representative, and the unit manager where the work is done. The annual inspection checklist along with the VA inspection checklists (as applicable) shall be sent to the applicable facility POC (BMET, Facilities, or SPHM Facility Coordinator).


  1. Final equipment certification shall be provided in writing prior to acceptance by the VA.
  2. Any lift installation that modifies the function of a room’s privacy curtains shall be addressed by lift installer. The mitigation plan must be submitted to and approved by the VA.
  3. Prior to a manufacturer mismatch between lift motor and rails both manufacturers must have submitted in writing to the Contracting Officer that the rail system and lift assemblies are compatible and supportable, including the power and charging mechanisms, and provide testing results; the lift assembly manufacturer agrees to do preventive maintenance according to the checklist contained within Patient Safety Alert AL14-07 (Appendix B) and their own procedures; and the lift assembly manufacturer accepts all liability and warranty related to the lift assembly and the rail system structure once they have installed their lift assemblies on the rails.
  4. Ceiling lift manufacturers must allow and warrant the use of their lifts with the full range of Guldmann and EMR Distributors loop slings.
  5. Lift installation shall include dust containment during installation. All rooms shall be returned to the VA in their original condition. Any damage inflicted shall be corrected by the contractor. Contractor shall provide tacky mats at each entrance to the area where work is being done. Upon completion of installation all surfaces shall be vacuumed and/or wet wiped to remove dust/debris.  Guldmann certified contractor will be required to perform a complete and comprehensive Preventive Maintenance Inspection on any/all patient overhead lifting systems in any VISN 15 facility that will meet and comply with original equipment manufacturer certification specifications and also include deflection testing as required in Veterans Affairs Central Office (VACO) Patient Safety Alert AL14-07PSA Checklists for Installation or Relocation Checklist for Ceiling Mounted Patient Lifts and/or Corrective and Preventive Maintenance Checklist for Ceiling Mounted Patient Lifts.


Contractor shall provide the following to be considered for award:



  1. Disclosure of all Tort claims against vendor either pending or resolved regarding proposed system.
  2. Education/Training Plan by vendor on use of all equipment, after installation completion, with specific time lines -- all shifts, all areas and possibly refresher courses.  Include training plan for Bio-Medical staff which details any annual weight testing/inspection requirements required system warranty/certification
  3. Standardization of location of charging units in identified rooms.
  4. Written plan for installation of track lift system as applicable including mechanical anchor designs.
  5. Written plan for modifying existing structural, mechanical, electrical and other infrastructure systems if necessary.
  6. Provide drawings to show how rail system will be anchored to the structural concrete.
  7. Provide a specific time line for installation. 
  8. Provide an installation Infection Control Plan that meets the facility’s infection control risk assessment requirements.
  9. Provide an Installation Plan including phasing and indicating time per unit with minimum interference with patient care.  Example: installed on days when patient population is down, possibly weekend or Monday and Friday.  The least amount of disruption to patient’s comfort and care is expected. 
  10. A two year warranty on equipment and five year warranty on installation shall be provided to each facility.
  11. Specify all previous work done by vendor in VISN 15.  Is it complete, including all training?
  12. Provide Plan of Equipment Certification after install. 
  13. Provide Plan reflecting availability of vendor for follow- up, to include but not limited to: repairs, adjustment, sling replacement after installation is complete; and address after hours and weekend response during warranty period.
  14. Initial set up must include expendable accessories, such as slings. Provide one non-disposable, or two disposable, slings per lift, as per facility specifications. 
  15. Shall submit enough product information to allow the Government to evaluate the product(s) being offered. 
  16. Equipment installed shall be subject to the following Specs:

  • Available  as UL listed full-system installations (UL 60601-1)
  • Up to 26’ span for unspliced rail
  • 23’4” traverse rail span capability at 770 lbs.
  • 20’ traverse rail span capability at 1,000 lbs.
  • Supplier system engineered lateral bracing brackets (Not after market)
  • Optional InfraRed remote control of lift available
  • Optional InfraRed remote control of lateral movement for motor and traverse rail
  • O.S.H.P.D. (California seismic resistance) approved system installations available
  • Rust/stain-resistant, single-bar-design hangar bar with integrated bearing-swivel and closed-cell

handgrip; available in multiple sizes


  • 100% motor testing before shipment
  • In-field-serviceable software-based controller boards
  • Anodized aluminum rail finish to prevent flaking, chipping, fading, or peeling
  • Over-speed safety governor on motor
  • Soft start/stop control
  • Visual low battery indicator
  • Battery charger is splash proof and double insulated, provides continuous charge at all times, in any location within overhead rail system
  • Sound level of lifting motor to be less than or equal to 52dB(A)
  • Emergency switch to offer disengagement then emergency lower at controlled speed
  • All installations are completed by Factory Certified, US installers.
  • Available  UL certification of entire installation; as opposed to UL listing on the transformer only
  • Provision of system approval on room covering according to ISO EN 60601-1 Medical Equipment
  • Provision of system approval on room covering according to ISO EN 10535 Safe Patient Handling Equipment
  • Installation hardware meets IBC 2006 (International Building Code) standards


Payment will be made monthly in arrears upon receipt of a properly prepared invoice, referencing all lifting systems that received the Required Services the contract number and assigned purchase order number.



Personnel Qualifications


Contractor personnel performing preventive maintenance inspections and repair services must be fully qualified as per the original manufacture technical certification requirements.


Listing of equipment to be covered under the Required Services as stated in paragraph1 above.



More opportunities from Department Of Veterans Affairs → 255-NETWORK Contract Office 15 (36C255)

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS