Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Guynn Bridge Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Guynn Bridge Replacement Project, identified by solicitation number BUT-59478-R2, involves the demolition and replacement of a structurally deficient single-lane bridge over the Lindo Channel in the City of Chico, Butte County, California. The project scope includes the construction of a new 90-foot precast prestressed concrete box beam single-span bridge featuring two 11-foot travel lanes, five-foot shoulders, and a six-foot sidewalk on the east side. Technical requirements include the installation of concrete abutments on deep foundations and the application of approximately 80 cubic yards of rock slope protection as scour countermeasures. The project is subject to several regulatory approvals and environmental mandates, including a Streambed Alteration Agreement from the California Department of Fish and Wildlife and approval from the Central Valley Regional Water Quality Control Board. Under the California Environmental Quality Act, the project was determined to have no significant environmental impact, provided that specific mitigation measures and monitoring plans are followed. Necessary site preparations include the removal of riparian trees and vegetation, such as elderberry shrubs, to facilitate construction. The project is located at latitude 39.74359 and longitude -121.87591.

General Info

Replacement of Guynn Bridge in Chico, California, featuring a new concrete box beam.

Agency

California → City of Chico

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(2)

Notice of Determination for Guynn Bridge Replacement Project BUT-59478-R2

PDFnotice-of-determination

5A04CR00376 Guynn Bridge Replacement Project CEQA Notice of Determination

PDFceqa-notice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Chico
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Chico
Office AddressN/A
Contacts
Samantha MorfordEnvironmental Scientist

Full Description

Show more
The project is located at the Guynn Avenue Bridge over Lindo Channel, in the City of Chico, County of Butte, State of California; Latitude 39.74359, -121.87591 (WGS 84 datum, decimal degrees); Section 21, Township 22N, Range 01E, U.S. Geological Survey (USGS) map Ord Ferry.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 7 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS