Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Guynn Bridge Replacement Project

Forecast
BUT-59478-R2State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Guynn Bridge Replacement Project, identified by solicitation number BUT-59478-R2, involves the demolition and replacement of a structurally deficient single-lane bridge over the Lindo Channel in the City of Chico, Butte County, California. The project scope includes the construction of a new 90-foot precast prestressed concrete box beam single-span bridge featuring two 11-foot travel lanes, five-foot shoulders, and a six-foot sidewalk on the east side. Technical requirements include the installation of concrete abutments on deep foundations and the application of approximately 80 cubic yards of rock slope protection as scour countermeasures. The project is subject to several regulatory approvals and environmental mandates, including a Streambed Alteration Agreement from the California Department of Fish and Wildlife and approval from the Central Valley Regional Water Quality Control Board. Under the California Environmental Quality Act, the project was determined to have no significant environmental impact, provided that specific mitigation measures and monitoring plans are followed. Necessary site preparations include the removal of riparian trees and vegetation, such as elderberry shrubs, to facilitate construction. The project is located at latitude 39.74359 and longitude -121.87591.

General Info

Replacement of Guynn Bridge in Chico, California, featuring a new concrete box beam.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Chico
Contacts2 people available
OfficeN/A
Organization / AgencyCalifornia → City of Chico
Office AddressN/A
Contacts
Samantha MorfordEnvironmental Scientist

Full Description

Show more
The project is located at the Guynn Avenue Bridge over Lindo Channel, in the City of Chico, County of Butte, State of California; Latitude 39.74359, -121.87591 (WGS 84 datum, decimal degrees); Section 21, Township 22N, Range 01E, U.S. Geological Survey (USGS) map Ord Ferry.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. This comprehensive infrastructure project requires a wide array of specialized services and materials, including land surveying, site photography, tunneling, boring, jacking, micro tunneling, and the installation of utilities, cathodic protection, and steel casing. Additional requirements encompass site preparation, shoring, subsurface investigation, SWPPP, asphalt paving, landscaping, and the supply of ready mix and precast concrete. The solicitation is open to qualified Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. A critical requirement is that responsible subcontractors and material contractors must provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a response deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237310
New
SLED
STP-011-2(046) VOLCANO RD REHAB, OSHIRO RD TO ALII KOA ST
Solicitation # B27000729
The Hawaii Department of Transportation is soliciting bids for the Volcano Road Rehabilitation project, spanning from Oshiro Road to Alii Koa Street in Lanai, Hawaii. The scope of work focuses on comprehensive roadway reconstruction and maintenance, including cold planing, resurfacing, the reconstruction of weakened pavement areas, pavement marking and striping, guardrail improvements, and the installation of milled rumble strips. Key deliverables include the leveling of roadway dips using A.C. Mix No. V and the deployment of Type II OM warning signs. The project mandates strict adherence to environmental mitigation, including NPDES Permit requirements for water pollution and erosion control, and requires that all lanes remain open during morning peak hours from 6:00 a.m. to 8:00 a.m. Contractual compliance requires the submission of performance and labor and material payment bonds, as well as certifications for Workers' Compensation and Temporary Disability Insurance. The project is subject to the Davis-Bacon and Related Act and the Contract Work Hours and Safety Standards Act. Technical acceptance is based on the Mean Roughness Index for pavement smoothness, with specific HMA tolerances for asphalt content and mixture temperature. Specialty items for the project include hot mix asphalt pavement, guardrails, and work zone traffic control. Bidders must submit their proposals via the HIePRO portal, with a virtual pre-bid conference scheduled for November 16, 2026.
Department of Transportation

POSTED

about 19 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237310
New
SLED
Downtown Traffic Management Project Components 1 and 2 - Intelligent Transportation System (ITS) and Wilson Street Improvements
Solicitation # 2095-SCP
The City of Rock Hill is soliciting competitive bids for the Downtown Traffic Management Project, which is divided into two primary scopes: Component 1, focusing on the Intelligent Transportation System (ITS), and Component 2, involving Wilson Street Improvements. The ITS component requires the installation of Dynamic Message Signs, Blank-Out Signs, CCTV, and fiber optic infrastructure, including a specific 90-day window for conduit installation following the Notice to Proceed. The Wilson Street Improvements involve widening the roadway from two to three lanes with the addition of bike lanes, milling, resurfacing, and ADA ramp installations. The project has a substantial completion timeline of 730 calendar days. Bidders must be SCDOT prequalified and submit their proposals electronically via the OpenGov eProcurement Portal by November 18, 2026, at 2:00 p.m. Required submission materials include a 5% bid guaranty, proof of prequalification, AIA document A305, and signed certifications regarding lobbying and debarment. The contract will be awarded to the responsible and responsive bidder offering the lowest Total Base Bid. Awardees must adhere to the Davis-Bacon Act, the Build America, Buy America Act, and NIST cybersecurity frameworks for any access to SCDOT electronic data. Payment terms include a 30-day processing window with a 10% retainage withheld until project completion.
Project Management

POSTED

about 19 hours ago

DEADLINE

in 11 days
View Details

More opportunities from California → City of Chico

Same awarding agency

NAICS: 237990
SLED
Big Chico Creek Erosion Repair Project (Capital Project No. 50497)
Solicitation # 253
The Big Chico Creek Erosion Repair Project (Capital Project No. 50497) is a series of bank stabilization and erosion repair efforts managed by the City of Chico in Butte County, California. The project focuses on three primary locations: the Rose Avenue bridge crossing, the Warner Street bridge crossing, and the western creek bank near the intersection of Manzanita and Vallombrosa Avenues. The scope of work includes the removal of riparian vegetation, regrading of eroded undercut areas, and the installation of rock slope protection (RSP) to address scouring caused by heavy winter storms. Key deliverables include the implementation of temporary water diversions for in-water work and the revegetation of disturbed areas using native or approved non-invasive species. The project is subject to strict environmental and regulatory compliance, having been reviewed by the California Department of Fish and Wildlife and the Central Valley Flood Protection Board. All work must adhere to a Mitigated Negative Declaration and a Mitigation Monitoring and Reporting Program to protect critical habitats for CCV steelhead and CVSR Chinook salmon. Critical operational constraints include a restricted in-water work window from July 15th to September 30th, mandatory pre-construction nesting bird surveys between February 1st and September 30th, and a 30-day curing period for poured concrete excluded from the channel. Additionally, the contractor must follow specific protocols for the discovery of cultural resources or human remains and adhere to city-mandated noise restrictions for heavy equipment.
Other Heavy and Civil Engineering Construction

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237110
SLED
Chico Airport Sewer Pond Repair Project (Capital Project No. 50358)
Solicitation # Capital Project No. 50358
The Chico Airport Sewer Pond Repair Project, identified as Capital Project No. 50358, is an infrastructure upgrade initiative led by the City of Chico in Butte County, California. The primary objective of the project is to prevent overflow wastewater from discharging into an abandoned holding pond and mixing with stormwater runoff at a former wastewater treatment plant located southeast of the Chico Regional Airport. Key deliverables include the abandonment and replacement of a storm drain line with approximately 345 feet of 12-inch high-density polyethylene pipe, the installation of a real-time wastewater level sensor in the sewer flow control vault, the construction of a new sewer manhole downstream from the sewer siphon, and the creation of an all-weather crushed rock access road for year-round maintenance. The project is governed by the California Environmental Quality Act and has been supported by a Mitigated Negative Declaration. The California Department of Fish and Wildlife has issued Streambed Alteration Agreement EPIMS Notification Number BUT-65579-R2, confirming that the installation of the stormwater outfall, including the flared end section and rock slope protection, will not have a significant environmental effect. Special contract requirements include strict adherence to cultural resource discovery protocols, requiring an immediate work halt and notification to City of Chico Public Works Engineering if human or non-human remains are uncovered. The project is located on Assessor's Parcel Numbers 047-550-001 and 047-550-006.
Water and Sewer Line and Related Structures Construction

POSTED

9 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS