Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Gypsum Board and Interior Painting

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of 2140817.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Village of Southampton Police Station LULA Elevator Replacement - REBID

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNew York → Village of Southampton
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs wall/ceiling assembly and final decorative coating for prime contractors on Village of Southampton Police Department projects. Installs moisture and sag resistant gypsum wallboard and performs Level 4 finishing. Applies paint systems to concrete masonry, gypsum board, and metal doors using Sherwin-Williams or Benjamin Moore ProMar 200 Zero VOC. Complies with MPI standards and ASTM C 840. Delivers finished, painted interior walls and ceilings.

Similar Contracts

Same NAICS industry code

NAICS: 238310
New
SLED
State Laboratories Division SLD FY27 Duct Insulation
Solicitation # SLD ADMIN 27-006
The State Laboratories Division (SLD) of the Hawaii Department of Health is soliciting proposals under solicitation SLD ADMIN 27-006 for the removal and replacement of HVAC ductwork insulation and the sealing of air leaks. The primary objective of this project is to implement a work plan that minimizes or eliminates the need to shut down HVAC chillers and air handlers. The project is governed by the AG-008 General Conditions and requires the contractor to adhere to all OSHA and HIOSH safety standards, as well as prevailing wage laws for public works. For contracts valued at $50,000 or more, performance and payment bonds equal to 100 percent of the contract price are required. Award will be granted to the responsible offeror whose proposal is most advantageous to the State, scored out of 100 points. The highest weight is placed on the ability to complete the scope of work within the timeframe (30 points), followed by total cost (15 points), warranty coverage (10 points), material quality (10 points), risk assessment (10 points), and past performance (5 points). Proposals must be submitted electronically via the Hawaii State e-Procurement (HIePRO) system by January 7, 2027. Payment is issued within 30 calendar days of receipt of a satisfactory invoice, provided the contractor submits a tax clearance certificate from DOTAX and the IRS.
Department of Health

POSTED

1 day ago

DEADLINE

in about 2 months
View Details

More opportunities from New York → Village of Southampton

Same awarding agency

NAICS: 238290
New
SLED
Village of Southampton Police Station LULA Elevator Replacement - REBID
Solicitation # 2140817
The Village of Southampton is soliciting bids for a fixed-price contract to replace the LULA elevator at the Village Police Station. The scope of work requires the contractor to provide all labor, materials, and equipment necessary to install a complete, code-compliant elevator system, including the coordination of electrical work with Day Elevator shop drawings and the performance of insulation resistance testing on existing feeders. The project must adhere to strict safety and quality standards, including ASME A17.1 / CSA B44, NY Labor Law Article 33, and OSHA construction regulations. Award will be granted to the lowest responsible bidder who demonstrates sufficient financial resources, organizational management, and relevant experience with projects of a similar scope. Contractors must comply with NYSDOL prevailing wage rates and provide a performance bond and a labor and material payment bond, each for 100 percent of the contract sum. Work must commence within 10 days of signing the contract. Rigorous packaging and storage requirements are mandated to prevent equipment damage, and all electrical labeling must meet ANSI and NFPA standards. Bidders must submit their proposals by hand or mail by December 17, 2026, ensuring all bid forms are completed without the use of correction tape to avoid disqualification. The contractor is also responsible for employing an independent NY State Licensed testing agency to verify the installation.
Other Building Equipment Contractors

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS